Sec. 22-58. - Permit procedures.

Application for a development permit shall be made to the floodplain administrator on forms furnished by him/her prior to any development activities, and may include, but not be limited to, the following plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, earthen fill, storage of materials or equipment, drainage facilities, and the location of the foregoing. Specifically, the following information is required: (1) Application stage. a. Elevation in relation to mean sea level of the proposed lowest floor (including basement) of all buildings, which will be submitted on a FEMA elevation certificate form by a state-registered engineer or surveyor; b. Elevation in relation to mean sea level to which any pre-FIRM residential or pre-FIRM nonresidential building, that has not been substantially damaged or improved, in an A or AE zone will be floodproofed; c. Certificate from a state registered professional engineer or architect that the pre-FIRM residential or pre-FIRM nonresidential floodproofed building will meet the floodproofing criteria in subsection (2) of this section and section 22-79(2); d. No floodplain development permit can be issued to any mobile, modular, or permanently constructed residence, building or facility unless the owner, lessee, or developer obtains a notice of intent from the state health department, pursuant to the Mississippi Individual On-Site Wastewater Disposal System Law (2009), for unsewered areas of the city; e. Description of the extent to which any watercourse will be altered or relocated as result of proposed development as outlined in section 22-59(4)b. (2) Construction stage. a. Upon placement of the lowest horizontal structural member or lowest floor (whichever is applicable per the flood zone), or pre-FIRM floodproofing by pre-approved construction means, it shall be the duty of the permit holder to submit to the floodplain administrator a certificate of the NAVD elevation as built in relation to mean sea level. Said certification shall be prepared by a state registered engineer or surveyor. When floodproofing is utilized for a particular building, said certification shall be prepared by a state registered engineer or architect, who is authorized by the state to certify such information and certified by same. Any approved floodproofing shall be required to be one foot above the base flood elevation. b. Any work undertaken prior to submission of the certification shall be at the permit holder's risk. The floodplain administrator shall review the lowest horizontal structural member or lowest floor (whichever is applicable per the flood zone) and floodproofing elevation certificate data submitted. The permit holder, immediately and prior to further progressive work being permitted to proceed, shall correct deficiencies detected by such review. Failure to submit the certificate or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project. c. In any lot or lots/areas that have been removed from the special flood hazard area via a letter of map revision based on fill, and if the top of fill level is below the freeboard elevation, all new structures, additions to existing buildings or substantial improvements must meet the required community freeboard elevation. (3) Finished construction. Upon completion of construction, a FEMA elevation certificate form which depicts all finished construction elevations is required to be submitted to the floodplain administrator. If the project includes a floodproofing measure, a FEMA floodproofing certificate is required to be submitted by the permit holder to the floodplain administrator.

(Ord. No. 3294, § 1(art. 4, § B), 9-7-2021)