18.70.040 - General requirements for phased construction.
When the building contains three (3) or more levels, the work specified in this chapter shall be permitted to be done in the following phases. Work shall start with Phase 1 unless otherwise approved by the Building Official. When the building does not contain the conditions shown in any phase, the sequence of retrofit work shall proceed to the next phase in numerical order. A. Phase 1 Work. The first phase of the retrofit work shall include the ground floor portion of the wood structure that contains parking or other similar open floor space. B. Phase 2 Work. The second phase of the retrofit work shall include the walls of any level of wood construction with two (2) or more levels above, which are laterally braced with nonconforming structural materials. C. Phase 3 Work. The third and final phase of the retrofit work shall include the remaining portions of the building up to, but not including, the top story as specified in Subsection 18.70.050.B.
(ORD-25-0019 § 1(Exh. A), 2025; ORD-22-0033 § 1(Exh. A), 2022; ORD-19-0031 § 1(Exh. A), 2019; ORD-16-0026 § 1(Exh. A), 2016)