Sec. 14-1006. - Pollution control measures.
The responsible party of any construction site within the city shall implement measures necessary to control erosion, sedimentation, debris, and storm water pollution. The responsible party is responsible for the maintenance and performance of the temporary pollution control measures until permanent measures are in place. The pollution controls are designed to be selected by the developer based on the most cost effective and appropriate means to provide the required controls. In instances where a specific pollution problem is not present, controls are not required. Suggested best management practices are detailed in Section 4 of the Storm Water Management Guidance Document for Development Planning and Construction Activities. (1) Temporary pollution control measures (during-construction). This paragraph provides examples of temporary pollution control measures that can be used to control erosion and sedimentation. a. Structural control of soil erosion. 1. Silt fences may be utilized, where necessary, to retain the sediments from disturbed areas within the site and decrease the velocity of sheet flows. [BMP 4.2.1.1 Filter Fabric Fence] 2. Straw bales may be utilized, where necessary, to retain sediments from disturbed areas within the site and decrease the velocity of sheet flows. Straw bales are particularly useful in paved areas where silt fences cannot be erected. [BMP 4.2.2.1 Straw Bale Fence] 3. Stabilized construction entrances should be designed to reduce the amount of soil tracked off the construction site by vehicles leaving the site. A stabilized construction entrance should be utilized, if necessary, to control tracking. The responsible party should ensure that vehicles entering and leaving the construction site use the stabilized construction entrance. The owner or operator of a vehicle entering or leaving a construction site may not track soil off the construction site unless the operator uses the stabilized construction entrance. [BMP 4.7.1 Stabilized Access Roads and Parking Areas] 4. Vegetative buffer strips, of appropriate size should be maintained, where necessary and practical, to aid in reducing the velocity of storm water and in trapping sediments in the storm water leaving the site. A vegetative buffer will usually suffice as a structural control until final stabilization is accomplished. [BMP 4.2.5 Vegetative Buffer Strips] 5. Inlet protection barriers must be installed around all inlets until the area immediately surrounding the inlet is paved or stabilized. [BMP 4.5.1.1 Inlet Protection Barriers] b. Waste controls. Waste disposal must be accompanied in a manner so that no solid wastes, including building materials, hazardous substances, oil, or packaging leave the site, except for disposal at an appropriate, approved solid waste management facility, in conformance with the Texas Solid Waste Disposal Act. To the extent practicable, no solid waste, including building materials, hazardous substances, or oil may be allowed to enter the city's municipal separate storm sewer system, the city's streets, or the navigable waters of the United States. Building materials include, but are not limited to, uncovered stockpiles of soil, sand, dry cement, lumber, bricks, or other products used in construction. The prime contractor, who is issued the building permit, is responsible for the conduct of all subcontractors with regards to disposal of wastes generates by the construction activities at the site. c. Dust control. Dust control should be provided at whatever frequency required. d. Hazardous material storage. Chemicals, paints, solvents, fertilizers, and other toxic materials must be stored in waterproof containers. Except during applications, the contents must be kept in trucks or in storage facilities. Runoff containing such materials shall be collected, removed from the site, and disposed of at an approved solid waste or chemical disposal facility. e. Concrete trucks. The responsible party may not allow the owner or operator of a concrete truck to wash out or discharge surplus concrete or drum wash water at a construction site, unless the surplus concrete or drum wash water in concrete trucks is discharged at a facility on the construction site that will retain all concrete wash waters or leachates, including any wash waters or leachates mixed with storm water. Concrete wash waters and leachates may not be allowed to enter the municipal separate storm sewer system, city streets, the waters of the United States, or ground waters. f. The responsible party may adopt alternative procedures, such as regularly scheduled street cleaning in the immediate vicinity of the construction site, instead of adopting temporary structural controls for erosion under subsection (a)(1) of this section. If alternative procedures will be used, the responsible party shall include those provisions in its NPDES or TPDES storm water pollution prevention plan, pollution control plan, or the plans submitted for a building permit, if an NPDES or TPDES storm water pollution prevention plan or pollution control plan is not required. (2) Permanent pollution control measures (post-construction). a. Permanent stabilization must be applied to all unpaved areas that have reached final grade or those areas that will not be disturbed within the next forty-five (45) days. Permanent stabilization consists of sodding, seeding, or mulching with a seed bearing hay that will provide for new growth within a three-month period. New vegetative ground cover must be maintained by watering, re-grading, reseeding, sodding, as necessary, until seventy (70) per cent growth coverage is obtained. [See Guidance Document BMP 4.2.4.1 Seeding with Mulching] 1. Acceptance of improvement by the city can occur before the permanent stabilization coverage requirement is met, if the developer agrees to maintain the stabilization until coverage is achieved and all other permanent measures are complete. 2. Once permanent stabilization has been achieved, the responsible party may notify the director of developmental services that permanent stabilization has been achieved. 