For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 27-24 — Regulations

Code of the City of Charleston, South Carolina (Supp. No. 115: codified through Ordinance No. 2026-092, enacted May 26, 2026) · Charleston, S.C., City Code § 27-24

Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/9046d355-7849-431b-973e-633a07f3aa9d

Sec. 27-24. - Regulations.

The department of stormwater management shall be responsible for day to day coordination, implementation, and enforcement of this article and the SWMP as well as the long-term management of the city's stormwater drainage. Without limitation, the department of stormwater management shall have the following authority: (1) To issue any approval, certification, or license that may be required to comply with this article; (2) To deny a facility connection to the city's stormwater management system or facility or to deny the discharge to receiving waters, if the state requirements and this article are not met; (3) To create and enact with city council's approval the city's Stormwater Design Standards Manual. The Stormwater Design Standards Manual shall be used to convey design and engineering standards, construction management processes and procedures, and other aspects necessary for compliance with this article; (4) To require the submittal of an application for all applicable construction activities, development activities, and re-development activities that result in activities altering an area of land: a. That at a minimum disturb one-half (½ acre or more and are not within one-half (½ mile of a receiving water. b That at a minimum disturb less than one-half (½ acre and that are within one-half (½ mile of a receiving water. c. Or other sites as deemed necessary by the director of stormwater management or his designee. These applications shall include a plan to control stormwater pollutants and other components detailed in the City Stormwater Design Standards Manual. (5) To require the development of a stormwater pollution prevention Plan (SWPPP) for all applicable construction, development and re-development projects and enforcement of the SWPPP; (6) To approve applicable construction, development, and re-development activities and to require as a condition of such approvals, structural or non-structural controls, practices, devices, operating procedures, or other mechanisms to protect public and private property from flooding and erosion and attain TMDL-mandated pollutant load reductions and water quality standards; (7) The department of stormwater management shall develop a process that organizes the closure of construction, development, and re-development projects to accommodate development phases and property ownership transfers; (8) To conduct all activities necessary to carry out the SWMP and other requirements included in this article, and to pursue the necessary means and resources required to properly fulfill this responsibility; (9) To require appropriate post construction, post development, and post redevelopment BMPs and appropriate continued maintenance of those BMPs; (10) To determine appropriate fees and to take necessary and appropriate actions to enforce this article; and (11) To require encroachment permits as necessary.

(Ord. No. 2007-158, § 2, 8-21-07; Ord. No. 2008-113, § 1, 9-19-08; Ord. No. 2017-110, § 1, 9-13-17; Ord. No. 2018-150, § 1, 11-27-18; Ord. No. 2019-039, § 1, 5-28-19)

Ask a question about Charleston law

Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.