For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.259 — Soil Erosion and Sedimentation Control Design

Code of the City of Grand Rapids, Michigan (Supp. No. 70: codified through Ordinance No. 2026-08, enacted April 14, 2026) · Grand Rapids City Code § 2.259

Corpus is an independent public-information project, not the official City of Grand Rapids website. Stable reference: corpuslaw.us/code/95f59cbb-34b3-441c-b35d-5926df0a64bf

Sec. 2.259. - Soil Erosion and Sedimentation Control Design.

(1) Soil Erosion and Sedimentation Control Plan Requirements. The plan shall include, but not be limited to, all of the following: (a) A map or maps at a scale of not more than one hundred (100) feet to the inch or as otherwise determined by the City. A map shall include a legal description and site location sketch that includes the proximity of any proposed earth change to lakes or streams, or both; predominant land features; and contour intervals or slope description. (b) A soils survey or a written description of the soil types of the exposed land area contemplated for the earth change. (c) Details for proposed earth changes, including all of the following: 1. A description and the location of the physical limits of each proposed earth change. 2. A description and the location of all existing and proposed. 3. The timing and sequence of each proposed earth change. 4. The location and description for installing and removing all proposed temporary soil erosion and sediment control measures. 5. A description and the location of all proposed permanent soil erosion and sediment control measures. 6. A program proposal for the continued maintenance of all permanent soil erosion and sediment control measures that remain after project completion, including the designation of the person responsible for the maintenance. Maintenance responsibilities shall become a part of any sales or exchange agreement for the land on which the permanent soil erosion control measures are located. (2) Basic Design Principles and Construction Methods. (a) The design of soil erosion and sedimentation control systems involve the application of planning, scheduling and control actions that will minimize the adverse impacts of erosion, transport and deposition of soil. The following five (5) basic principles are essential elements that must be incorporated in a sound soil erosion and sedimentation control plan prior to the disturbance of the site. 1. The project shall be, to the greatest extent possible, planned to harmonize with the natural topography, soil types, waterways and existing vegetation found at the site. 2. On-site erosion control measures shall be utilized to prevent erosion from the site to the greatest extent possible. 3. Sedimentation control measures shall be utilized to prevent soils from being washed off the site. 4. An ongoing inspection and maintenance program shall be developed and approved by the ESD prior to any disturbance of soil on the site. (b) In practice, these principles shall be used together in the planning process. The planning process shall identify potential soil erosion and sedimentation control problems before soils on the site are disturbed. Vegetative control measures are required for all disturbed areas and generally shall include filter strips, temporary or permanent seeding, sodding, mulching and erosion-control blankets. Structural control measures are required when runoff leaves a disturbed site and generally include sediment traps, diversions, sediment basins and permanent drainage facilities. (c) The soil erosion and sedimentation control plan shall include appropriate construction specifications for all control measures. These specifications shall be developed by the design engineer as required to address site-specific conditions. Typical specifications may be obtained from the Guidebook of Best Management Practices for Michigan Watersheds, available from the Michigan Department of Environmental Quality. (d) Construction Sequencing (TREATMENT TRAIN). Soil erosion and sedimentation control measures shall start with erosion protection where soil is disturbed and follow with proper conveyance and filtering measures and placing sediment basins/traps at low points before runoff leaves the site. (e) Removal. All temporary soil erosion and sedimentation control measures shall be removed after the final site stabilization is achieved or after the temporary measures are no longer needed. (3) Soil Stabilization. (a) Soil Erosion Protection. The surface of stripped areas shall be protected from soil erosion immediately after the final grade is reached. Temporary erosion protection shall be provided over stripped areas that are not at final grade. Temporary protection shall be maintained until permanent protective cover is established and the site is stabilized. (b) Vegetative Measures. For vegetative soil stabilization measures, plants shall be selected which are appropriate to the season and site conditions. Adequate seedbed preparation shall be provided for plants to germinate and grow. (c) Earth Structures. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. (d) Watercourses. The bed and banks of a watercourse shall be continuously stabilized as work progresses along the watercourse. (e) Stockpiles. If a stockpile of soil is to remain in place more than three (3) days, soil erosion and sedimentation control measures shall be provided such as a tarp cover, sediment trap around the stockpile or seed and mulch. (f) Area Limitation. 1. Disturbed areas draining one (1) acre or less are to be protected by a flow barrier such as silt fences or check dams to control runoff. Vegetated filter strips shall not be used as a primary device but can be used as a backup in conjunction with other control measures. 2. Disturbed areas larger than one (1) acre shall have sediment controls, such as a sediment basin, in addition to flow barriers. (g) Concentrated Flows. Concentrated runoff shall not be allowed to flow down cut or filled slopes. Runoff shall be contained within an adequate temporary or permanent channel, flume or slope drain structure. (h) Velocity Control. Stormwater conveyance facilities that are either temporary or permanent in nature shall be designed to prevent erosive velocities. (i) Storm Drain Protections. Storm drain inlets shall be protected with sediment trapping and filter control devices during construction. (j) Construction Site Ingress and Egress. A stabilized mat of aggregate, underlain with filter fabric material, shall be located at any point where vehicular traffic will be entering and leaving a construction site. When the tracking of soil offsite becomes a particular problem, a wash station(s) and/or street sweeping shall be required to reduce soil tracked offsite.

(Ord. No. 2022-20, § 1, 7-26-22)

Ask a question about Grand Rapids law

Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.