§ 19-80 — Publication of industrial users in significant non-compliance
Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 19-80
Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/91697596-3f22-451e-945f-6521193467ba
Sec. 19-80. Publication of industrial users in significant non-compliance.
a. Requirement to publish. The Manager shall publish annually, in the largest daily newspaper published in the City, a list of the industrial users which, during the previous twelve (12) months, were in significant noncompliance with applicable pretreatment standards and requirements. b. Definition of significant noncompliance. The term significant noncompliance shall mean: 1. Chronic violations of wastewater discharge limits, defined here as those in which sixty-six (66) percent or more of all the measurements taken during a six-month period exceed (by any magnitude) the daily maximum limit or average limit for the same pollutant parameter; 2. Technical review criteria (TRC) violations, defined here as those in which thirty-three (33) percent or more of all the measurements for each pollutant parameter taken during a six-month period equals or exceeds the product of the daily maximum limit or the average limit multiplied by the applicable TRC (TRC equals one and four-tenths (1.4) for BOD5, TSS, fats, oil and grease, and one and two-tenths (1.2) for all other pollutants except pH); 3. Any other discharge violation of a pretreatment effluent limit (daily maximum or longer term average) that the Manager determines has caused, alone or in combination with other discharges, interference or pass through (including endangering the health of City personnel or the general public); 4. Any discharge of a pollutant that has caused imminent endangerment to human health, welfare, or to the environment, or has resulted in the City's exercise of its emergency authority to halt or prevent such a discharge; 5. Failure to meet, within ninety (90) days of the scheduled date, a compliance schedule milestone contained in an industrial wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; 6. Failure to provide, within thirty (30) days after the due date, required reports such as baseline monitoring reports, 90-day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules; 7. Failure to accurately report noncompliance; 8. Any other violation or group of violations which the Manager determines will adversely affect the operation or implementation of the local pretreatment program. (Ord. No.O-96-4, 1-24-96) (Ord. No. 0-99-80, 10/20/99)
Ask a question about Tyler law
Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.
