§ 8-2-3 — ASPHALT PAVING
City Code of West Jordan, Utah (2026 S-39: code current through Ord. 26-41, passed 7-28-2026) · West Jordan City Code § 8-2-3
Corpus is an independent public-information project, not the official City of West Jordan website. Stable reference: corpuslaw.us/code/8ce3fa8b-3651-41b6-8919-9f87d38f3188
8-2-3: ASPHALT PAVING:
Asphalt paving operations shall not begin until all utilities, including, but not limited to, electrical power, natural gas, telephone, cable television, culinary water, irrigation water, sanitary sewer and storm sewer are installed under the streets. Provisions shall be made for future installation of signalized intersections, electrical power, natural gas, telephone and cable television through sleeves or conduits placed under the pavement. The city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. shall not be responsible for coordinating the timely installation of these utilities, and the city administrator or designee may require evidence of such coordination prior to or as a condition of any approvals or permits involving asphalt paving. (2001 Code § 89-6-405; amd. 2009 Code; Ord. 19- 48, 12-11-2019, Effective at 12 noon on January 6, 2020)
Ask a question about West Jordan law
Corpus searches the West Jordan sections it holds and shows the ones that match, with their citations. Free, no sign-in.
