§ 44-275 — Construction obligations
Code of Ordinances, City of Round Rock, Texas (Supp. 27: codified through Ordinance of August 13, 2026 (online updated November 5, 2026)) · Round Rock Code of Ordinances § 44-275
Corpus is an independent public-information project, not the official City of Round Rock website. Stable reference: corpuslaw.us/code/8d05984e-a3fb-429e-be6f-6ae3c375a70d
Sec. 44-275. - Construction obligations.
A utility company is subject to reasonable police power regulation of the city to manage its public rights-of-way in connection with the excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of facilities in the public rights-of-way, pursuant to the city's rights as a custodian of public property based upon the city's historic rights under state and federal laws. Such regulations include, but are not limited to the following: (1) At the city's request, a utility company shall furnish the city accurate and complete information relating to the excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of facilities performed by the utility company in the public rights-of-way, as set forth herein and in the DACS. Information provided to the city pursuant to this subsection may be designated by the providing utility company as confidential and will be kept confidential by the city to the extent allowed by law. (2) A utility company shall perform excavations and other construction in the public rights-of-way in accordance with all applicable city ordinances. All excavations and other construction in the public rights-of-way shall be conducted so as to minimize interference with the use of public and private property. Any facility placed within the public rights-of-way that is attached in any manner above ground shall either be placed on existing poles or equipment or be attached in accordance with the National Electrical Safety Code. A utility company shall follow all reasonable construction directions given by the city in order to minimize any such interference. (3) A utility company shall be required to utilize trenchless technology wherever the proposed construction crosses any portion of a paved public street, public or private driveways, or the critical root zone of a protected tree, as those terms are defined by section 14-20; provided, however, that in exceptional cases where particular field conditions prevent the use of trenchless technology, the director has the discretion to grant a waiver of this requirement. a. A utility company may be required to utilize trenchless technology wherever the proposed construction crosses any portion of a public sidewalk or occurs in an area of the city that is significantly developed. The director may waive this requirement if he determines based upon information provided by the utility company that the use of trenchless technology is not economically acceptable or technically feasible. b. A utility company will not be required to utilize trenchless technology wherever the proposed construction is in an undeveloped area and does not cross any portion of a paved public street, public or private driveways or the critical root zone of a protected tree. (4) A utility company shall use its best efforts to coordinate construction and installation of facilities, including collocation of poles for aerial facilities and joint trenching, with any other utility companies which may be constructing in and along the same public rights-of-way. The city may mandate such coordination to the fullest extent allowed by law. (5) To the extent known, plans for ongoing repair, maintenance and improvements that involve cutting into paved city roads or streets shall be submitted to the city on an annual basis, no later than April 1 of each year, and updated based upon any changes. This does not require any proprietary information, such as equipment or customer specific information. Such information may be designated confidential, and to the extent allowed by law, will be kept confidential by the city. Alternatively, a utility company may meet with the appropriate representative of the city each calendar quarter to provide such plans to the extent known. (6) Construction permits. a. Except as provided in subsections (6)c. and (6)d. below, all utility companies must obtain a construction permit before performing any new construction or replacement, upgrading, excavation, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of facilities in the public rights-of-way. The permit will be in the name of the utility company who will own the facilities to be constructed. The permit must be completed and signed by a lawful representative of the owner of the facilities to be constructed. Failure to obtain a required construction permit will subject the utility company to a stop-work order from the city and enforcement action pursuant to this Code. b. Except as provided in subsections (6)c. and (6)d. below, a utility company must submit an application for a construction permit at least seven days prior to the proposed commencement of work in the request and must obtain the construction permit 48 hours prior to any excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of the utility company's facilities. The aforesaid seven-day and/or 48-hour requirement may be waived or altered by the city for good cause shown by the applicant. c. No permit is required for the installation of facilities necessary to provide primary or regular service to a customer's property or performing routine repair or maintenance of existing facilities, unless the utility company's activities require: 1. The breaking of the asphalt, concrete or similar surface of the public rights-of-way; 2. The installation of a pole within the public rights-of-way; 3. The installation of an appurtenance extending to or above the surface of the public rights-of-way within two feet of a curb, sidewalk, or driveway, or within public rights-of-way containing roadways without barrier curbs; 4. Excavation greater than three feet in depth or ten feet in length within the public rights-of-way; 5. The closure of a traffic lane; or 6. Boring within the public rights-of-way. d. No permit is required before performing emergency repair or maintenance; provided, however, that if such emergency repair or maintenance requires breaking of the asphalt, concrete or similar surface of the public rights-of-way, the utility company performing such work shall notify the director immediately, and in no event later than two hours, after the commencement of breaking of the asphalt, concrete or similar surface. Any utility company performing emergency repair or maintenance in the public rights-of-way that does not require the breaking of the asphalt, concrete or similar surface of the rights-of-way shall provide the director with notice of any work performed by the next business day