For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 37.05 — THE PUBLIC STORMWATER SYSTEM

Madison General Ordinances (Rev. 28, Update 3: codified through ORD-26-00040, published August 3, 2026) · Madison General Ordinances § 37.05

Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/922462e9-14af-40d5-80a8-d8ebb443eb9c

37.05 - THE PUBLIC STORMWATER SYSTEM.

(1) Purpose and Necessity. The Common Council of the City of Madison finds that the management of stormwater and other surface water discharges within and beyond the Yahara River, the Sugar River, Door Creek and other bodies of water within the City is a matter that affects the health, safety, welfare and well-being of the City, its residents and businesses and others in the surrounding area. Failure to effectively manage stormwater affects the sanitary sewer utility operations of the City by, among other things, increasing the likelihood of infiltration and inflow into the sanitary sewer system. Surface water runoff may cause erosion of lands, threaten residences and businesses with water damage, and create environmental damage to the rivers, streams, and other bodies of water within and adjacent to the City. A system for the collection and disposal of stormwater provides benefits to all properties within the City and surrounding areas, including those properties not currently served by the system. Beyond designated initial Capital Expenses for system improvements, the cost of operating and maintaining the City stormwater management system and financing necessary repairs, replacements, improvements and extensions thereof should, to the extent practicable, be allocated in relationship to the services received from the system. In order to protect the health, safety and welfare of the public, the Common Council hereby exercises its authority to establish a stormwater utility and establish the rates for stormwater management services. Nothing in the foregoing shall affect the determination of the Common Council to provide for the payment of designated initial capital expenses for system improvements by other necessary and convenient means. In promulgating the regulations contained in this section, the City is acting pursuant to authority granted by Wis. Stat. chs. 62 and 66 including, but not limited to, Secs. 62.04, 62.11(5), 62.16(2), 62.18, 62.23(6), 66.0809, 66.0811, 66.0813, 66.0821, and 66.0627. (2) Creation and Supervision. The purpose of this section is to state the intention of the City to provide and maintain a public stormwater system capable of conveying stormwater from public lands and rights-of-way and to dispose of such water in a manner that the health, safety and welfare of the public shall be protected. There is hereby established a stormwater utility within the purview of Wis. Stats § 66.0821. The Administrative Authority shall be responsible for the maintenance and management of the public stormwater system under the direction of the Board of Public Works. (3) Authority. The City, acting through the stormwater utility, may acquire, construct, lease, own, operate, maintain, extend, expand, replace, clean, dredge, repair, conduct, manage, and finance such utilities, operations and activities, as are deemed by the City to be proper and reasonably necessary for a system of storm and surface water management. These facilities may include, without limitation due to enumeration, surface and underground drainage facilities, sewers, watercourses, retaining walls, ponds, streets, roads, ditches and such other facilities relating to collection, runoff and retention. This includes facilities that will support a stormwater management system, whether such facilities are owned and operated directly by the City or are provided under statutory or contractual provisions and furnishing of which facilities create or impose a cost or charge upon the City for the services afforded by such facilities. (4) Rates and Charges. (a) It is hereby determined and declared to be necessary and conducive for the protection of the health, safety, and welfare of the public to charge and collect charges or fees upon all lots, lands and premises served or benefited by the stormwater system of the City. (b) There shall be established a charge for stormwater services to all lots and parcels of land within the municipal boundaries of the City. The charge schedule shall be made up of a Customer Charge, an Impervious Area Charge, and a Pervious Area Charge. (c) Measurement of Impervious Area and Pervious Area. The Administrative Authority shall measure the total area, impervious area, and pervious area of each lot or parcel of land within the City using aerial photography, site or building plans submitted by the property owner, actual on-site surveys, or, in the case of single family and duplex residential lots, using information from the data base of the City Assessor and formulas. Individual property owners may submit site and building surveys to the Administrative Authority, which more accurately determine the total area, impervious area and/or pervious area. Property owners may appeal the measurements of the Administrative Authority to the Board of Public Works. (d) Credits and Adjustments to the Measured Impervious and Pervious Areas. Individual property owners may submit, to the Administrative Authority, site and building surveys or documentation of mitigation or treatment measures which more accurately determine or reflect the total area, impervious area and/or pervious area. The Administrative Authority may reduce the measured impervious area and/or pervious area after taking into consideration the volume or peaking