§ 43-91 — Permit fees
Omaha Municipal Code (Supp. No. 100, Update 2: codified through Ordinance No. 44760, enacted August 4, 2026) · Omaha Municipal Code § 43-91
Corpus is an independent public-information project, not the official City of Omaha website. Stable reference: corpuslaw.us/code/91ebfdff-18fd-41ed-ad20-3326d22674ab
Sec. 43-91. - Permit fees.
Fees shall be assessed in accordance with the provisions of this section. The fee for each building permit shall be as set forth in Table 43-91. The determination of value or valuation for the purpose of assessing the permit fee shall be made by the building official. The value to be used in computing the building permit and plan review fees shall be the total value of all construction work for which the permit is issued. TABLE 43-91. BUILDING PERMIT FEES Total Valuation | Permit Fees $1.00 to $2,000.00 | $41.00 $2,000.00 to $25,000.00 | $41.00 for the first $2,000.00 plus $9.53 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 | $260.19 for the first $25,000.00 plus $6.44 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 | $421.19 for the first $50,000.00 plus $3.19 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 | $580.69 for the first $100,000.00 plus $2.78 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 | $1,692.69 for the first $500,000.00 plus $2.37 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up | $2,877.69 for the first $1,000,000.00 plus $1.96 for each additional $1,000.00 or fraction thereof. Shoring of a building or structure, for $1,000.00 or fractional part thereof, based on the estimated cost of the shoring | $41.00 plus $4.12 per $1,000.00 over $10,000.00. Insulation fees for commercial/industrial building | $51.50 Insulation fees for residential buildings | $25.75 Insulation fees for residential additions | $10.30 _____ Other inspections and fees: (1) Inspections outside of normal business hours: $55.00 per hour (minimum charge, two hours). (2) Additional plans required during plan review due to incomplete submittal: $50.00 per submittal. (3) Addendum plans that are submitted after the permit is issued will be assessed the appropriate fee based on the total valuation of the changes made to the plans. (4) In case the building inspector is required to make more than one trip from his/her office for the purpose of inspecting any work due to violation of rules, wrong address or any other irregularities caused by the contractor or any of his/her employees, the following charges will be made and paid before the inspection is approved: a. First additional trip: No charge b. Second additional trip and each additional trip thereafter: $50.00 (5) If the approved plans cannot be located and duplicate plans must be examined and stamped, the following fees shall be charged: Commercial plans: $2.00 per sheet One- and two-family dwellings: $45.00 per set Addition, garage, fence, etc.: $15.00 (6) The building permit fee for the construction of a new single-family dwelling, single-family attached or two-family dwelling located in zones A, B or C as designated in the city urban development policy shall be the minimum permit fee. (7) Penalty fees: When construction begins before the permit has been issued, the applicant shall pay a penalty fee. Said fee shall be quadruple the amount of the regular fee. No quadruple fee penalty set forth in this chapter shall be imposed if the work is of an emergency nature where a delay in performing the work may cause a risk of life or health or will significantly increase the risk of property damage, provided a permit is applied for within 48 hours of the start of the work, in which case no penalty shall be imposed. (8) Building analysis fee: For the review of an existing building and site to determine building, mechanical, fire and zoning requirements of a proposed use: $170.00. (9) Certificate of occupancy fees: a. The fee for the first certificate of occupancy for a new building shall be $125.00. b. The fee for existing buildings or subsequent bays (interior subdivisions) or common areas of new buildings or for a change of occupancy (change of use or purpose) shall be $125.00. c. The fee for each temporary certificate of occupancy for all or part of a new or existing building shall be $125.00 with a maximum time limit of 90 days. d. The fee for a copy of a certificate of occupancy shall be $15.00. e. Pre-occupancy fee: The fee for occupancy without a certificate of occupancy, when allowed, shall be $950.00 in addition to the regular certificate of occupancy fee, with a maximum time limit of 30 days. f. A reinspection fee for a certificate of occupancy inspection, where the project was not ready or required additional work, shall be charged $50.00 per inspector per inspection. g. Certificate of occupancy fees shall be paid at the time of application. No inspection will occur without the fee being paid.
(Ord. No. 33582, § 1(43-91), 6-27-95; Ord. No. 33761, § 1, 12-19-95; Ord. No. 34301, § 1, 9-9-97; Ord. No. 35988, § 10, 7-9-02; Ord. No. 36028, § 1, 8-27-02; Ord. No. 37332, § 1, 4-4-06; Ord. No. 38289, § 6, 11-18-08; Ord. No. 39141, § 1, 10-25-11; Ord. No. 41512, § 13, 7-10-18; Ord. No. 44525, § 1, 12-23-25)
Ask a question about Omaha law
Corpus searches the Omaha sections it holds and shows the ones that match, with their citations. Free, no sign-in.
