Wilmington City Code § 6-116 Design and construction regulations.
Sec. 6-116. - Design and construction regulations.
(a) System construction schedule. Every franchise agreement shall specify the construction schedule that will apply to any required construction, upgrade, or rebuild of the cable system.
(b) Construction procedures. A franchisee shall construct, operate and maintain its cable system subject to the supervision of the city or its designees, and in strict compliance with all applicable laws, ordinances, rules and regulations.
(1) The system and all its parts shall be subject to inspection by the city.
(2) No construction, reconstruction or relocation of the system or any part thereof within the public rights-of-way shall be commenced until all applicable written permits have been obtained from the proper city officials. In any permit so issued, such officials may impose such conditions and regulations as a condition of the granting of the permit as are necessary for the purpose of protecting any structures in the public rights-of-way and for the proper restoration of such public rights-of-way and structures, and for the protection of the public and the continuity of pedestrian and vehicular traffic.
(3)—(6) Reserved.
(7) A franchisee shall participate in any "Miss Utility" and public works program active in its franchise area with regard to giving and receiving notice of the location of facilities and excavations.
(c) Construction standards.
(1) The construction, operation, maintenance, and repair of a cable system shall be in accordance with all federal, state and local laws and regulations, and accepted industry practices. In the event of a conflict among codes and standards, the most stringent code or standard shall apply (except insofar as those standard, if followed, would result in a system that could not meet requirements of federal, state or local law, or is expressly preempted by other such standards). The city may adopt additional standards as required to ensure that work continues to be performed in an orderly and workmanlike manner.
(2) All wires, cable lines, and other transmission lines, equipment, and structures shall be installed and located to cause minimum interference with the rights and convenience of the city and its residents and to minimize hindrance or obstruction to pedestrian or vehicular traffic.
(3) All installation of electronic equipment shall be of a permanent nature, using durable components.
(4) Without limiting the foregoing, antennae and their supporting structures (towers) shall be designed in accordance with the Uniform Building Code as amended, and shall be painted, lighted, erected, and maintained in accordance with all applicable rules and regulations of the Federal Aviation Administration and all other applicable state or local laws, codes, and regulations, all as hereafter may be amended or adopted.
(5) Without limiting the foregoing, all work on a franchisee's system shall be performed in accordance with good engineering practices, by experienced and properly trained maintenance and construction personnel.
(6) A franchisee shall at all times employ at least ordinary care and shall install and maintain in use commonly accepted methods and devices preventing failures and accidents that are likely to cause damage, injury, or nuisance to the public.
(7) In case of any disturbance of pavement, sidewalk, driveway or other surfacing, a franchisee shall, in a manner approved by the city, replace and restore all paving, sidewalk, driveway, landscaping, or surface of any street or alley disturbed, in substantially the same condition and in a good workmanlike, timely manner in accordance with any general standards for such work set by the city. Such restoration shall be undertaken within no more than five calendar days after the damage is incurred, and shall be completed as soon as reasonably possible thereafter.
(8) In the event of a failure by a franchisee to complete any work required for the protection or restoration of the public rights-of-way, or any other work required by city law or ordinance, within the time specified by and to the reasonable satisfaction of the city, the city, following notice and an opportunity to cure, may cause such work to be done, and the franchisee shall reimburse the city the cost thereof within 30 days after receipt of an itemized list of such costs; or the city may recover such costs through the security fund provided by franchisee.
(9) A franchisee shall not place facilities, equipment, or fixtures where they will interfere with any gas, electric, telephone, water, sewer, or other utility facilities, or obstruct or hinder in any manner the various utilities serving the residents of the city of their use of any public rights-of-way.
(10) Any and all public rights-of-way, public property, or private property that is disturbed or damaged during the construction, repair, replacement, relocation, operation, maintenance, or reconstruction of a system shall be promptly repaired by the franchisee.
(11) A franchisee shall, by a time specified by the city, protect, support, temporarily disconnect, relocate, or remove any of its property when required by the city by reason of traffic conditions; public safety; public right-of-way construction; public right-of-way maintenance or repair (including resurfacing or widening); change of public right-of-way grade; construction, installation or repair of sewers, drains, water pipes, power lines, signal lines, tracks, or any other type of government-owned communications system, public work or improvement or any government-owned utility; public-right-of-way vacation; or for any other purpose where the convenience of the city would be served thereby; provided, however, that the city may by written consent permit the franchisee to abandon any property in place.
(12) If any removal, relaying, or relocation is required to accommodate the construction, operation, or repair of the facilities of another person that is authorized to use the public rights-of-way, the city shall give the franchisee at least 30 days' advance written notice, and the franchisee shall take action to effect the necessary changes requested by the responsible entity by the time specified in the city's notice. The city may resolve disputes as to responsibility for costs associated with the removal, relaying, or relocation of facilities as among entities authorized to install facilities in the public rights-of-way if the parties are unable to do so themselves, and if the matter is not governed by a valid contract between the parties or a state or federal law or regulation.
(13) In the event of an emergency, or where a cable system creates or is contributing to an imminent danger to health, safety, or property, the city may remove, relay, or relocate any or all parts of that cable system without prior notice.