of stormwater or surface water discharge that is caused by the area of impervious surfaces, topography, and other surface characteristics, and the extent and reliability of mitigation or treatment measures that demonstrably and materially reduce treatment, conveyance, construction or mitigation costs to the Stormwater Utility. It shall be the burden of the property owner to demonstrate by a preponderance of the evidence that a fee adjustment and/or credit is warranted. Any such adjustments and/or credits shall be made in accordance with the Rate Adjustment and Credit Policy, which policy shall be established by the Administrative Authority and approved by the Board of Public Works. (e) Appeals. The appeal process is as provided in Sec. 37.13 of this ordinance. The pendency of an appeal of a decision or determination of the Administrative Authority shall not excuse payment of any stormwater charge. If a decision or determination of the Administrative Authority is reversed or modified, the Board of Public Works may grant a refund to the aggrieved party, prorated and retroactive to the date on which an application for fee adjustment was filed with the Administrative Authority. (f) Rate Structure. The City Engineer shall, consistent with the standards set forth in Wis. Stat. Sec. 66.0821(4), annually set the Customer Charge, Impervious Area Charge and Pervious Area Charge rates. These rates shall be set annually, and will go into effect upon approval by the Board of Public Works and the Common Council. (g) Collection of Customer Charge, Impervious Area Charge and Pervious Area Charge. The Administrative Authority shall divide the City into sections for billing purposes, which shall coincide with the billing schedule of the Water Utility. The Customer Charge, Impervious Area Charge and Pervious Area Charge shall be payable to the City Treasurer at the same time that the Water Utility bills are payable. All charges established by this Ordinance shall be a lien on the property served pursuant to Wis. Stat. §§ 66.0809, 66.0811, 66.0813 and 66.0821. (h) The bills for stormwater services shall be dated and issued to users. Except as otherwise provided by resolution of the Council, a late payment charge of one percent (1%) of any unpaid balance shall be assessed and added to the bill for such services if the amount of the bill is not paid within twenty (20) days thereafter (the "due date") and an additional late payment charge of one percent (1%) of the unpaid balance of the bill plus any previously assessed late payment charge remaining due at the end of every monthly anniversary of the due date shall be assessed and added to bills then remaining unpaid. (Am. by ORD-20-00060, 6-29-20) (5) Transfer of Assets and Outstanding Debt. (a) The land rights and improvements of the City, or such rights determined to exist, for the following components of the public stormwater system are hereby transferred to the land assets of the Madison Stormwater Utility. 1. Storm sewers; 2. Inlets, catch basins, retention ponds, and related appurtenances; 3. Access structures; 4. Greenways. (b) Effective January 1, 2001, the Stormwater Utility shall assume the responsibility for debt service on all outstanding general obligation debt issued for storm drainage purposes. (6) Additions to the Public Stormwater System. (a) Additions to and reconstruction of the Public Stormwater System shall be financed by the Stormwater Utility except as follows: 1. Inlets, inlet leads, curb and gutter, manholes not located on trunk system, temporary corrugated facilities, and temporary ditching, unless said construction is incidental to the storm sewer installation. 2. The construction of greenways required by Sec. 16.23, MGO. 3. Storm sewer constructed in accordance with Sec. 7.47, MGO. 4. Public drainage systems required by Sec. 16.23(7)(d)5., MGO. 5. Any public drainage system installed to benefit redevelopment, as that term is defined in Sec. 37.04. (b) Design Standards for Privately Financed Stormwater System Additions. 1. Applicability. The standards in this subdivision apply to privately financed Public Stormwater system additions as set forth in subd. (a)1.—5. above. 2. Compliance Required. Compliance with these standards shall be mandatory. In the case of redevelopment and/or infill development exemptions may be provided upon demonstration that, in the opinion of the Administrative Authority, compliance is not reasonably achievable. 3. System Determination. A determination of the type or types of storm drainage system to be used shall be made by the Administrative Authority on the basis of required capacity, economics, and use of abutting lands. 4. Standards. Additions to the Public Stormwater System for new development shall, in general, be designed and constructed to convey stormwater in accordance with the following: a. General storm design shall convey the runoff that would drain from upstream lands during the 10-year storm event. b. Culvert crossings in greenway drainage systems shall be designed to convey runoff created during a 100-year storm event that uniformly impacts the watershed draining to said road crossing, without road overtopping. c. Enclosed Depressions, whether existing or created shall be designed to convey the runoff that can be expected to result from a 100-year storm event or larger depending on the risk of property damage and public safety, as determined by the Administrative Authority. For design purposes, the acceptable flooding area associated with this design event shall not leave the public right of way, public lands as approved by the Administrative Authority, or public