§ 42-38 — Water and sewer fee schedule
Code of Ordinances, City of Olive Branch, Mississippi (Supp. No. 14: codified through Ordinance of June 17, 2025) · Olive Branch Code of Ordinances § 42-38
Corpus is an independent public-information project, not the official City of Olive Branch website. Stable reference: corpuslaw.us/code/90ac0884-8930-4a16-b016-ff72604ab4d6
Sec. 42-38. - Water and sewer fee schedule.
Inside City | Outside City Residential | Commercial | Residential | Commercial (1) | 3/4" Water Connection Fee (Includes Meter Cost) | $ | 600.00 | $ | 800.00 * | $ | 600.00 | $ | 800.00 * (2) | 1" Water Connection Fee (Includes Meter Cost) | $ | 600.00 | $ | 800.00 * | $ | 600.00 | $ | 800.00 * (3) | 3/4 or 1" Residential & H. O. A. Water Connection Fee Not Requiring Sewer Treatment (Includes Meter Cost) | $ | 75.00 | N/A | $ | 75.00 | N/A (4) | Commercial and Residential Water Connection Fees over 1" (Must Add Meter Cost) *All commercial must be reviewed by | 1 ½" | $ | 850.00 | $ | 850.00 | $ | 1,050.00 | $ | 1,050.00 Water Dept. before fees are paid | 2" | $ | 900.00 | $ | 900.00 | $ | 1,150.00 | $ | 1,150.00 3" | $ | 1,300.00 | $ | 1,300.00 | $ | 1,600.00 | $ | 1,600.00 4" or Larger | $ | 1,850.00 | $ | 1,850.00 | $ | 2,150.00 | $ | 2,150.00 (5) | Water Meter Cost (Includes Setter & Box if Applicable) 1 1/2" | Actual Cost | Actual Cost * | Actual Cost | Actual Cost * 2" | Actual Cost | Actual Cost * | Actual Cost | Actual Cost * *Includes MS Sales Tax | 3" | Actual Cost | Actual Cost * | Actual Cost | Actual Cost * 4" or Larger | Actual Cost | Actual Cost * | Actual Cost | Actual Cost * (6) | Meter Service (Includes repair, replacement, parts and raising or moving) | Actual Cost | Actual Cost | Actual Cost | Actual Cost (7) | Meter Testing | Actual Cost | Actual Cost | Actual Cost | Actual Cost (8) | Locate Meter and -or Tap | Actual Cost | Actual Cost | Actual Cost | Actual Cost (9) | Permit (3 Month Permit) | $ | 26.00 | $ | 26.00 | $ | 26.00 | $ | 26.00 (10) | User Fee | $ | 25.00 | $ | 25.00 | $ | 25.00 | $ | 25.00 (11) | Unauthorized Turn On | $ | 300.00 | $ | 300.00 | $ | 300.00 | $ | 300.00 (12) | Tampering and/or Removal | $ | 500.00 | $ | 500.00 | $ | 500.00 | $ | 500.00 (13) | Sewer Connection Fees | $ | 550.00 | $ 700.00 Plus $100 per Bay if Applicable | $ | 550.00 | $ 700.00 Plus $100 per Bay if Applicable
(Ord. of 4-16-24(1), § II)
Ask a question about Olive Branch law
Corpus searches the Olive Branch sections it holds and shows the ones that match, with their citations. Free, no sign-in.
