§ 17.61.030 — Design Review
Pasadena Municipal Code, California (Supp. No. 79: codified through Ordinance No. 7469, enacted May 18, 2026) · Pasadena Municipal Code § 17.61.030
Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/8e58f46a-c4d6-4780-b906-16b8a6d28122
17.61.030 - Design Review
A. Purpose. Design Review is primarily intended to implement urban design-related goals and policies in the Land Use Element of the General Plan and Specific Plans to apply the City's adopted design guidelines to Design Review. More specifically, the purposes of Design Review are to: 1. Apply Citywide urban design-related goals and policies in the General Plan and Specific Plans and other design guidelines adopted by the City Council to ensure that new construction supports the best of the City's architectural traditions; 2. Encourage new structures that show creativity and imagination, add distinction, interest, and variety to the community, and are environmentally sustainable; 3. Promote architectural and design excellence in new construction and discourage poor-quality development; 4. Ensure that future development should: a. Reflect the values of the community; b. Enhance the surrounding environment; c. Visually harmonize with its surroundings and not unnecessarily block scenic views; and d. Avoid nostalgic misrepresentations that may confuse the relationships among structures over time. 5. Ensure that new landscaping provides a visually pleasing setting for structures on the site; 6. Promote the protection and retention of landmark, native, and specimen trees and if feasible mature canopy trees and other significant landscaping of aesthetic and environmental value; 7. Ensure that the design, quality, and location of signs are consistent with the character and scale of the structures to which they are attached and are visually harmonious with surrounding development; and 8. Promote the conservation, enhancement, preservation, and protection of historic resources. 9. Adopt conditions of approval and exactions that have an essential nexus and rough proportionality to the project including with regards to mobility, accessibility, public safety, landscaping/trees, and infrastructure, where conditions are not adopted by other review authorities of the City. B. Applicability. All projects, including public projects, are subject to Design Review in compliance with this Section, excluding exempted projects identified in Subparagraph 4, below. 1. Review authority. The review authority for Design Review is specified in Tables 6-3 and 6-4, below. 2. Design Commission may delegate to the Director. The Design Commission may delegate review and approval functions to the Director. 3. Role of design guidelines. a. Provide guidance. The approved design guidelines shall provide appropriate guidance to applicants and the applicable review authority (e.g., Design Commission or Director) on how projects subject to Design Review shall be evaluated. Applicable design guidelines include the design-related goals and policies in the Land Use Element of the General Plan, design-related goals and policies and/or design guidelines within an adopted Specific Plan, an approved Master Plan, or for specific zoning districts or for a particular type of new development. b. Consistency with design guidelines required. Design Review approval requires a finding of consistency with the applicable design guidelines. (See Subsection K. [Findings], below.) c. Adopting new or modified guidelines. The Design Commission shall review and comment on proposed new design guidelines, or modifications to existing guidelines, and shall forward a written recommendation to the Council for its consideration when adopting the new or modified guidelines. 4. Exemptions and limitations. The following projects are exempt or otherwise limited from Design Review in all districts: a. Projects not visible from public view. Projects that in their entirety are not visible from the public right-of-way. b. Projects with only partial public view. 1. Design Review shall concentrate on those exterior portions of the structure and related features that are in full or partial view from the public right-of-way. 2. Design Review may also consider interior courtyards and building elevations out of public view in order to improve the visual relationship between new construction and its surroundings, to create more open views and improved access to light and air, and to ensure that predominant architectural and landscaping treatments are appropriately incorporated into the secondary elevations and open space of the structure. c. Interior features and interior alterations. Interior features and interior alterations are exempt from Design Review unless they materially affect a