easements. This shall be applied and reviewed within the limits of the development. d. Design of the road system shall be such that during pipe capacity exceeding storm events the combination of the stormwater pipe system and road surface flow system shall adequately convey the runoff from the 100-year storm event within the Right of Way or publicly owned outlots/greenways. Provision of public easements shall not be allowed for this purpose. The 500-year event shall be conveyed using a combination of pipes and surface flow such that it may use both public and private property for surface flow but shall not impact private structures. This shall be applied and reviewed within the limits of the development under review. e. Emergency overflows for ponds shall be designed to be utilized only in events exceeding a 100-year storm event. f. Inlet design shall include a clogging factor of 50% occluded for inlets at low points with the ability to pond one half (0.5) foot or more without overtopping or 25% for all other inlets, when determining the number of inlets required as part of the storm sewer system. g. Inlets shall be installed behind the sidewalk on dedicated easements as deemed necessary by the Administrative Authority to accept private drainage prior to it impacting the public sidewalk. h. Development Site Plans shall be reviewed by Engineering staff for compliance with stormwater overflow routes. Where these overflow routes are known and established as part of a stormwater management plan, the building elevations shall be reviewed and approved by the City Engineer prior to issuance of building permits to confirm that the proposed structure elevations are compliant with the design overflow conveyance during the 500-year storm event. Where overflow routes have not been established by a stormwater management plan, Engineering staff shall use reported flood information as a basis for review. Site plans shall include USGS datum elevations. (c) Inspection of Additions to the Public Stormwater System. The Administrative Authority shall inspect the construction of all public sewers and private sewers, including building sewers, from the property line to the public stormwater system and shall inspect the construction of private sewers and best management practices within private property when deemed necessary by the Administrative Authority. (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) (7) Connection to the Public Stormwater System. (a) Permit Required for Connection, Disconnection or Abandonment. 1. General Requirements. No person shall do any work whatsoever for the purpose of connecting, disconnecting or abandoning an existing connection to the public stormwater system or existing building sewers or existing private sewers, or for the purpose of laying building sewers or private sewers, without first obtaining from the Administrative Authority a written permit to connect, disconnect or abandon a connection to the public stormwater system. The street curb and gutter is considered to be part of the stormwater conveyance system. Curb discharges via pipes, tubes, flumes or "curb scupper" devices of any type of discharge, including sump pumps, roof drains or any other discharge, shall require a permit to connect to the stormwater system. All private sewers and all building sewers between the property line and terminating at the public stormwater system shall be either installed by City forces, City contract, contract under the supervision of the Board of Public Works, or by a Contractor approved by the Board of Public Works for sewer construction, or a plumber qualified by the Board of Public Works and inspected by City forces. All work shall comply with the City of Madison Standard Street and Sewer Specifications and General Conditions. (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) 2. Stormwater System Connection Permit. a. Permit Fee. For each original permit to connect to the public stormwater system, the applicant shall pay to the City Treasurer an application fee of one hundred dollars ($100) and conform to the procedures and regulations of this subsection. Should the stormwater system connection permit be for dry weather flow (a foundation drain or sump pump system) an additional surcharge fee shall be charged consistent with the following: i. For peak discharges up to a maximum of 100 gallons per minute, no surcharge fee. ii. For peak discharges over 100 gallons per minute up to 675 gallons per minute, a surcharge fee of five hundred ($500) dollars shall be charged. iii. For peak discharges in excess of 675 gallons per minute, the Administrative Authority shall first determine if the system can accept the proposed discharge rate. Should the discharge be approved, the surcharge fee shall be one thousand ($1,000) dollars. b. The stormwater system connection permit issued under this subdivision shall be on the premises and in the hands of the person completing the connection. c. Prior to allowing connections to the public stormwater system, for the purpose of a non-stormwater discharge (not including residential sump pump discharges from building foundation drains), the applicant shall first obtain a permit from the City Health Department in accordance with Sec. 7.47, MGO. 3. Stormwater System Disconnection or Abandonment Permit. a. Permit Fee. For each original permit to disconnect or abandon a public stormwater system connection, the applicant shall pay to the City Treasurer an application fee of one thousand ($1,000) dollars and conform to the procedures and regulations of this subsection. Upon a successfully inspected disconnection or