§ 49-345 — Waste, vent and rainwater system testing
Omaha Municipal Code (Supp. No. 100, Update 2: codified through Ordinance No. 44760, enacted August 4, 2026) · Omaha Municipal Code § 49-345
Corpus is an independent public-information project, not the official City of Omaha website. Stable reference: corpuslaw.us/code/9475d505-36f6-4b96-b40a-0585bc3ff46d
Sec. 49-345. - Waste, vent and rainwater system testing.
Upon completion of the rough-in piping installation, drainage, venting and rainwater systems shall be tested by either water test or air test methods to prove water or air impermeability. Exception: Exterior rainwater leaders and perforated or open joint drain tile will not require testing. (a) Water test shall be applied to all interior soil, waste, vent and rainwater systems, either in their entirety or to appropriate sections, as follows: (1) All dead ends shall be relieved of air during the process of filling, whether testing entire systems or in sections. (2) If applied to the entire system, only the highest opening above the roof or other highest point shall be opened and the system filled with water to the highest overflow point. Confirm all except the highest openings are tightly shut. (3) If applied in sections, the following testing provisions shall be followed: (i) Each opening shall be tightly closed except the highest opening in the section. (ii) Each section shall be filled with water. (iii) Each section shall be tested with a minimum ten-foot head of water. The upper ten feet of the previously tested section shall be included in any successive section test ensuring the entire system will be tested with a minimum ten feet head of water. (4) All underground piping must be installed and tested to a point not less than ten feet above the finished floor of the basement or ground floor. (5) Once filled, water shall remain in the tested system or section for a minimum of 15 minutes before inspection. The system shall be tight at all points. (6) Water pressure shall remain constant as determined by the water level remaining constant for no less than 15 minutes without further addition. (7) When the surrounding air temperatures is below 32 degrees Fahrenheit, the master plumber may release the water from the system after one hour from the requested time of inspection if such inspection has not been completed. (b) Air test shall be conducted by: (1) Attachment of an air compressor or test apparatus to any suitable opening confirming all other system inlets and outlets are tightly closed. (2) Air shall be forced into the system until reaching a uniform pressure of five psig throughout the entire system. (3) Air pressure shall remain constant for a minimum of 15 minutes without any further addition of air. (4) Air testing of plastic pipe and fittings shall be prohibited.
(Ord. No. 40524, § 1, 10-20-15; Ord. No. 42654, § 5, 8-13-21)
Ask a question about Omaha law
Corpus searches the Omaha sections it holds and shows the ones that match, with their citations. Free, no sign-in.