structure's appearance from the public right-of-way. d. Signs. Signs having no words or symbols exceeding three inches in height and temporary signs and banners are exempt from Design Review. In addition, Signs listed in Section 17.48.040, Exempt Signs and Maintenance, are exempt from Design Review. e. Sites Identified in previous Housing Elements. Sites designated in previous Housing Elements and included in the current Housing Element Sites Inventory that provide at least 20 percent of housing units for lower-income households and which do not require a subdivision are exempt from Design Review. Objective design-related development standards may be applied through ministerial review. f. New single-family residences and duplexes. The proposed construction of new single-family residences and duplexes are exempt from Design Review, including projects proposing construction of multiple single-family residences or duplexes on separate lots. TABLE 6-3 - THRESHOLDS FOR DESIGN REVIEW AND DEMOLITION REVIEW IN THE CENTRAL DISTRICT** Project Type | Review Authority 1. New Construction. A. Nonresidential or Mixed-Use with Housing. Structures up to 5,000 sq. ft. | Director Structures greater than 5,000 sq. ft.* | Design Commission B. Multifamily Housing. Up to 10 dwelling units. | Director Greater than 10 dwelling units. | Design Commission 2. Existing Structures: Major Rehabilitation and Substantial Alterations. Adaptive reuse of existing structures from nonresidential to multifamily or mixed-use with housing. | Director All other structures up to 25,000 sq. ft.* | Director All other structures greater than 25,000 sq. ft.* | Design Commission 3. Existing Structures: Minor Rehabilitation and Minor Alterations. A. Walnut Transit and In-Town Residential. Historic resources. | Director B. All Other Subareas. All structures. | Director 4. New Storefronts and Alterations to Existing Storefronts. All structures. | Director 5. Signs. New signs on historic resources. | Director Building ID signs. | Director 6. Demolition Reviews; Relief from the Replacement Building Permit Requirement. Relief from the Replacement Building Permit Requirement. | Director Demolition of historic resources. | Design Commission *Sq. ft. means total amount of gross floor area expressed in square feet TABLE 6-4 - THRESHOLDS FOR DESIGN REVIEW OUTSIDE THE CENTRAL DISTRICT** Project Type | Review Authority 1. New Construction. A. Nonresidential or Mixed-Use with Housing. Structures 5,000 sq. ft. to 25,000 sq. ft.* (and visible from the public right-of-way). | Director Structures greater than 25,000 sq. ft.* | Design Commission B. Multifamily Housing. Up to 10 dwelling units. | Director Greater than 10 dwelling units. | Design Commission 2. Existing Structures: Major Rehabilitation and Substantial Alterations. Adaptive reuse of existing structures from nonresidential to multifamily or mixed-use with housing. | Director All other structures 5,000 sq. ft. to 50,000 sq. ft.* (and visible from the public right-of-way). | Director All other structures greater than 50,000 sq. ft.* | Design Commission 3. Signs. Building ID signs. | Director 4. Service Stations and Vehicle-washing Facilities. Major rehabilitation of an existing facility. | Director New construction of a new facility. | Design Commission *Sq. ft. means total amount of gross floor area expressed in square feet C. Scope and stages of Design Review. 1. Stages of Design Review. Design Review shall consist of the following three stages: a. Preliminary Consultation; (See Subsection D., below.) b. Concept Design Review; and (See Subsection E., below.) c. Final Design Review. (See Subsection F., below.) 2. Combining Design Review. The Director may authorize combining of Concept and Final Design Review into a one-step Consolidated Design Review. (See Subsection G., below.) D. Preliminary Consultation. 1. Purpose. Preliminary Consultation provides high-level Design Review comments early in the review process, prior to formal approval of zoning or design entitlements. Applications for Preliminary Consultation normally address the building program concept, response to site and context opportunities and constraints, conceptual site planning, architectural intent and conceptual building design. 2. Exemptions. As determined by the Director, Preliminary Consultation may be waived for smaller-scale projects requiring Design Review, such as signs, storefront alterations, or minor building alterations. 