3. After inspection of the site by a city inspector, the director of developmental services will send the responsible party written confirmation that permanent stabilization has been achieved. b. Erosion control structures must be provided where necessary to control erosive velocities in unlined channels or swales leaving the site. [See Guidance Document BMP 4.1.3.1 Pipe Slope Drain and BMP 4.1.4.1 Paved Flume] c. Sediment traps must be provided on the site, as necessary, to control sedimentation from concentrated storm water discharges into an environmentally sensitive area. Individual assessments must be made on a site specific basis. However, a rock rubble low berm must be installed around an outfall that discharges directly into an environmentally sensitive area, unless this requirement is waived by the director of developmental services because the responsible party has installed another type of sediment trap that provides equal or better protection. [See Guidance Document BMP 4.3.2.1 Stone Outlet Sediment Trap and BMP 4.3.2.2 Excavated Earth Outlet Sediment Trap] d. Stenciling, metal plates anchored in concrete inlets, precast manhole covers, wording stamped in concrete, or other acceptable form of signing must be provided on top of any storm sewer inlets. [See Guidance Document BMP 4.9.15 Inlet Stenciling] (3) Scheduling of control measures. Pollution control measures must be implemented in a sequence that will provide maximum storm water pollution control based on the following principles: a. Down slope and side slopes perimeter controls must be installed before land disturbing activity occurs. b. The responsible party shall not disturb the site until the responsible party is ready for construction to proceed. c. Efforts to provide cover or stabilize disturbed areas must occur as soon as possible. d. Construction of infiltration measures must be delayed until the end of the construction project when upstream drainage areas have been stabilized. e. Temporary perimeter controls may not be removed until all upstream areas are finally stabilized. (4) Inspection of pollution control measures. The responsible party shall inspect all pollution control measures every fourteen (14) calendar days and within twenty-four (24) hours following a rainfall of 0.5 inches or greater, at the site. As an alternative, pollution control measures may be inspected every seven (7) calendar days. The inspections must occur on a specifically defined day, regardless of whether or not there has been a rainfall event since the previous inspection. The responsible party shall and maintain a record of each inspection, which shall be made available for inspection by a representative of the city during normal business hours. (5) Maintenance of pollution control measures. a. The responsible party shall maintain and ensure adequate performance of the temporary pollution control measures until permanent pollution control measures are in place. b. Whenever the temporary or permanent pollution control measures do not to keep soil, sediment, and debris on the construction site, such as excessive tracking of dirt offsite by vehicles and runoff of sediments from the site over sidewalks and into the streets and gutters, etc., the responsible party shall remove the soil, sediment, and debris from streets, sidewalks, and inlets, as necessary, return the soil and sediment to the areas to be stabilized, and properly dispose of the debris. c. The owner or person in control of site is responsible for the maintenance of any permanent pollution control measures located on the site, unless the owner has dedicated the permanent pollution control measure to the city and has provided the city with any easements necessary to allow access to the permanent pollution control measure and to conduct of any required maintenance activities. (5) Maintenance agreements between a responsible party and city. a. If all permanent pollution control measures, other than the required stabilization, are complete, a responsible party may provide a maintenance agreement for the required stabilization. This agreement may allow the responsible party to receive acceptance of improvements by the city and allow the filing of the final plats. b. The maintenance agreement must be submitted with the engineer's certification of infrastructure completion. The director of developmental services will execute the agreement at the time of acceptance of the public improvement, subject to any terms and conditions set out in the agreement. c. If a change in ownership occurs during the period when temporary measures are still in place, the maintenance agreement between the city and the responsible party, who entered into the agreement, will remain in force until: 1. Such time as either all permanent pollution control measures are in place (stabilization at seventy (70) per cent coverage). 2. A new responsible party has entered into an agreement with the city to assume the prior responsible party's responsibilities under the agreement with the city. 3. A new owner acquires the tract with notice of the requirements of the maintenance agreement and agrees to assume the liabilities and responsibilities under the agreement of the responsible party, who entered into the agreement with the city, at which time the new owner becomes responsible for the maintenance of the portion of the site to which the new owner has title. d. The original responsible party, who entered into the maintenance agreement with the city, remains responsible for the balance of the site under the terms of the original agreement for maintenance. e. Once the responsible party has satisfied all terms and conditions of the maintenance agreement, including permanent stabilization, the responsible party shall notify the director of developmental services. f. After inspection of the site by a city inspector, the director of developmental services will send the responsible party written confirmation that the responsible party has complied with the agreement and the agreement is terminated.
(Ord. No. 25467, § 1, 9-9-2003; Ord. No. 029265, § 4, 10-25-2011)
Ask a question about Corpus Christi law
Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.