§ 48-573 — Application required

Wilmington City Code, Delaware (Supp. No. 72: codified through Ordinance No. 25-073, enacted December 11, 2025) · Wilmington City Code § 48-573

Corpus is an independent public-information project, not the official City of Wilmington website. Stable reference: corpuslaw.us/code/94cea350-4840-4f0d-9ad7-85c1c111a44f

Sec. 48-573. - Application required.

Application for a permit shall be made by the owner of the property or his/her authorized agent, herein referred to as the applicant, prior to the actual start of construction. The application shall be on a form furnished for that purpose. (1) Application contents. At a minimum, applications shall include: a. Site plans drawn to scale showing the nature, location, dimensions, existing and proposed topography of the area in question, the limits of any portion of the site that was previously filled, and the location of existing and proposed structures, excavation, filling, storage of materials, drainage facilities, and other proposed activities. b. Elevation of the existing natural ground where structures are proposed, referenced to the datum on the flood insurance rate map, and an elevation certificate that shows the ground elevation and proposed building elevations (identified in section C of the elevation certificate as "construction drawings"). c. Delineation of special flood hazard areas, floodway boundaries, flood zones, and base flood elevations. Where surveyed natural ground elevations are lower than the base flood elevations, base flood elevations shall be used to delineate the boundary of special flood hazard areas. If proposed, changes in the delineation of special flood hazard areas shall be submitted to and approved by FEMA in accordance with subsection (2). Where special flood hazard areas are not delineated or base flood elevations are not shown on the flood hazard maps, the floodplain administrator has the authority to require the applicant to use information provided by the floodplain administrator, information that is available from other sources, or to determine such information using accepted engineering practices. d. For subdivision proposals and development proposals containing at least 50 lots or at least five acres, whichever is the lesser, and where base flood elevations are not shown on flood insurance rate maps, hydrologic and hydraulic engineering analyses and studies as required by section 48-579(d). e. Elevation of the lowest floor, including basement, or elevation of the bottom of the lowest horizontal structural member, as applicable to the flood zone, of all proposed structures, referenced to the datum on the flood insurance rate maps. f. Such other material and information as may be requested by the floodplain administrator necessary to determine conformance with these regulations. g. For work on an existing structure, including any improvement, addition, repairs, alterations, rehabilitation, or reconstruction, sufficient information to determine if the work constitutes substantial improvement, including: 1. Documentation of the market value of the structure before the improvement is started or before the damage occurred. 2. Documentation of the actual cash value of all proposed improvement work, or the actual cash value of all work necessary to repair and restore damage to the before damaged condition, regardless of the amount of work that will be performed. h. Certifications and/or technical analyses prepared or conducted by an appropriate design professional licensed in the state, as appropriate to the type of development activity proposed and required by these regulations: 1. Floodproofing certificate for dry floodproofed non-residential structures, as required in section 48-588. 2. Certification that flood openings that do not meet the minimum requirements of section 48-587(b)(3)b. are designed to automatically equalize hydrostatic flood forces. 3. Certification that the structural design, specifications and plans, and the methods of construction to be used, are in accordance with accepted standards of practice and meet the requirements of section 48-593(e). 4. Technical analyses to document that the flood carrying capacity of any watercourse alteration or relocation will not be diminished and documentation of maintenance assurances as required in section 48-590(c). 5. Hydrologic and hydraulic engineering analyses demonstrating that the cumulative effect of proposed development, when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood by more than one foot in special flood hazard areas where the Federal Emergency Management Agency has provided base flood elevations but has not delineated a floodway, as required by section 48-590(b). 6. Hydrologic and hydraulic engineering analyses of any development proposed to be located in an identified floodway, as required by section 48-590(a). 7. Hydrologic and hydraulic engineering analyses to develop base flood elevations for subdivisions and large-lot developments, as required by section 48-579(d) or otherwise required by the floodplain administrator. (2) Right to submit new technical data. The applicant has the right to seek a letter of map change and to submit new technical data to FEMA regarding base maps, topography, special flood hazard area boundaries, floodway boundaries, and base flood elevations. Such submissions shall be prepared in a format acceptable by FEMA and the floodplain administrator shall be notified of such submittal. Submittal requirements and processing fees shall be the responsibility of the applicant. (3) Requirement to submit new technical data. The floodplain administrator shall notify FEMA of physical changes affecting flood hazard areas and flooding conditions by submitting technical or scientific data as soon as practicable, but not later than six months after the date such information becomes available. The floodplain administrator has the authority to require applicants to submit technical data to FEMA for letters of map change.

(Ord. No. 14-053(sub 1), § 2, 12-18-14)