abandonment of the private connection and closure of the permit application, the City shall refund an amount of not more than nine hundred ($900) dollars to the applicant. b. As connections to the public stormwater system come in numerous types and combinations, the approved method of disconnection or abandonment shall be clearly defined in the permit conditions. (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) c. The stormwater system disconnection or abandonment permit issued under this subdivision shall be on the premises and in the hands of the person completing the disconnection or abandonment. d. All conditions of the permit must be adhered to and the disconnection or abandonment must be successfully inspected by the City Inspector to obtain any refund of the deposit. e. The permit issued under this subdivision shall be valid for 60 days from the date of issuance unless the permit is extended in writing by the City Engineer. Following an additional 60 days after the expiration of the permit, the permit shall be closed and any deposits remaining, less any inspection fees or other permit costs, will be returned. Upon closing of the permit, the owner must apply for a new permit to complete the disconnection or abandonment. (b) Private Site Plan and Treatment System Design, Review, Maintenance and Enforcement. The Administrative Authority shall review all parking facility permit applications and applications for "commercial sites" as defined by Sec. 10.08, MGO, hereinafter termed the "site." Single and two family detached dwellings shall be reviewed by the Director of the Building Inspection Division. 1. All sites, which include ten thousand (10,000) square feet or less of impervious surface, may be permitted to drain over the sidewalk with the provision that the site shall be graded so that the resultant flow shall be distributed over at least ten (10) linear feet of sidewalk. 2. All sites, which include over ten thousand (10,000) square feet of impervious surface, shall be designed to convey stormwater drainage to the public stormwater system by means of a private storm sewer or storm building sewer. 3. As part of all plat or CSM developments, where the area draining to a single discharge point from a swale or other conveyance to a sidewalk or driveway exceeds fifty-five thousand (55,000) square feet the area shall be served with public storm sewer prior to the discharge to the public right-of-way. Serving of this area with storm sewer shall be at the expense of the developer proposing the improvement. 4. When the Administrative Authority deems that the existing storm sewer is unavailable, or that connection to the storm sewer is not in the public interest, the Administrative Authority may permit drainage across the sidewalk on a temporary or permanent basis. 5. When a site being reviewed by the Administrative Authority proposes to continue existing drainage patterns and discharge stormwater runoff onto property neither under the applicants control (via ownership, easement or agreement) nor onto property under the control of the City of Madison, the Administrative Authority shall require the applicant to provide documentation that they have made significant efforts to obtain the right to discharge this stormwater onto this property. If no right can be obtained, the applicant shall be required to mitigate the increased volume of discharge on their property prior to making this discharge. Mitigation shall consist of implementation of a stormwater practice that shall match the existing volumetric discharges from the applicant's property to other lands not under their control in storm events including the 1, 2, 5 and 10-year storm events. If the proposed discharge is to an area that is an enclosed depression, this requirement shall be increased to include the 25 and 100-year storm events. 6. The Administrative Authority shall review and approve the location, direction of flow, depth, size and type of material to be used in the private storm sewer or storm building sewer. No storm sewer lateral shall be less than six (6) inches in diameter. In the event of a new connection to the storm system where the site requires connection to a pipe or structure in the pavement structure (not a curb inlet or structure), or if in the case of limited pavement, that the private connection exceeds 15 feet in length, the applicant shall have the following choices: a. The applicant, at a minimum, may construct a public inlet or structure in the curb line or near the edge of pavement (at a location approved by the Engineer) nearest the development generating the discharge and connect their private pipe to that public inlet or structure. The applicant shall then construct a new public pipe from this inlet to the public storm sewer in the pavement structure. Construction of these public improvements shall require at a minimum a Permit to Excavate in the Right of Way under Sec. 10.05 and potentially a development agreement with the City. b. The applicant may run a private pipe from their property directly to the public storm sewer in the pavement structure. That pipe will then be private and require a privilege in streets pursuant to Sec. 10.31. The connection to the public pipe shall be made in accordance with the requirements of the Standard Specifications for Public Works Construction applicable to such right-of-way work. Construction of these improvements shall require at a minimum a Permit to Excavate in the Right of Way under Sec. 10.05." 