§ 12.5.1207 — AFFIRMATIVE DEFENSES
City Code of Colorado Springs, Colorado (2026 S-22: current through Ord. 26-47, passed August 25, 2026) · Colorado Springs City Code § 12.5.1207
Corpus is an independent public-information project, not the official City of Colorado Springs website. Stable reference: corpuslaw.us/code/8dc62958-8dec-43c3-9b5b-7b411785c503
12.5.1207: AFFIRMATIVE DEFENSES:
A. Upsets: 1. Defined: An "upset" is defined as an exceptional incident which causes temporary and unintentional noncompliance with the discharger's categorical pretreatment standards because of actions beyond the reasonable control of the user. Upsets do not include incidents or noncompliance caused by: a. Operational error; b. Improperly designed treatment facilities; c. Inadequate treatment facilities; d. Lack of adequate preventative maintenance; e. Careless or improper operation of processes and treatment facilities; or f. A reduction, loss or failure of the user's treatment facility including, but not limited to, a power outage. 2. Claims: Claims of an upset shall constitute an affirmative defense to a charge that a user has violated a categorical pretreatment standard if and only if the following requirements are satisfied: a. The user must be able to identify the specific cause of the claimed upset; b. The user must establish prudent operation and maintenance of the facility at the time of the claimed upset; c. The user must demonstrate compliance with operation and maintenance procedures at the time of the claimed upset; d. The industrial user has submitted the following information to the POTW and Chief Executive Officer within twenty four (24) hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within 5 days): (1) A description of the indirect discharge and cause of noncompliance; (2) The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and (3) Steps being taken and/or planned to reduce, eliminate and prevent recurrence of the noncompliance. 3. Burden Of Proof: The burden of proving that an upset has occurred shall be on the user. 4. Reviewability Of Agency Consideration Of Claims Of Upset: In the usual exercise of prosecutorial discretion, enforcement personnel should review any claims that noncompliance was caused by an upset. No determinations made in the course of the review constitute final action subject to judicial review. Industrial users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards. 5. User Responsibility In Case Of Upset: The industrial user shall control production or all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost or fails. B. Bypass: 1. Prohibition Of Bypass: Bypass is prohibited, and the control authority may take enforcement action against an industrial user for a bypass, unless: a. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; b. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventative maintenance; and c. The industrial user submitted notices as required under subsection B4 of this section. 2. Approval Of Bypass By Control Authority: The control authority may approve an anticipated bypass, after considering its adverse effects, if the control authority determines that it will meet the three (3) conditions listed in subsection B1 of this section. 3. Bypass Not Violating Applicable Pretreatment Standards Or Requirements: An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of subsections B1 and B4 of this section. 4. Notice: a. Anticipated Bypass: If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the Chief Executive Officer, if possible at least ten (10) days before the date of the bypass. b. Unanticipated Bypass: An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the Chief Executive Officer within twenty four (24) hours from the time the industrial user becomes aware of the bypass. A written submission shall also be provided within five (5) days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The Chief Executive Officer may waive the written report on a case by case basis if the oral report has been received within twenty four (24) hours. C. General And Specific Violation Defenses: A user shall have an affirmative defense in any action brought against it alleging a violation of the general prohibitions in subsections 12.5.702H, I, and P of this article where the user can demonstrate that: 1. It did not know or have reason to know that its discharge, alone or in conjunction with an indirect discharge or indirect discharges from other sources, would cause pass-through or interference. The industrial user will need to submit data which supports this claim. Establishment of a prohibition, local limit or categorical standard for a parameter is considered notification to the industrial user that pass-through or interference is possible; and 2. A local limit designed to prevent pass-through and/or interference, as the case may be, was developed in accord with section 12.5.703 of this article for each pollutant in the user's discharge that caused pass-through or interference, and the user was in compliance with each local limit directly prior to and during pass-through or interference; or 3. If a local limit designed to prevent pass-through and/or interference, as the case may be, has not been developed in accord with section 12.5.703 of this article for the pollutant(s) that caused the pass-through or interference, and if the user's discharge directly prior to and during the pass-through or interference did not change substantially in nature or constituents from the user's prior discharge activity when the POTW was regularly in compliance with the POTW's permit requirements and, in the case of interference, applicable requirements for sewage sludge use or disposal. (Ord. 99-163; Ord. 01-42; Ord. 14-66; Ord. 18-42)
Ask a question about Colorado Springs law
Corpus searches the Colorado Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.
