For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-32 — Duties and responsibilities of the city engineer

Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton City Code § 30-32

Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/90de45bb-c3db-4b7f-93c6-db4169e2b42d

Sec. 30-32. - Duties and responsibilities of the city engineer.

Duties and responsibilities of the city engineer, or designee, shall include but not be limited to the following: (1) Maintain and hold open for public inspection all records pertaining to the provisions of this chapter; (2) Review, and approve or deny, all applications for development permits required by section 30-33 of this chapter; (3) Review permits for proposed development to ensure that all necessary permits have been obtained from those federal, state, or local governmental agencies (including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334) from which prior approval is required; (4) Where interpretation is needed as to the exact location of the boundaries of the areas of special flood hazard, for example, where there appears to be a conflict between a mapped boundary and actual field conditions, the city engineer shall make the necessary interpretation; (5) Ensure that maintenance is provided within the altered or relocated portion of the watercourse so that the flood-carrying capacity is not diminished; (6) When base flood elevation data has not been provided in accordance with section 30-6, the city engineer shall obtain, review, and reasonably utilize any base flood elevation data available from any federal, state, or other source as criteria for requiring the new construction, substantial improvements, or other developments in zone A and meet the requirements of 44 C.F.R. 60.3 subsections (C)(2), (C)(3), (C)(5), (C)(6), and (D)(3) of the National Flood Insurance Program in order to administer the provisions of article III of this chapter. In unnumbered A zones and zone X, the one-hundred-year flood elevation shall be established through an engineering study, and this data shall be used for requiring the lowest floor elevation to meet or exceed the minimum building elevation. (7) Maintain on record in the engineering department the elevation of the lowest floor, including basement, of new and substantially improved structures within the floodway fringe or within two hundred (200) feet of the floodplain or SFHA with a FEMA Elevation Certificate. (8) Review permit applications to determine whether the proposed building site project, including the placement of manufactured homes, will be reasonably safe from flooding. (9) In riverine situations, notify adjacent communities, the Texas Water Development Board (TWDB), and the Texas Commission on Environmental Quality (TCEQ), prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency. (10) The city requires that no new construction, substantial improvements, or other development (including fill for areas draining greater than one (1) square mile) shall be permitted within the one-hundred-year floodplain, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the one-hundred-year water surface elevation at any point within the community, and that all provisions of Denton Development Code Subchapters 7.4 and 7.5 are met.

(Ord. No. 22-2064, § 2, 10-18-22)

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.