from the commencement of such work. A utility company shall provide the director with a written, reasonably detailed description of emergency repair or maintenance work performed in the public rights-of-way and an updated map of any facilities that were relocated within 20 business days of completion of such work. In addition, the utility company shall comply with the requirements of this article for the restoration, replacement or repair of the public rights-of-way. e. If nonpavement excavation required for the installation of facilities necessary to initiate service to a customer's property or for routine repair or maintenance cannot be backfilled at the end of a business day, then the utility company performing the excavation shall fence off the excavated area. If such nonpavement excavation cannot be backfilled by the following business day, the excavation must be fenced off and a permit application must be submitted to the city the next business day. f. Insurance and bonding will be required in accordance with section 44-279 below. g. If the utility company fails to act upon any permit within 90 calendar days of issuance, the permit shall expire unless extended by the city upon a showing of good cause. Upon expiration of a permit, a utility company shall be required to obtain another permit pursuant to the requirements of this article. h. The permit shall state to whom it is issued, location of work, location of facilities, dates and times work is to take place, and any other reasonable conditions set out by the director. i. No permit shall be issued until the utility company requesting the permit provides the director, in the format specified by the city, the following: 1. The completed application with the approximate location and proposed routing of new construction or reconstruction of all facilities at least seven days before beginning construction or reconstruction that involves an alteration to the surface or subsurface of the public rights-of-way, unless otherwise approved by the director and the applicant's plan for right-of-way construction or reconstruction. A utility company may not begin construction until the location of new facilities and proposed routing of the new construction or reconstruction and all required plans and drawings have been approved in writing by the city, which approval will not be unreasonably withheld, taking due consideration of the surrounding area and alternative locations for the facilities and routing. In the event a utility company is required to commence construction within less than seven days in order to comply with service objectives set by the Public Utility Commission of Texas, the utility company shall provide notification of such requirement to the city with the completed application and the utility company may commence construction no sooner than one business day following submission of the application to the city; in the event the city subsequently reasonably withholds approval, the utility company shall adjust its application and any associated installed facilities to comply with the city's requirements. Furthermore, the utility company shall provide personnel to respond to the city's requests regarding the application on a reasonably continual basis for the business day after the time the application is submitted. 2. For review, one set of construction plans in an electronic format acceptable to the director, or two hard copy sets of construction plans. Upon approval of the application by the director, three sets of construction plans each with a copy of the approved application shall be delivered in hard copy to the director. Construction plans shall clearly display footages, reference points, tie-ins and proposed alignments of items being constructed. It is recommended that nonstructure construction plans be drawn to scale, but if not, they shall be of a size and of sufficient detail that is reasonably clear and readable as determined by the director. Construction plans for structures must be prepared on a recognized scale no smaller than one inch = 50 feet, unless otherwise approved by the director, and must be sealed by a professional engineer to the extent required by The Texas Engineering Practice Act (Article 3271a, Vernon's Texas Civil Statutes. 3. Except as provided below, the construction plans shall show all features as set forth herein. For utility construction involving the placement of new or replacement poles or utilizing underground trenchless technology, the construction plans shall show all features located within seven feet on either side of the proposed facilities. For utility construction utilizing excavated trenches, the construction plans shall show all features located within seven feet on either side of the excavation. The features that are required to be shown on the plans include existing underground and aerial wires or conduits, ducts, poles, wires, pipes, sewerage, water lines, and cables as well as their ownership; traffic signal and street light poles; fire hydrants; driveways; curbs, inlets and drains; sidewalks and wheelchair ramps; and trees and large shrubs. If the nature of the proposed facilities or specific site conditions warrants it, the director may increase the above distance to 50 feet. For construction within rights-of-way containing streets, roads, or highways, drawings shall show horizontal dimensions from the curb line or edge of pavement, or if a sidewalk exists, from the edge of sidewalk when not on the road or street side of the sidewalk, provided however, the director may require drawings to show dimensions from specific lines or features when a more uniform alignment would be achieved as determined by the director. Within other rights-of-ways, drawings shall show horizontal dimensions from property lines or easement lines. Drawings shall show elevation data including depth of installation and separation distances from other utilities. If typicals are used, they shall reference the station numbers for which they are to be applied. Traffic control plans shall be in conformance with the latest revision of the Texas Manual on Uniform Traffic Control Devices (TMUTCD). The director may accept construction plans which deviate from the standards contained herein, so long as good cause is shown, and such a deviation is applied in a competitively neutral, nondiscriminating manner. Regardless of the above, features other than those to be utilized by the utility company for its construction need not be shown for projects that entail the installation of additional or replacement equipment on existing poles, or the installation of additional ducts, inner ducts, or cable within existing conduit, and which do not entail either the installation of new poles or conduit, or the alteration of the surface or subsurface of the public rights-of-way. 4. Location of all public rights-of-way and utility easements which applicant plans to use. 5. Detail of all existing city utilities in relation to applicant's proposed route. 