7. The property owner shall be responsible for the cost of installation of the private storm sewer or storm building sewer from the property line to the public stormwater system. The cost of installation shall include excavation, pipe laying, backfilling, and street restoration where required under the supervision of the Administrative Authority and in accordance with the City of Madison Street and Sewer Specifications. 8. The maintenance of the private storm sewer, storm building sewer, and/or best management practices shall be the responsibility of the property owner on whose property they exist. Every private storm sewer, storm building sewer, and best management practice shall be properly installed in accordance with the plans approved by City Engineering and shall be maintained in good working condition, free from defects, leaks and obstructions, and in accord with the maintenance agreement recorded against the property, if applicable. a. Where existing City-approved private storm sewer, storm building sewer, and/or best management practices are in a state of disrepair, not constructed in accord with approved plans, or present an obstruction to the drainage system, and the resulting drainage overflows cause damage to the roadway or adjacent public or private lands, or are determined a hazard, the Administrative Authority is authorized to resolve the drainage problem such that the system is functioning in accord with the approved designed. Authorized actions include, but are not limited to: removal of any drainage obstructions (at existing inlets, at existing ditch lines and similar locations); regrading of existing ditch lines; repairing best management practices to bring them into compliance with the approved design; and construction of improvements to the stormwater management systems such that they are constructed in accordance with the approved plans. The Administrative Authority may proceed as follows to complete the work: i. Where, in the opinion of the Administrative Authority, a situation exists that could adversely affect the health and safety of the public and/or cause significant damage to public or private property other than the property in question, the Administrative Authority may proceed in accordance with Sec. 27.05, MGO, and order the owner of the property causing the problem to correct the situation. If the property owner fails to resolve the issue within the time limitations, the Administrative Authority is authorized to enter private property and correct the situation. The City shall special charge the full cost of the completed work in accord with Sec. 4.09(13), MGO. ii. Where, in the opinion of the Administrative Authority, the situation affects only the property on which the problem exists, the Administrative Authority may proceed in accord with Sec. 27.05, MGO, and order the owner of the property causing the problem to correct the situation. iii. Where, in the opinion of the Administrative Authority, a property with a private storm sewer or building storm sewer on one (1) property affects the drainage on other properties but does not threaten the health and safety of the public or threaten to cause significant damage to public or private property, or where the required maintenance is on a best management practice that is part of the approved stormwater management plan, the Administrative Authority may proceed in accord with Sec. 27.05, MGO, and order the owner of the property causing the problem to correct the situation. b. Any property owner required to have a Best Management Practice or a maintenance agreement on the property shall submit to the City Engineer an annual report reviewing the condition of that practice and the maintenance performed during the past calendar year. This report shall be submitted by June 1 and be sealed by a Professional Engineer currently licensed in the State of Wisconsin. Where a recorded maintenance agreement exists, which specifies the annual inspection requirements, that agreement shall be the minimum information required. Where a maintenance agreement does not exist, the City Engineer shall make available inspection forms and maintenance guidelines for the most common types of stormwater management BMP's. These will be considered the minimum inspection and maintenance standards acceptable for the specific sites developed prior to maintenance agreements being required. Inspection forms will also be accepted for those properties with maintenance agreements, provided the minimum inspection and maintenance standards match that proscribed in the agreement. (8) Discharges to the Public Stormwater System. (a) Definitions. In addition to the terms set forth in this Chapter, the definitions set forth in Sec. 7.47(2) shall apply to this subsection. (b) Non-storm Discharges. All non-stormwater discharges to the public stormwater system shall be approved and permitted by the Health Department, as required and authorized under Sec. 7.47. (c) Illicit Discharges. All non-stormwater discharges to the public stormwater system that are either not permitted under Sec. 7.47 or are not required to have a permit (this includes, but is not limed to, foundation drains, sump pumps, and some air conditioning condensation discharges) shall be considered to be illicit and are hereby prohibited. (d) Clean-up or Repair of Wastes Discharged to the Public Stormwater System. The Administrative Authority shall work cooperatively with the Health Department to prevent, repair, and remove pollutants/waste from the public stormwater system. Should a discharge of pollutant/waste to the public stormwater system be caused by any individual, this person is responsible for immediately cleaning up any spilled material to prevent it from becoming a hazard to health or