For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 93.0218 — FEES FOR SERVICES AND SWITCHBOARD SECTIONS

Los Angeles Municipal Code (2026 Rev. 9, current through legislation effective June 30, 2026) · Los Angeles Municipal Code § 93.0218

Corpus is an independent public-information project, not the official City of Los Angeles website. Stable reference: corpuslaw.us/code/936d43af-4422-44c5-87c7-6d778d0c3c94

SEC. 93.0218. FEES FOR SERVICES AND SWITCHBOARD SECTIONS.

(a) (Amended by Ord. No. 171,185, Eff. 7/22/96.) The fees for the installation, reinstallation, replacement or alteration of each service, each panel board and each switchboard section shall be as specified below. Fees shall also be collected for panel boards which are temporarily installed for trade shows or carnivals and shall be 50% of the fees specified in this subsection. FEES FOR SERVICES, SWITCHBOARD SECTIONS, PANEL BOARDS AND SOLAR VOLTAIC SYSTEMS (Amended by Ord. No. 180,868, Eff. 10/22/09.) Ampacity and Voltage Ratings of Service Entrance Conductors, Service Switches or Circuit Breakers, Panel Boards or Switchboard Sections | Services | Panel board and Switchboard Sections Ampacity and Voltage Ratings of Service Entrance Conductors, Service Switches or Circuit Breakers, Panel Boards or Switchboard Sections | Services | Panel board and Switchboard Sections 200-ampere or less rating | $16.00 | $ 16.00 201 to and including 600 ampere | $34.00 | $38.00 601 to and including 1200 ampere | $62.00 | $48.00 Over 1200 ampere | $76.00 | $90.00 Over 600-volt rating | $132.00 | $138.00 Solar Voltaic System | | Combiner Box | $6.00 each | Solar Voltaic Module DC or AC | $6.00 each | Per Roll of Solar Voltaic Roofing Material | 1st 100 sq. ft. $25.00 $0.25 sq. ft. thereafter | Solar Voltaic Roofing Tiles | 1st 100 sq. ft. $25.00 $0.25sq. ft. thereafter | Inverters K.W., or K.V.A. Rating of Equipment | Fees | Not exceeding 3KW or K.V.A.* | $8.00 | Over 3 and not over 5 | $18.00 | Over 5 and not over 20 | $27.00 | Over 20 and not over 50 | $39.00 | Over 50 and not over 100 | $71.50 | Over 100 | $111.00 | (b) For the purpose of this section, a switchboard section means any portion of complete switchboard, distribution board, or motor control center which is prevented by the structural framework from being, separated into smaller units. (c) The fees for services shall be determined from the ampacity of the set of service entrance conductors or the total ampere rating of the service equipment. (d) No fee need be paid for a switchboard section which incorporates service equipment for which service fees were paid.

Ask a question about Los Angeles law

Corpus searches the Los Angeles sections it holds and shows the ones that match, with their citations. Free, no sign-in.