(14) A franchisee shall, on the request of the city or any person holding a permit issued by the city, temporarily raise or lower its wires to permit the moving of buildings. The expense of such temporary removal or raising or lowering of wires shall be paid by the person requesting same, and the franchisee shall have the authority to require such payment in advance, except in the case where the request is made by the city, in which case no such payment shall be required. A franchisee shall be given not less than 48 hours' advance notice to arrange for such temporary wire changes.
(15) A franchisee shall have the authority to trim trees that overhang a public right-of-way of the city so as to prevent the branches of such trees from coming in contact with the facilities, wires and cables of the franchisee. At the option of the city, such trimming may be done by it or under the supervision and direction of the city.
(16) A franchisee shall use, with the owner's permission, existing poles, conduits and other facilities whenever feasible. A franchisee may not erect poles, conduits, or other facilities in public rights-of-way without the express permission of the city.
(17) System cable and facilities may be constructed overhead where poles already exist and electric or telephone lines or both are already overhead, but where no overhead poles exist all cables and facilities, excluding system passive or active electronics that may be housed in low-profile, above-ground pedestals, shall be constructed underground. Whenever and wherever electric lines and telephone lines are moved from overhead to underground placement, all cable system cables shall be similarly moved and the cost of movement of its cable shall be solely the obligation of the franchisee.
(18) The city shall have the right to install and maintain free of charge upon any poles owned by a franchisee any wire and pole fixtures that do not unreasonably interfere with the cable system operations of the franchisee.
(19) Prior to erection of any towers, poles, or conduits or the construction, upgrade, or rebuild of a cable system, a franchisee shall first submit to the city for approval a concise description of the cable system facilities proposed to be erected or installed, including engineering drawings, if required by the city, together with a map and plans indicating the proposed location of all such facilities. No such erection or construction shall be commenced by any person until approval therefore has been received from the city.
(20) Any contractor or subcontractor used for work or construction, installation, operation, maintenance, or repair of system equipment must be properly licensed under laws of the state and all applicable local ordinances, where applicable, and each contractor or subcontractor shall have the same obligations with respect to its work as the franchisee would have if the work were performed by the franchisee. The franchisee must ensure that contractors, subcontractors and all employees who will perform work for it are trained and experienced. The franchisee shall be responsible for ensuring that the work of contractors and subcontractors is performed consistent with the franchise and applicable law, shall be fully responsible for all acts or omissions of contractors or subcontractors, shall be responsible for promptly correcting acts or omissions by any contractor or subcontractor, and shall implement a quality control program to ensure that the work is properly performed.
(21) The city does not guarantee the accuracy of any maps showing the horizontal or vertical location of existing substructures. In public rights-of-way, where necessary, the location shall be verified by excavation.
(22) To the extent practicable, above-ground equipment placed on private property shall be placed at the location requested by the property owner. A franchisee shall provide affected homeowners with at least ten days' advance written notice of its plans to install such equipment, and shall make reasonable efforts to confer with such homeowners before any work is done. Whenever above-ground equipment is placed on private property, the franchisee shall either provide landscaping camouflage acceptable to the property owner, at the franchisee's expense, or shall provide a cash allowance to the property owner for such landscaping in the amount of $200.00 in [current year] dollars, adjusted annually for inflation based on the Consumer Price Index. The franchisee may provide such allowance either in the form of a credit against subscriber billings, if the property owner is a subscriber, or in the form of a cash payment.
(d) Publicizing proposed construction work. A franchisee shall notify the public prior to commencing any proposed construction that will significantly disturb or disrupt public property or have the potential to present a danger or affect the safety of the public generally. A franchisee shall publicize proposed construction work at least one week prior to commencement of that work by causing written notice of such construction work to be delivered to the city and by notifying those persons most likely to be affected by the work in at least two of the following ways: by telephone, in person, by mail, by distribution of flyers to residences, or by publication in local newspapers. If the franchisee must enter premises, it must schedule an appointment at the convenience of the owner or resident.
(e) Obligations of developers.
(1) In cases of new construction, residential or otherwise, the developer or property owner shall provide the same preparatory and construction work, under the same terms, to a franchisee as it provides to other telephone and power utility service providers.
(2) Such developer or property owner shall cause each cable franchisee to be notified of the opportunity to commence such preparatory and construction work at the same time the developer or property owner provides such notice to other telephone and power utility providers. Such notice shall satisfy the requirements of this paragraph if sent to the cable franchisee's local general manager or system engineer.
(3) Upon notice to the franchisee, the franchisee shall timely furnish to the developer or property owner any plans and specifications necessary for the successful accomplishment of this preparatory and construction work to the extent such work is to be performed by the developer or property owner.
(4) The costs of trenching, backfill, and all materials for such work shall be borne by the developer or property owner.
(5) The city shall require the franchisee's inspection and approval of the cable system installation prior to the city's final inspection of the improvements.
(6) Upon such approval, the developer or property owner shall dedicate the cable system installation to the franchisee for which it was performed, which shall assume ownership thereof.
(Ord. No. 07-001(sub 1), § 1(Exh. A), 4-19-07)