Inspections and Tests

49 C.F.R. Part 234, Inspections and Tests
in effect

49 C.F.R. § 234.247 Purpose of inspections and tests; removal from service of relay or device failing to meet test requirements.

49 C.F.R. § 234.249 Ground tests.

49 C.F.R. § 234.253 Flashing light units and lamp voltage.

49 C.F.R. § 234.255 Gate arm and gate mechanism.

49 C.F.R. § 234.257 Warning system operation.

49 C.F.R. § 234.259 Warning time.

49 C.F.R. § 234.261 Highway traffic signal pre-emption.

49 C.F.R. § 234.263 Relays.

49 C.F.R. § 234.265 Timing relays and timing devices.

49 C.F.R. § 234.267 Insulation resistance tests, wires in trunking and cables.

49 C.F.R. § 234.269 Cut-out circuits.

49 C.F.R. § 234.271 Insulated rail joints, bond wires, and track connections.

49 C.F.R. § 234.273 Results of inspections and tests.