safety, or directly or indirectly causing pollution to the lakes and streams under the jurisdiction of the City of Madison. (e) Notification. Spills or the accidental release of hazardous materials or potentially polluting substances at a site of a quantity or nature that cannot be adequately cleaned up by the responsible person shall be reported immediately to the emergency number for the Police department (911) so that assistance can be provided by the proper agency. (f) Access. Where the Administrative Authority, under the direction of, or in consultation with and the approval of, the Health Department, has determined that a situation exists that could adversely affect the health and safety of the public or that a potential waste/pollutant discharge poses a significant threat of pollution to the waters of the State, and to remedy this situation access to privately owned property is required, the Administrative Authority shall have the right to enter private property for the specific purpose of remedying the potential discharge of waste/pollutants. (g) Financial Liability. The person responsible for the release, escape or discharge of potentially polluting substances/wastes shall be held financially liable for the cost of clean-up or attempted clean-up deemed necessary or desirable and undertaken by the City of Madison, or its designated agents. This clean up shall be done only where the Administrative Authority, under the direction of, or in consultation with and the approval of, the Health Department, has determined that a situation exists that could adversely affect the health and safety of the public or that a potential waste/pollutant discharge poses a significant threat of pollution to the waters of the State. When the Administrative Authority acts consistent with this guidance it shall be determined to be acting in good faith. The costs associated with these remediation efforts shall be recovered as a special charge against the property served pursuant to Sec. 4.09(13), MGO. (9) Vehicular and Pedestrian Crossings of the Public Stormwater System. (a) New Private Driveway Approaches. As stated in Sec. 10.08(5)(f) of the Madison General Ordinances and Wis. Stat. § 88.87(3) all new private driveway approaches (entrances) from unimproved public roadways into private property, shall have drainage facilities such as culverts and roadside ditch grading done in accordance with requirements of the Board of Public Works. Ditching and culverts required by the Board of Public Works shall be installed and properly maintained at the property owner's expense. The Administrative Authority shall determine said requirements which shall include, but are not limited to; size, length and type of culvert, alignment and grade of culvert, type of embankment needed at culvert end, roadside ditching and grading required to provide roadside drainage. The construction shall be done by and at the expense of the property owner and the Administrative Authority will provide engineering and inspection. (b) Existing Private Drainage Systems. The maintenance, repair and replacement of private crossings of the drainage systems, including, but not limited to, pipes, culverts for private driveways, and roadside ditches along unimproved public roadways, are the responsibility of the adjacent private property owner. Where existing private drainage systems present an obstruction to the drainage system, and the resulting drainage overflows cause damage to the roadway or adjacent public or private lands, or create a hazard, the Administrative Authority is authorized to correct any drainage obstruction. Authorized actions include but are not limited to removal of any drainage obstructions in existing ditch lines and regrading of existing ditch lines to allow for positive drainage. The Administrative Authority may proceed as follows to complete the following work: (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) 1. Where, in the opinion of the Administrative Authority, a situation exists that could adversely affect the health and safety of the public or cause significant damage to public or private property, other than the property in question, the Administrative Authority is authorized to resolve the situation and the City will special charge the completed work in accord with Sec. 4.09(13), MGO. 2. Where, in the opinion of the Administrative Authority, the situation affects only the property on which the problem exists, the Administrative Authority may proceed in accord with Sec. 27.05, MGO, and order the owner of the property causing the problem to correct the situation. 3. Where, in the opinion of the Administrative Authority, the situation on one property affects the drainage on other properties but does not threaten the health and safety of the public or threaten to cause significant damage to public or private property, the Administrative Authority may proceed in accord with Sec. 27.05, MGO, and order the owner of the property causing the problem to correct the situation. It is noted here that for this scenario to be utilized the drainage problem must be clearly limited to one property affecting other properties. In the more common case, of drainage problems on multiple properties affecting the drainage for the area, paragraph 4. below will apply. 