3. Procedures. Preliminary Consultation results in a list of design comments to assist the applicant in addressing the applicable design guidelines and is not a formal decision or entitlement. The following procedures apply to applications for Preliminary Consultation: a. Based on the thresholds in Tables 6-3 and 6-4 above, Preliminary Consultation applications for which the Director is the review authority shall be reviewed by the Director and Preliminary Consultation applications for which the Design Commission is the review authority shall be reviewed by the Design Commission. b. Upon completion of the review, the Director shall issue a letter documenting the comments. c. In conjunction with issuance of Preliminary Consultation comments, the review authority shall determine whether the remaining Design Review process may or may not be consolidated in accordance with subsection G, below. 4. Public hearing required. A public hearing shall be held on all Preliminary Consultation applications for which the Design Commission is the original review authority. The hearing shall be noticed and conducted in compliance with Chapter 17.76 (Public Hearings). 5. Period of validity. Preliminary Consultation comments shall be valid for three years and may be extended in accordance with Section 17.64.040.C. 6. Changes. Following completion of Preliminary Consultation, if a project design is substantially changed in a manner unrelated to the comments provided, the Director may deem the project to be a new project and may require a new Preliminary Consultation. Substantial changes may include, but are not limited to, height or floor area that is increased by 10 percent or more, substantially different architectural style/character, or other factors as determined by the Director. E. Concept Design Review. 1. Purpose. Concept Design Review is the primary step in the Design Review process. Applications for Concept Design Review normally address the basic design of a project, including compatibility with surroundings, massing, proportion, siting, solid-to-void relationships, and compliance with applicable design guidelines. 2. Procedures. Concept Design Review applications shall be processed in compliance with Chapter 17.60 (Application Filing and Processing) except as provided in this Section. 3. Public hearing required. A public hearing shall be held on all Concept Design Review applications for which the Design Commission is the original review authority. The hearing shall be noticed and conducted in compliance with Chapter 17.76 (Public Hearings). 4. Period of validity. Concept Design Review approval shall be subject to the validity provisions of Chapter 17.64 (Permit Implementation, Time Limits, and Extensions). F. Final Design Review. 1. Purpose. Final Design Review is the final phase of the review process. It normally focuses on construction details, finishes, materials, and landscaping, and on consistency of the project with the design approved during Concept Design Review and compliance with the conditions of the approved Concept Design Review. 2. Review authority. The review authority for Final Design Review shall be the same as for Preliminary Consultation and Concept Design Review, as specified in Table 6-3 and 6-4 above. 3. Public hearing not required. A public hearing is not required for Final Design Review. 4. Period of validity. Final Design Review approval shall be subject to the validity provisions of Chapter 17.64 (Permit Implementation, Time Limits, and Extensions). G. Consolidated Design Review. 1. One-step procedure. Consolidating Concept and Final Design Review applications into a one-step procedure shall be permitted for all housing projects when more than 50 percent of the total units are sold or rented to very low, low, or moderate-income households or for projects consistent with Section 17.50.165, Objective Design Standards for High-Density Housing. Adaptive Reuse Projects that meet the applicability criteria in Section 17.50.030.A. shall be subject to Consolidated Design Review procedures. The Director may authorize Consolidated Design Review for any other project. 2. Comply with Concept procedures. Applications for Consolidated Design Review shall be processed in compliance with the procedures for Concept Design Review. 3. Period of validity. The period of validity shall be the same as for Final Design Review. H. Expedited Design Review. 1. Awnings, paint colors, and signs. Applications for awnings, paint colors, and signs that meet the following criteria may be approved at the sole discretion of the Director, but with a five-day appeal period in compliance with Chapter 17.72 (Appeals): a. Application is to replace a similar item existing on the structure in the same general location (e.g., like for like); b. Awning fabric replacement; c. Change of a face panel or copy on an existing sign; d. Change of logo/graphics for an existing sign; e. Paint scheme changes; f. Replacing a projecting, flat-paneled sign on an existing bracket(s); and g. Wall-mounted sign with no interior illumination. 