Reg. 62-110.2 — Income-producing capital equipment: manufacturing equipment; job printing equipment
Code of the City of Chandler (Supp. No. 80: codified through Ordinance No. 5171, adopted July 13, 2026) · Chandler City Code, Reg. 62-110.2
Corpus is an independent public-information project, not the official City of Chandler website. Stable reference: corpuslaw.us/code/8f9485ac-7012-4906-836c-50f8d6aea5c1
Reg. 62-110.2. - Income-producing capital equipment: manufacturing equipment; job printing equipment.
A. Manufacturing involves the change of tangible personal property into a new form of tangible personal property. This may involve activities often called "processing" or "fabricating." For example: making electronic parts in quantity, refining crude oil, pasteurizing milk, fabricating a mobile home, producing syrup for soft drinks from other ingredients. Therefore, there are four (4) reasons why an activity is not considered manufacturing, as follows, with examples. 1. The activity is specifically defined elsewhere in this chapter. For example: publishing; construction contracting; baking or cooking food (defined as restaurant activity). 2. The activity does not begin with a physical product ("raw materials"). For example: word processing; electronic data processing; photography; video or sound recording by a recording studio. 3. The activity does not physically change the raw materials into another form of tangible personal property. For example: sorting or "screening" sand, gravel, or rock; picking cotton; stuffing envelopes; chilling (but not freezing) water; cooling or heating air. 4. The "finished product" is not tangible personal property available for sale. For example: broadcasting by radio or television waves; cooling or heating air; electronic data processing. B. Manufacturing is limited to those activities involving the actual changing of tangible personal property into another form, and not to include any other activities of persons involved in the business of manufacturing. Therefore, 1. Items typically called "work in process" are often produced from "raw materials" or other "work in process" and then stockpiled until needed at a later stage in production (or perhaps sold in this form). For the purposes of this chapter, the activity of manufacturing is deemed to cease when the last act of physically combining, separating, or otherwise changing of this "work in process" ceases, and does not resume until such "work in process" is again used in the production process as "raw material" for such process. 2. "In-line" inspection procedures (between the 5th and 6th steps of an assembly process, for example) shall be deemed part of the activity of manufacturing, provided that the material so inspected is not physically removed from the location of the production process (removal to the quality assurance labs or the stockroom, for example, would be deemed to be removal from the physical location of the production process). Therefore, activities that occur in the quality assurance labs, stockroom, or other such locations are by definition not part of the activity of manufacturing. 3. Packaging shall be deemed part of the manufacturing activity if: a) The packaging process is an integral part of the production process, and b) The goods so packaged have come directly from the production process (or from an "in-line" inspection as defined above). 4. Only "in-line" materials handling shall be deemed as part of the activity of manufacturing, in a manner similar to "in-line" inspection procedures. Therefore delivery or the moving of materials up to and including delivery to the first stage of the production process (or the first stage of separate phase of production, when in reference to "work in process") is not part of the manufacturing activity. In like manner, delivery to the stockroom, quality assurance labs, or other such place not deemed part of the production process, and that all subsequent movement of such materials until they have once again entered the production process, are deemed not to be part of the activity of manufacturing. C. The activity of job printing shall be determined in a manner similar to that provided above relating to "manufacturing." D. The following items are specifically not included as machinery or equipment which is acquired for use primarily during the activity of manufacturing or job printing: 1. Equipment used primarily for the storage of materials when not being physically changed (for example, storage vats or bins, holding tanks). 2. Materials handling equipment (for example, dollies, fork lifts, hand trucks) not used directly "in-line." 3. Ancillary testing equipment of all kinds (for example, testing equipment in the quality assurance area or in the stockroom). 4. Ancillary packaging equipment of all kinds (for example, packaging equipment in the stockroom or mailroom). 5. (Reserved) 6. Any structural changes to real property (for example, plumbing or electrical changes to a structure, loading docks).
(Ord. No. 3046, § 3, 11-18-99)
Ask a question about Chandler law
Corpus searches the Chandler sections it holds and shows the ones that match, with their citations. Free, no sign-in.