4. Where, in the opinion of the Administrative Authority, the situation is such that drainage problems are caused by a poorly maintained drainage system throughout the area, and it is only possible to correct the situation through regional improvements made on multiple properties, the Administrative Authority may propose an assessment improvement district to correct the situation or may proceed to improve the drainage via the Rural to Urban street improvement program. (10) Public Harvesting of Foliage or Seeds from Storm Utility Lands. (a) Request to Harvest Plant Materials. A City of Madison resident or volunteer may make a written request to the Administrative Authority for the harvesting of foliage or gathering of wildflower or prairie seeds from lands owned and operated by the City of Madison stormwater utility. Each instance or location must be made as a separate request, reviewed, and approved prior to any harvesting or gathering activities. Harvested materials must be used for non-profit purposes and cannot be resold. The person or persons allowed to harvest materials from City of Madison stormwater utility lands must also complete a City of Madison volunteer waiver. Any damage caused by harvesting activities other than removal of the proscribed plant or seed materials must be repaired to the satisfaction of the Administrative Authority. (11) Greenway Privilege. (a) Privilege. The privilege for certain permissible encroachments within a publicly owned greenway, as allowed for under Sec. 8.15(1)(c), shall be granted only as provided in this Subsection. All existing encroachments which are nonconforming to the provisions of this Subsection are to hereafter comply with the requirements of this Subsection and Sec. 8.15(1). No building permits shall be issued under Sec. 29.05 on any premises from where a greenway encroachment exists until the requirements of this Subsection are met, unless the City Engineer or their designee determines that an emergency condition exists which requires immediate remedy, provided an application for Greenway Privilege is submitted with the application for said building permit. For the purposes of this Subsection, a greenway has the definition provided under Sec. 16.23(2), but also includes any lands managed by the Stormwater Utility. (b) Application. 1. Procedure. Applications for a Greenway Privilege shall be made to the Economic Development Division of the Planning and Community and Economic Development Department. A nonrefundable application and initial processing fee of five hundred dollars ($500) shall accompany said application. There shall be no proration of the application and initial processing fee. The City Engineer, or their designee, shall make the determination of whether to approve an application for a Greenway Privilege under this Subsection. A legible drawing or survey completed by a Professional Surveyor at a convenient scale necessary to clearly depict and label all items on an 8½ × 14 size paper or in an equivalent digital file, showing the greenway privilege, improvements and area in relation to the owner's property shall also accompany said application. The survey shall be referenced to the published horizontal datum as required by the City Engineer. The drawing or survey shall include sufficient data to permit the applicant's Surveyor to include a complete legal description and determine and label the square footage of the greenway area occupied by the greenway privilege. Upon the approval of an encroachment by the City Engineer, a digital CADD file shall be provided in the format required by the City Engineer. The City Engineer or their designee shall not recommend that the greenway privilege be granted unless the applicant shows that the requirements of this Subsection and Sec. 8.15 will be satisfied, and that applicable ordinances, resolutions and Board of Public Works policies will be complied with. If the Engineer recommends approval of an application for the greenway privilege, the Engineer shall inform the applicant in writing of the recommendation and the conditions of approval. Following concurrence of the applicant with the conditions of approval, the Director of the Economic Development Division or their designee (Director), in cooperation with the City Attorney, shall prepare an agreement, setting forth the requirements and conditions under which the greenway privilege is permitted. Following execution of all the documents by the applicant, the required documents are to be executed by the City Engineer. The Director shall monitor the payment of the annual fees, which may be collected as a special charge if not paid. Following receipt of the insurance certificate and the first year's fee, the agreement may be recorded with the Dane County Register of Deeds. A copy of the recorded agreement shall be furnished to the Applicant. The Risk Manager shall monitor the insurance requirements. 2. Appeal. In the event the City Engineer disapproves an application for a greenway privilege, the City Engineer shall inform the applicant, in writing, of the reasons for disapproval. The applicant may appeal the City Engineer's decision to the Board of Public Works within thirty (30) days after mailing of the City Engineer's notice to the address of the applicant as shown on the application. Such appeal must be in writing, and must inform the Board of the reasons why the applicant believes the City Engineer's decision to be in error. Failure to appeal a denial shall result in automatic approval of the denial without further action by the City Engineer or Board of Public Works. Within thirty (30) days after receipt of the appeal, the Board of Public Works shall hold a hearing at which the applicant and the City Engineer may present and question witnesses and present oral and written argument. Within twenty (20) days after the hearing, the Board shall issue a written decision which shall affirm, reverse or modify the determination of the City Engineer. Appeal of the Board of Public Works' decision shall be by Certiorari to Circuit Court and shall be commenced within thirty (30) days of the date of the decision sought to be reviewed or be waived. (c) Conditions. 