For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-8 — Construction in the public right-of-way

Sarasota Code of Ordinances (Supplement33; through Ordinance26-5592, adopted April20,2026); partial · Sarasota Code § 30-8

Corpus is an independent public-information project, not the official City of Sarasota website. Stable reference: corpuslaw.us/code/8e4e67cc-2b04-4cb5-a0d5-2a58395317cb

Sec. 30-8 - Construction in the public right-of-way.

(a)

Drainage and flood control. All construction projects within the public right-of-way shall incorporate stormwater and drainage improvements in accordance with the updated sea-level rise design criteria and flood control standards outlined in chapter 5 of the Engineering Design Criteria Manual. All construction projects within the public right-of-way shall meet the 100-year flood design standard for stormwater conveyance.

(b)

Construction of utilities. All utility construction in the public right-of-way, including potable water, wastewater, and reclaimed water systems, shall comply with the updated standards in chapter 6 of the Engineering Design Criteria Manual (EDCM). Compliance shall include but not be limited to conformity to standards for jacking, boring, and horizontal directional drilling as outlined in sections 6.10 and 6.11 of the EDCM.

(Ord. No. 24-5551, § 2, 11-18-24)

Ask a question about Sarasota law

Corpus searches the Sarasota sections it holds and shows the ones that match, with their citations. Free, no sign-in.