54.120. - Responsibility following construction/completion.
(a) Duration. An approved Plan shall remain in effect unless cancellation is approved by the city engineer. All site areas used for the purpose of reducing pollutants and nutrients, for managing peak flow rates, and for maximizing infiltration shall be preserved and maintained for those uses, including areas required for maintenance and inspection. (b) Annual site registration. The responsible party of a BMP installed under this chapter shall register it annually with the city engineer and remit an annual registration fee at the rate established in the annual license fee schedule. (c) Inspection of BMPs. All BMPs are subject to inspection by the city engineer. If the city engineer deems that BMPs are not functioning satisfactorily, a notice of noncompliance may be issued, and procedures followed as described in section 54.130. (d) Operation and maintenance of BMPs. The entirety of the BMPs required under this ordinance shall be maintained and kept in operating condition by the owner at levels outlined in the approved Plan. Any failure to maintain a BMP and keep it in operating condition adequate to meet the water quality, rate control, and volume control requirements under this ordinance may result in the city engineer issuing remedial action per section 54.130.
(Ord. No. 2021-013, § 1, 3-12-21)