6. Description of what the applicant proposes to install, including but not limited to pipe size, number of conduits, and valves, with appropriate details attached. 7. Location of areas where asphalt or concrete in streets will be removed and replaced, with appropriate plans and details that include City of Round Rock Standard Construction Details and Development and Construction Standards (DACS), as appropriate. 8. Drawings of any boxes, trenches, handholes, manholes, switch gears, transformers, pedestals, etc. including depth located in public rights-of-way. 9. Handhole and/or manhole typicals of type of manholes and/or handholes applicant plans to use or access. 10. Complete legend of drawings submitted by the applicant. 11. Name, address and telephone numbers of the contractor or subcontractor who will perform the actual construction, including the name and telephone number of an individual with the contractor who will be available at all times during construction. Such information shall be provided as soon as it is known by the utility company, but in any event prior to the commencement of construction and shall be amended by the utility company as necessary during the course of the work by written notification to the director. 12. The construction and installation methods to be employed for the protection of existing structures, fixtures, and facilities within or adjacent to the right-of-way and the dates and times work will occur. 13. A copy of any permit or approval issued by federal or state authorities for work in federal or state right-of-way located within the city, if requested by the director. j. The director shall have the authority to place reasonable conditions and restrictions on the permit in order to protect the health, safety and welfare of the citizens of the city, as well as for the protection of property located within or adjacent to the right-of-way. k. All construction and installation in the public rights-of-way shall be accomplished by the utility company in strict compliance with the permit for the facilities. The director shall be provided access to the work and to such further information as may reasonably be required to ensure compliance with the permit. No deviation whatsoever from the permit shall be allowed without the director's approval in writing of a permit amendment. When conditions warrant, such permit amendment may be accomplished with a written amendment in the field. l. The director may inspect the site to ensure compliance with the permit and shall conduct a final inspection of the site and provide final approval of the work permitted. The director shall make a reasonable effort to complete the final inspection within five days following notification by the utility company that the project has been completed. Upon final inspection, if the director finds that the permit has not been complied with, the director will provide written notice to the utility company regarding the work to be performed in order to obtain final approval. m. Copies of the approved construction permit and approved engineering plans shall be maintained at the construction site and made available for inspection by the director at all times when construction or installation work is occurring. n. All construction or installation work authorized by permit must be completed in the time specified in the construction permit. If the work cannot be completed in the specified time periods, the permittee may request an extension from the director. The utility company shall notify the city's contact specified on the approved permit application at least one business day and no more than three business days prior to beginning the work authorized by the permit, or prior to continuing the work if work has been suspended for more than three business days. o. Requests for permits will be approved or disapproved by the director within a reasonable time of receiving all the necessary information. p. The director may require a preconstruction meeting with the permittee and construction contractor. q. If the director declares an emergency with regard to the health and safety of the citizens and requests by written notice the removal or abatement of facilities, or requests the relocation of a utility company's facilities in accordance with subsection 44-278(d), a utility company shall remove or abate the utility company's facilities by the deadline provided in the director's request. The utility company and the city shall cooperate to the extent possible to assure continuity of service. As stated in subsection 44-273(a)(1), a construction permit application fee is not required for city-initiated relocation projects. If the utility company, after notice, fails or refuses to act, the city may remove, relocate or abate the facility, at the sole cost and expense of the utility company, without paying compensation to the utility company and without the city incurring liability for damages. Upon receipt of an invoice from the city, the utility company shall promptly reimburse the city for all costs incurred by the city within 30 calendar days from the date of the city invoice. r. In determining whether any requirement under this article is unreasonable or unfeasible, the director shall consider, among other things, whether the requirement would subject the utility company to an unreasonable increase in risk or service interruption, or to an unreasonable increase in liability for accidents, or to an unreasonable delay in construction or in availability of its services, or to any other unreasonable technical or economic burden, and the utility's obligations as a provider of last resort pursuant to the provisions of the Texas Utilities Code. s. A utility company issued a permit pursuant to this article shall, at all times, employ the standard of care attendant to the risks involved to prevent actions, failures and accidents that may cause damage, injury or nuisance to persons, the public, the facilities of other utility companies, or to any city structures or structures owned by other utility companies located in the public rights-of-way. A utility company issued a permit pursuant to this section 10.900 shall observe all federal and state statutes and regulations and all applicable city ordinances and safety codes. A utility company issued a permit pursuant to this article shall keep and maintain its facilities in a safe and suitable condition, and in good order and repair.
(Ord. No. G-07-09-12-10E1, § I(10.906), 8-9-2007; Ord. No. G-10-06-10-8B1, § III, 6-10-2010)
Ask a question about Round Rock law
Corpus searches the Round Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.
