§ 3-84 — Excavation permit required; charge for repairs
Code of Ordinances, City of Gulfport, Mississippi (Supp. No. 68: codified through Ordinance No. 3551, enacted January 20, 2026) · Gulfport Code of Ordinances § 3-84
Corpus is an independent public-information project, not the official City of Gulfport website. Stable reference: corpuslaw.us/code/978a3b9d-2621-4784-8b42-953b09ea1d3a
Sec. 3-84. - Excavation permit required; charge for repairs.
It is hereby required that a permit be taken out for each excavation in any street, avenue, alley or sidewalk. Whenever any person making an excavation on the street or alley fails to refill the same in a proper manner as required by this article, or fails to maintain the same for a reasonable period satisfactorily to the city engineer, then the director of public works shall cause such work to be done, and the cost thereof shall be charged against the deposit hereinafter provided. It is further provided that the city shall set up a fee of fifteen dollars ($15.00) for three-quarter-inch pipe and twenty dollars ($20.00) for one-inch pipe which shall be the normal charge for each repair to streets, avenues, alleys or sidewalks to any person applying therefor, all work and liability involved to rest solely with the city.
(Code 1963, § 20-43)
Ask a question about Gulfport law
Corpus searches the Gulfport sections it holds and shows the ones that match, with their citations. Free, no sign-in.
