33.284.040 Design Review
A.
Purpose. Design review is required for new buildings in the C and EX zones to ensure that the
development has a high design quality appropriate to the desired character of the zone and to
avoid the monotonous look of many industrial-style buildings.
B.
Design review required. In the C and EX zones, all Self-Service Storage uses to be located in
newly constructed buildings must be approved through Design review.
C.
Procedure. Design review for Self-Service Storage uses is processed through a Type II
procedure. However, uses that require design review because of an overlay zone or plan
district are processed as provided for in those regulations.
D.
Design review approval criteria. A design review application will be approved if the review
body finds that the applicant has shown that the Portland Citywide Design Guidelines have
been met. If the site is within a design district, the guidelines for that district apply instead of
the Portland Citywide Design Guidelines. Design districts are shown on maps 420-1 through
420-4. Where two of the design districts shown on those maps overlap, both sets of guidelines
apply.
(Amended by: Ord. No. 188177, effective 5/24/18; Ord. No. 188958, effective 5/24/18; Ord. No. 190477,
effective 8/1/21; Ord. No. 191079, effective 3/31/23; Ord. No. 191779, effective 10/1/24.)
The City of Portland is committed to providing meaningful access. To request translation, interpretation,
modifications, accommodations, or other auxiliary aids or services, contact 311, Relay: 711.
503-823-4000: Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या
口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad
Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas
www.portland.gov/bps/accommodation