§ 25-48 — Permit types
Code of Ordinances, City of Tampa (Supp. No. 148: codified through Ordinance No. 2025-152, enacted December 18, 2025) · Tampa City Code § 25-48
Corpus is an independent public-information project, not the official City of Tampa website. Stable reference: corpuslaw.us/code/8e9f2324-f007-4041-ad65-1f7415c8932d
Sec. 25-48. - Permit types.
(a) Temporary street closures. (1) Required. When a planned event will cause or require one (1) or more of the following: a. Temporary obstruction of or redirection of normal traffic flow on public right-of-way or traffic control during abnormally high traffic caused by an event; b. City staff involvement before, during or after the event, such as, but not limited to: 1. Planning or consultation; 2. Police officers; 3. Traffic control technicians. (2) May be issued to. Any person. (3) Scope of work. The desired event is permitted after city review and approval of street closures, traffic-control plan approval and payment of all costs anticipated to be incurred by the city. (b) Parade permit. (1) Required. When a planned event will cause or require one (1) or more of the following: a. Temporary obstruction of or redirection of normal traffic flow on public right-of-way or traffic control during abnormally high traffic caused by an event; b. City staff involvement before, during or after the event, such as, but not limited to: 1. Planning or consultation; 2. Police officers; 3. Traffic control technicians. (2) May be issued to. Any person. (3) Scope of work. The desired event is permitted after city review and approval of street closures, traffic-control plan approval and payment of all costs anticipated to be incurred by the city. (c) Nonmotorized vehicle or pedicab permit. (1) Required. When a nonmotorized vehicle or pedicab operates upon the public streets of the city, city staff involvement is required before or after the event, such as, but not limited to: a. Planning or consultation; b. Police officers; c. Zoning. (2) May be issued to. Any person with an occupational license. (3) Scope of work. The nonmotorized vehicle or pedicab is permitted after city review and approval of the proposed route. (d) Queuing on sidewalk permit in Ybor City Historic District. (1) Required. When an event on abutting private property in the Ybor City Historic District will require the use and management of queuing lines on public right-of-way, provided, however, that the public right-of-way where the queuing line will be operated is no less than eight (8) feet in width. (2) Eligible permittee. May be issued to any person or organization in the Ybor City Historic District in good standing with the State of Florida that satisfies the requirements below. (3) Duration of permit. Each permit shall be valid for one (1) year, unless a shorter period of time is requested by the applicant. Any permit issued hereunder may be revoked or suspended as provided herein. (4) Application requirements. Each applicant shall present: a) evidence of commercial general liability insurance in the amount of one million dollars ($1,000,000.00) combined single limit each occurrence. All insurance shall remain in effect during the term of the permit, be from companies duly authorized to do business in the State of Florida, provide that the city is an additional named insured as to the operation of the queuing line, permittee shall be responsible for payment of any and all deductibles and shall contain a severability of interest provision. Thirty (30) days' written notice must be given the city of any cancellation or reduction in the policy coverages, b) a queuing line plan that identifies: a. A graphic depiction of the permittee's property in relation to the adjacent right-of-way that shows the permittee's property boundary, points of entry and exit, and location of all existing public improvements, including, but not limited to, benches, fire hydrants, and landscaping. The depiction shall include the distance (in feet) between objects and property boundary; and, b. Removable queuing line stanchion materials approved by the city; and, c. The proposed queuing line plan and pedestrian circulation pattern reserving and depicting a minimum 1.2 meter (4.0 feet) unobstructed pedestrian path and clearance over the right-of-way, excluding the curb and queuing line area, for non-queuing pedestrian traffic traveling over the right-of-way; and, d. Compliance with applicable fire code clearance requirement at building entry and exit points for the safe and unobstructed ingress and egress from the building; and, e. If applicable, that the queuing line plan preserves an uninterrupted flow of pedestrian traffic with any other queuing line on adjacent rights-of-way areas; and, f. The hours of operation, provided that the queuing line may not be in use for more than eight (8) hours in any twenty-four-hour period. (5) Queuing line equipment. All queuing line equipment and stanchions must be removable, not cause an obstruction in the right-of-way when removed and stored off the right-of-way when not in use. (6) Permit. The official shall issue a queuing line permit to each applicant that satisfies the application standards and operation requirements herein. (7) Permit renewal. Any person or organization to whom a queuing line permit has been issued under the provisions of this article shall be entitled to renew such permit from year to year; provided, however, that such person or organization be and remain in compliance with the provisions of this article and such other applicable ordinances, rules and regulations as shall be enacted or adopted from time to time by the city and shall pay the appropriate renewal fee and apply for the renewal no later than thirty (30) days prior to the expiration of the permit for which renewal is sought. (8) Permit suspension; revocation. Each permit shall be subject to the following conditions: a) all permits shall be automatically temporarily suspended and the queuing line removed by the permittee upon declaration of a state of emergency, upon the issuance of a tropical storm or hurricane warning or warning of severe inclement weather by the county and shall stay in effect until the state of emergency is lifted or the severe weather event is over; b) subject to reasonable notice, a permit may be temporarily suspended by the city for a permitted special event that will include the right-of-way permitted for the queuing line. Said notice shall, at minimum, identify the date, time and location of the special event as well as the period of temporary suspension of the permit, which shall not exceed the period of the special event. The official may revoke a permit if: the permit was issued by mistake of law or fact; the permit was issued upon a false statement or misrepresentation by the applicant; the queuing line is not operated in accordance with the approved queuing line plan or requirements of this chapter; or, payment of the permit fee or renewal fee was not effected due to insufficient funds or similar reason.
(Ord. No. 89-258, § 2(57-63), 10-5-89; Ord. No. 2006-287, § 2, 11-16-06; Ord. No. 2025-23, § 3, 3-6-2025)
Ask a question about Tampa law
Corpus searches the Tampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.