For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-0303 — Stoker installation

Fargo Municipal Code, Fargo, North Dakota (Supp. No. 14, Update 5: codified through Ordinance No. 5555, adopted August 17, 2026) · Fargo Municipal Code § 30-0303

Corpus is an independent public-information project, not the official City of Fargo website. Stable reference: corpuslaw.us/code/97885565-b510-4523-bc7d-1f6a699cdd48

30-0303. - Stoker installation.

The construction, arrangement, equipment, and manner of installation of all stokers hereafter installed for use in connection with heating plants in or for buildings in the city, and the alteration hereafter of all such stoker installations shall conform to the following provisions: A. Nonautomatic stokers not allowed—Exceptions—When. Stokers which are not equipped with automatic means of preventing excessive pressure or temperatures of the heating medium shall not be installed or operated in any location where a competent attendant will not be constantly on duty on the premises while the stoker is in operation. B. Automatic controls. Each mechanical stoker shall be equipped with at least one high-limit control so connected as to shut off power from stoker drive in the event of excessive pressure in a steam boiler or excessive temperature in a hot-water boiler or warm-air furnace casing. Each steam boiler or hot-water boiler shall be equipped with a low-water cutoff. Where there may be an overrun of heat due to sustained period of operation for the stoker, a reverse action control or equivalent control shall be installed in hot-water or steam systems so as to relieve this condition. On all installations where operation of stokers is controlled by an aquastat, pressurestat or furnacestat, a second control, either aquastat, pressurestat or furnacestat, shall be installed in the 110-volt line ahead of all controls as a high-limit or safety control. C. Stoker capacity, setting heights and combustion space. The capacity of a stoker for any given installation shall be in accordance with load-carrying capacity set forth by the Stoker Manufacturers' Association. In any event, the stoker installed shall have a capacity or feed rate not to exceed 50% greater than that required in said table of Stoker Manufacturers' Association. The distance from retort to crown sheet and the space for combustion, within any boiler or furnace, shall be such as to secure efficient smokeless combustion and shall be in accordance with the table set forth by the Stoker Manufacturers' Association. Where stokers are installed in old boilers and strict compliance with the foregoing requirements cannot be met, minor modifications may be made subject to the approval of the building inspector. D. Alterations to combustion chambers. Where stokers are installed in downdraft boilers, the upper grates shall be removed and baffling changed where necessary to secure an unrestricted combustion space. E. Used stokers—Reconditioned. It shall be hereafter unlawful for any person to install any used stoker, or for the building inspector to issue any permit authorizing such installation, until such person shall have first submitted, with his application for such permit to install, a copy of the purchase order stating that a used, repaired, or reconditioned stoker is to be installed and bearing a statement by the installer that said stoker has been properly reconditioned and will comply in every way with the requirements of this chapter for new equipment as to operation and adjustment. F. Approved stokers required. It shall be unlawful for any person to install within the city any stoker not approved by the Stoker Manufacturers' Association. G. Stoker equipment installation permit required. Any person may install an approved stoker and its associated equipment in accordance with the provisions of this chapter, but no stoker equipment shall be installed in the city unless and until the building inspector shall have issued a permit for the specific installation. H. Application. Application for the installation permit herein required shall be made in writing signed by the dealer or installer, stating the location of the property or building in which the installation is intended, the name, type, and model of the stoker, type and model of controls, stoker capacity, setting heights and combustion space, accompanied by a sketch, if deemed necessary by the building inspector, showing the layout of controls for the purpose of installation. I. Granting permits. Within 48 hours after filing of the application and sketch, the building inspector shall issue such permit or in writing notify the applicant of changes required before a permit will be issued or the reason why the application is denied. Upon the required changes being made in the application or sketch, a permit shall be issued. No stoker equipment of a different kind than that specified in the application and no other changes shall be made, nor shall the installation be made in any other manner than as described in such application or shown in the sketch submitted therewith. J. Inspection of installations. All installations of stokers installed within the city shall be inspected by the building inspector. An approval of installation shall be given the installer before any stoker is turned on for use. Installers of stokers shall give at least 24 hours' notice that a stoker installation is ready for inspection.

Source: 1952 Rev. Ord. 968 (1956), 1087 (1960).

Ask a question about Fargo law

Corpus searches the Fargo sections it holds and shows the ones that match, with their citations. Free, no sign-in.