2. Required findings; Compliance with Zoning Code and consistency with design guidelines. In all cases the request shall comply with the awning and sign regulations in the Zoning Code and shall be consistent with the design guidelines — as determined to be applicable by the Director. I. Procedures. 1. Standard procedures. a. The provisions of Chapter 17.60 (Application Filing and Processing) shall apply to the Design Review process, except as modified by this Section. b. The procedures to appeals, expiration, performance guarantees, and revocation that are identified in Article 7 (Zoning Code Administration), and those identified in Chapter 17.64 (Permit Implementation, Time Limits, and Extensions), shall apply following the decision on a Design Review application. 2. Conditions of approval or changes to a project. a. General conditions of approval or changes to a project. Conditions of approval or changes may be applied to any development standard or project feature provided the conditions or changes are not more restrictive than those prescribed by the applicable zoning district regulation or a valid Adjustment Permit, Conditional Use Permit, Development Agreement, Master Plan, Planned Development, Variance, or other legislative or zoning entitlement. b. Sign area. The maximum allowable area may be reduced through the Design Review process to ensure compatibility/proportionality with historic resource. c. New and amended Master Plans and Planned Developments. Design Review shall be limited to recommendations to the Commission and Council on aesthetic and urban design issues related to architecture, landscaping, site plan, and related aesthetic issues, as well as historic preservation. Additionally, recommendations regarding the future scope of Design Review for the area within a Master Plan, and comments on the aesthetic/cultural resources of a draft environmental study are appropriate. d. Site plan. Design Review may require appropriate site plan revisions (e.g., different arrangements of open space), as well as revisions to the proposed building massing and transitions in scale of the structure(s), including in historic districts to achieve greater compatibility between new construction and existing historic resources. e. City Departments including Planning and Community Development, Public Works, Fire, Water and Power, and Transportation. When other review authorities do not review and condition the project, Design Review shall include the adoption of conditions of approval from City Departments to ensure that public improvements with an essential nexus and rough proportionality to the project are imposed. J. Findings. The following findings shall be made before approval of a Design Review application. 1. For all applications. The project's design is consistent with a. The purposes of this Section; and b. Any applicable design guidelines adopted by the Council. 2. Historic Resource Findings. a. Alteration or Relocation of Historic Resources. In addition to the two findings identified in Subparagraph 1., above, for projects requiring Design Review that involve the alteration or relocation of historic resources, the review authority shall also find that the alteration or relocation of the historic resource(s) is consistent with the Secretary's Standards. b. Alterations to Structures with 6L Status Code. In addition to the two findings in Subparagraph 1., above, for projects requiring Design Review that involve preservation of a structure with a 6L National Register of Historic Places status code ("eligible for special consideration in the local planning process"), the alteration to the 6L structure is consistent with the Secretary's Standards. c. Demolition of Historic Resources. In addition to the two findings identified in Subparagraph 1., above, for projects requiring Design Review that involve the demolition of historic resources, the review authority shall also find that the demolition of the historic resource(s) is consistent with the finding identified in Section 17.62.090.E.4.a and one of the findings identified in Section 17.62.090.E.5. d. Relief from the Replacement Building Permit Requirement in the Central District. The Director shall make the findings specified in Section 17.62.100.B to approve an application for Relief from the Replacement Building Permit Requirement in the Central District.
(Ord. No. 7468, § 3, 3-30-2026; Ord. No. 7464, § 14, 1-26-2026; Ord. No. 7443, § 5, 3-3-2025; Ord. No. 7419, § 4, 2-26-2024; Ord. No. 7414, § 11, 9-11-2023; Ord. 7372, §§ 7, 8, 2021; Ord. 7215, §§ 2—4, 2011; Ord. 7160, § 58, 2009; Ord. 7139, § 8 (Exh. 2, 3), 2008; Ord. 7129, § 4, (Exh. C), 2008; Ord. 7099, § 41, (Exh. 25), 2007)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.
