Sec. 8-4-3. - Variance procedures.
In passing upon such applications, the building board of adjustment and appeals shall consider all technical evaluations, all relevant factors, standards specified in other sections of this chapter, and:
(1) The danger that materials may be swept onto other lands to the injury of others;
(2) The danger of life and property due to flooding or erosion damage;
(3) The evaluation must be based on the characteristics unique to that property and not be shared by adjacent parcels. The characteristics must pertain to the land itself, not to the structure, its inhabitants, or its owners;
(4) Variances shall not be granted for multiple lots, phases of subdivisions, or entire subdivisions;
(5) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner;
(6) The importance of the services provided by the proposed facility to the community;
(7) The necessity to the facility of a waterfront location, in the case of a functionally dependent facility;
(8) The availability of alternative locations for the proposed use which are not subject to flooding or erosion damage;
(9) The compatibility of the proposed use with existing and anticipated development;
(10) The relationship of the proposed use to the comprehensive plan and floodplain management program for that area;
(11) The safety of access to the property in times of flood for ordinary and emergency vehicles;
(12) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; and
(13) The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and water systems, and streets and bridges.
(14) Upon consideration of factors listed above, and the purpose of this chapter, the building board of adjustments and appeals may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter.
(15) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
(Ord. No. 2043, § 2, 5-23-06; Ord. No. 2351, § 1, 12-21-17)