1. Conditions of Approval. A greenway privilege granted under this Subsection is subject to compliance with Sec. 8.15(1), as that ordinance may be amended from time-to-time, including any additional conditions imposed by the City Engineer. Any greenway privilege granted by the City Engineer shall be to the owner, agent or person obligated pursuant to a regulatory order of the property adjacent to the greenway to be occupied and shall be on condition that the applicant or the applicant's heirs and assigns shall become primarily liable for damages to person or property by reason of the granting of the greenway privilege. 2. Insurance. The applicant shall be required to furnish a Certificate of Insurance, providing evidence of general liability insurance with the City of Madison, its officers, officials, agents and employees named as additional insureds. The insurance shall include contractual liability coverage and minimum limits of one million dollars ($1,000,000) per occurrence. The City of Madison Risk Manager reserves the right to require higher limits and other coverage terms and conditions at their discretion. Applicant shall keep required insurance in full force and effect throughout the term of the greenway privilege. This insurance condition may be waived for other governmental units and in those instances where the City of Madison Risk Manager, in consultation with the City Attorney's office, determines that this requirement can be waived. 3. Public Priority. Greenway privileges shall not interfere with the use, operation, maintenance or future planning, development or construction of the adjacent greenway or appurtenances, or present a risk to the health, safety and welfare of the public. Non-compliance with this requirement is cause for immediate termination of the greenway privilege. (d) Removal of Encroachment. The applicant shall remove said encroachment or obstruction upon thirty (30) days written notice by the City Engineer, or sooner if removal is necessary to protect the health, safety and welfare of the public. Additionally, the applicant or the applicant's heirs or assigns shall be entitled to no damages for removal of the greenway privilege, and if the applicant shall not remove the same upon due notice, it shall be removed at the applicant's expense and levied as a special charge for current services rendered against the applicant's property as provided by law. In the event of acquisition of all or a portion of the applicant's property for a planned public improvement, no compensation will be paid to the applicant for the improvements constructed within the area on which the greenway privilege exists, for cost incurred in realigning personal property located on the area on which the privilege exists, or for loss of value or damage to the remaining improvements of the applicant caused by reasons of the acquisition or taking as provided under Wis. Stat. ch. 32. In accepting the privilege, the applicant waives any and all right to contest in any manner the validity of this ordinance or Wis. Stat. § 66.0425, or the amount of compensation charged by the City of Madison. The applicant may be required to comply with additional conditions as the City Engineer may impose, including execution of a written agreement incorporating all conditions upon which the greenway privilege is to be granted. Such agreement shall be binding upon the applicant, the applicant's heirs and assigns and may be drafted in recordable form and recorded in the Office of the Dane County Register of Deeds, and the terms and conditions contained in the agreement or resolution shall remain in full force and effect as long as the greenway privilege exists. The privilege may be terminated by the applicant at any time by providing the City Engineer written notice of its desire to terminate this privilege. Following removal of the greenway privilege and restoration of the public area on which the greenway privilege existed to the satisfaction of the City Engineer, the Engineer shall cause to be recorded in the Dane County Register of Deeds office a suitable document terminating the privilege, if necessary. A copy of the document shall be furnished to the applicant and the City Clerk. (e) Fee Schedule. 1. An annual minimum fee of five hundred dollars ($500) or an amount established hereinafter, shall be charged for the privilege of encroaching into the greenway. The annual fee may be levied as a special charge for current services rendered against the applicant's property as provided by law. The agreement may provide for alternative means of payment of annual fees in excess of ten thousand dollars ($10,000). An annual fee for less than twelve (12) months shall be prorated according to the number of months or fraction thereof for which the greenway privilege is issued. There shall be no proration upon termination of any privilege in streets. 2. The annual rental fees for privileges in streets under Sec. 10.31(3)(d) shall apply to a greenway privilege. (f) Although subject to the provisions of this subsection, there shall be no application fee or annual fee (if encroachment is approved) for improvements of public benefit as provided for under Sec. 8.15(1)(c)2.i.

(Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) (Cr. by ORD-23-00106, 11-28-23) (Cr. by ORD-20-00051, 6-10-20)

Ask a question about Madison law

Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.