10.30.220 - Post-construction requirements for specified projects; WQMP.
(a) For those projects specified in the provisions of section E.12 of the municipal NPDES permit, or where required by the nature and extent of a proposed project and where deemed appropriate by the city manager, every new development and redevelopment project applicant shall develop, submit to the city for approval, and implement a water quality management plan (WQMP).
(b) New development and redevelopment project applicants must prepare and submit the WQMP to the city manager prior to issuance of, or as a condition of, a subdivision map, site plan, grading or building permit, development or improvement plan or other similar city-issued permit.
(c) The WQMP shall include all proposed measures for site design, source control, runoff reduction, storm water treatment, baseline hydromodification management and LID techniques as specified in the municipal NPDES permit. Structural BMPs shall be required for all regulated projects specified in section E.12.c of the municipal NPDES permit, and such projects shall be designed so that the structural BMPs comply with the volume or flow design criteria specified in the municipal NPDES permit.
(d) In developing a WQMP, applicants shall comply with the following provisions and any WQMP manuals or guidelines as may be subsequently developed by the city as set forth in subdivision (j) of this section and are adopted by the city in accordance with the provisions of this chapter:
(1) All WQMPs must provide maintenance schedules for post-construction structural and treatment control BMPs, and for any required hydromodification and LID features (collectively referred to in the provisions of this subsection (d) only as "stormwater management facilities"), and a plan addressing the continued maintenance and operation responsibilities for such stormwater management facilities.
(2) The WQMP shall include at least one of the following to ensure continued proper operation and maintenance of the stormwater management facilities:
(A) A requirement that the project applicant/property owner enter into a formal stormwater management facilities operation and maintenance agreement with the city (the "owner's agreement") prior to the issuance of any certificate of occupancy. Such owner's agreement shall be recorded by the applicant/property owner with the County of San Bernardino against the property or properties involved, and such owner's agreement shall be binding on all subsequent owners of land served by the stormwater management facilities.
(B) For multi-unit residential projects, a requirement that the recorded conditions, covenants and restrictions (CC&Rs) covering the properties include written text stating that the homeowners association is required to operate and maintain the stormwater management facilities, or if there is no association, written text requiring each individual owner to assume responsibility for the operation and maintenance of the stormwater management facilities until such responsibility is legally transferred. Such CC&Rs shall run with the land and be enforceable against all subsequent owners and/or, homeowners associations, and their successors and assigns.
(C) Any other legally enforceable mechanism as approved by the city manager, such as recordation in the property deed, that assigns the operations and maintenance responsibility for the stormwater management facilities to the applicant/project owner or to the city.
(3) Such owner's agreement, CC&Rs and/or deeds shall at a minimum include conditions that that the applicant, owner or homeowner's association, and all subsequent owners, transferees, successors or assigns of such persons:
(A) Assume responsibility for maintenance and operation of all required stormwater management facilities to the MEP standard.
(B) Replace any degraded structural BMP feature with new control measures or BMP features meeting the current standards of the city.
(C) Conduct stormwater management facilities maintenance and inspections as required in the approved WQMP associated with the property.
(D) Ensure that all stormwater management facilities are inspected at least annually, and that proof be retained for such inspections for at least three years.
(E) Provide access to the city manager for the sole purpose of performing operations and management inspections of any installed stormwater management facilities.
(e) As a condition of occupancy for new development and redevelopment projects covered by this section, the city will require:
(1) The applicant, facility operators and/or owners, as appropriate, to construct all storm water pollution control BMPs, structural or treatment control BMPs, and LID features shown on the approved project plans;
(2) The applicant, facility operators and/or owners to submit, for review and approval, a BMP and LID maintenance schedule and inspection plan;
(3) The applicant to file a signed statement that the project site and all structural or treatment control BMPs and LID features shall be maintained in compliance with the WQMP;
(4) That any project including downspouts, roof gutters or subsurface drainage shall utilize perforated pipes, infiltration trenches, "French Drains" or similar systems, unless infeasible, impractical, prohibited by the city or site specific circumstances endanger public safety so as to prohibit its use as determined by the city; and
(5) The applicant/project owner to submit to the city the owner's agreement for recordation, the recorded CC&Rs, or the recorded enforceable mechanism/deeds set forth in the provisions of section 10.30.220(d) specifying the responsibility for and ensuring the continued operation and maintenance of post-construction structural and treatment control BMPs, and any required Hydromodification and LID features for the project.
(f) Each project implementing a WQMP shall be individually evaluated to ascertain if the proposed project is in substantial conformance with the approved WQMP prior to issuance of the certificate of occupancy.
(g) The WQMP must demonstrate to the city's satisfaction that proposed BMPs and LID features, numeric design criteria, or design elements meet the requirements of the municipal NPDES permit and this Code.
(h) The city manager shall review any proposed WQMPs. If a WQMP is not approved, the city manager shall provide the project applicant with a written explanation for the disapproval. Any disapproved WQMP must be revised by the project applicant and resubmitted to the city for approval before a project may proceed. No subdivision map, site plan, grading or building permit, development or improvement plan or other similar city-issued permit shall be issued until the city has approved the WQMP.
(i) Compliance with an approved WQMP shall be a condition of any required planning approval.
(j) The city may prepare maintain, update and adopt in accordance with the provisions of this chapter, a manual or other guidance document that includes urban and storm water runoff quantity and quality control development principles and technologies for achieving the LID standards described in this chapter. Such manual or guidance document may also include technical feasibility and implementation parameters, as well as other rules, requirements, forms and procedures as the city deems necessary for implementing this chapter. Alternatively, the city may adopt (in accordance with the provisions of this chapter) manuals developed by others that are deemed appropriate for use within the city.
(Ord. No. 2343, § 2, 10-20-15)