§ 15.01.286 — Swimming pool, spa, or hot tub permit expiration
Henderson Municipal Code (Supp. No. 59: codified through Ordinance No. 4163, adopted June 16, 2026) · Henderson Municipal Code § 15.01.286
Corpus is an independent public-information project, not the official City of Henderson website. Stable reference: corpuslaw.us/code/9573d006-6d4f-4ce1-8bdb-283ac30c9164
15.01.286 - Swimming pool, spa, or hot tub permit expiration.
A permit issued prior to September 19, 2022, for construction of a swimming pool, spa, and/or hot tub having an aggregate water surface area greater than 600 square feet, for any residential property with an attached or a detached single-family residential dwelling unit, shall comply with this subsection. A. Expiration. Every permit issued by the building official shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 calendar days from the date of issuance of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 calendar days, or if the building or work authorized by such permit exceeds three calendar years from the date of issuance of the original permit. B. Inspections required. Work shall be presumed to have commenced if a required inspection approval of work authorized by the permit has been obtained from the building official within 180 calendar days of the date of permit issuance. Work shall be presumed to be suspended or abandoned if a required inspection approval of work authorized by the permit has not been obtained by the building official within each 180 calendar days upon initial commencement of work authorized by such permit. Before such work can be recommenced, the permit shall be renewed as specified in subsection 15.01.286(C). C. Permit renewal. Work not commenced or work commenced. For permits for which work has not been commenced in the first 180 days from the date of permit issuance as defined herein or for permits where work has commenced as defined herein and was subsequently suspended or abandoned as defined herein, the permit may be renewed provided that: 1. The original permit has not been extended as outlined in section 15.01.290. 2. No changes have been made or will be made in the original plans and specification for such work. 3. The expiration has not exceeded three years from the original date of permit issuance. 4. A fee equal to one-fourth the amount required for a new permit is paid. 5. The renewed permit shall expire three calendar years from date of issuance of original permit. 6. The renewed permit shall expire if work is not commenced within 180 calendar days from renewal date.
(Ord. No. 3906, § 4, 9-13-2022)
Ask a question about Henderson law
Corpus searches the Henderson sections it holds and shows the ones that match, with their citations. Free, no sign-in.
