§ 42-710 — Permit requirements
Wilmington City Code, Delaware (Supp. No. 72: codified through Ordinance No. 25-073, enacted December 11, 2025) · Wilmington City Code § 42-710
Corpus is an independent public-information project, not the official City of Wilmington website. Stable reference: corpuslaw.us/code/8c47e1e3-7757-49ca-be61-67791d79a2a7
Sec. 42-710. - Permit requirements.
(a) Permit at work site. A copy of the approved permit or permit reference number shall be present at the site of the work during periods of actual work. (b) Duration of permit. The approved construction permit will be valid for a period of 90 days following issuance of such permit unless otherwise stipulated. Once work has begun it shall continue according to acceptable industry practice. (c) When the city in its capacity as a utility engages in any activity that includes an excavation in the paved portion of a public street, the city shall keep a record of the date, location, purpose, and size of the excavation. (d) Emergency activity. A utility may conduct emergency activity in the paved or unpaved area of the public streets that is necessary for the preservation of life, health, or property or for the restoration of interrupted service, without first obtaining a permit therefore provided that: (1) The utility notifies the city of the activity as soon as possible but no later than 24 hours after the activity is conducted; and (2) Within three business days, the utility applies for any permit that would otherwise have been necessary for the activity.
(Ord. No. 07-002(sub 2) § 2(Exh. A), 4-19-07; Ord. No. 08-078, § 1, 12-3-08)
Ask a question about Wilmington law
Corpus searches the Wilmington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
