Sec. 75-33. - Termination of drain lines laid in watercourse.
Storm drain lines laid under streets in subdivisions may be terminated at the top of the slope when the line is laid in a natural watercourse, provided that, in the opinion of the engineer, the line is of such size or topographic conditions are such that it would be impractical to extend the drain lines to the subdivision boundary.
(Ord. No. 4536, § 3, 10-24-05)