§ 12.5.1111 — INDUSTRIAL USER CONTROL MECHANISMS (INDIVIDUAL OR GENERAL)
City Code of Colorado Springs, Colorado (2026 S-22: current through Ord. 26-47, passed August 25, 2026) · Colorado Springs City Code § 12.5.1111
Corpus is an independent public-information project, not the official City of Colorado Springs website. Stable reference: corpuslaw.us/code/94dc63f8-1ae0-4b94-ad52-0b2250636773
12.5.1111: INDUSTRIAL USER CONTROL MECHANISMS (INDIVIDUAL OR GENERAL):
A. The Chief Executive Officer may issue a control mechanism to any industrial user (who is not otherwise a significant industrial user) who is discharging or proposes to discharge wastewater containing substances regulated under part 7 of this article, upon finding that all of the following conditions are met: 1. The actual or proposed discharge of the applicant is in compliance with the prohibitions and limitations of part 7 of this article; 2. The actual or proposed operation and discharge of the applicant would permit the normal and efficient operation of the wastewater treatment system; and 3. The actual or proposed discharge of the applicant would not result in a violation by the City of the terms and conditions of its CDPS permit or pass-through of any toxic materials to the environment. B. If the Chief Executive Officer finds that the condition set out in subsection A1 of this section is not met, the Chief Executive Officer may issue a control mechanism to the applicant if the conditions set out in subsections A2 and A3 of this section are met and if the applicant submits, and the Chief Executive Officer approves, an expeditious compliance schedule setting out the measures to be taken by the applicant and the dates that the measures will be implemented to ensure compliance with the provisions of this article. C. The control mechanism may contain conditions for discharging as requirements for treatment, limitations and prohibitions, BMPs, monitoring, sampling and analysis requirements, reporting and recordkeeping requirements, conditions for accessible inspections and other conditions to ensure compliance with this article. D. The Chief Executive Officer may issue industrial users (who are not otherwise significant industrial users) general control mechanisms when all of the industrial users covered by the general control mechanism involve the same or substantially similar types of operations, discharge the same types of wastes, require the same effluent limitations or BMPs, require the same or similar monitoring (if any) and in the opinion of the Chief Executive Officer are more appropriately controlled under a general control mechanism. E. General control mechanisms may contain conditions for discharging as requirements for treatment, limitations and prohibitions, BMPs, monitoring, sampling and analysis requirements, reporting and recordkeeping requirements, conditions for accessible inspections, requirements to control slug discharges if determined by the Chief Executive Officer to be necessary, and other conditions to ensure compliance with this article and Federal pretreatment standards. F. Adoption of general control mechanisms shall be in accord with subsection 12.1.110B of this chapter. G. The duration of general control mechanisms is as provided in the general control mechanism. General control mechanisms issued for a term of less than five (5) years may be administratively extended at the discretion of the Chief Executive Officer; however, the entire term of the general control mechanism may not exceed five (5) years. (Ord. 99-163; Ord. 01-42; Ord. 06-195; Ord. 10-82; Ord. 18-42)
Ask a question about Colorado Springs law
Corpus searches the Colorado Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.
