§ 6-24-6 — Conditions for access to the city's rights-of-way
Memphis Code of Ordinances (Supp. No. 33: codified through Ordinance No. 5959, enacted May 12, 2026) · Memphis Code of Ordinances § 6-24-6
Corpus is an independent public-information project, not the official City of Memphis website. Stable reference: corpuslaw.us/code/98281209-33c8-4718-a10a-a2d2723bf4f9
Sec. 6-24-6. - Conditions for access to the city's rights-of-way.
A. No telecommunications company or utility owner shall be permitted to install underground or above ground any telecommunication system or related facilities within the city's rights-of-way without first obtaining permission from the city by executing a right-of-way agreement or a permit. No telecommunications company or utility owner shall cause or allow any telecommunication systems or related facilities to continue to occupy the city's rights-of-way after the effective date hereof without obtaining a right-of-way agreement or other authorization from the city, except that any such telecommunications company or utility owner shall be permitted to continue to occupy the city's streets and rights-of-way pursuant to any unexpired specific route or encroachment agreement as long as any such company is not in default thereunder. This chapter shall supersede and replace any unexpired franchise agreement governing access and construction activities within the city's public rights-of-way (non-resellers' ordinances). B. Upon making application to the chief administrative officer for a right-of-way agreement under this chapter, the telecommunications company shall pay a permit application fee to the city for processing the permit application, reviewing plans, and other administrative services. The total amount of the required application fee shall include a base fee of $750.00 plus $200.00 for each mile of the proposed installation within all or a portion of the city's public rights-of-way over the initial two miles of installation. The city engineer shall determine whether permits shall be required for non-material modifications or repairs to existing systems. C. All utility installations within the city's streets and rights-of-way and all work performed within the city's streets and rights-of-way or otherwise, including without limitation any work performed for the city, shall be subject to review and inspection by the city engineer to ensure conformity with all city engineering and construction standards, which standards shall be deemed a part of the right-of-way agreement by reference. The inspection fee shall equal $1.00 per linear foot of the proposed installation within all or a portion of the city's public rights-of-way. The city engineer shall have the discretion to assign one or more inspectors, either city employees or specially employed engineering contractors, to inspect the installation periodically and if necessary place one or more inspectors on the site for the duration of construction activities depending on availability of staff engineers, the magnitude and the complexity of the utility installations within the city's streets and rights-of-way. Should outside engineering contractors be used for inspection services, the cost of such services shall be paid from the inspection fee with any excess costs to be billed to the grantee. The necessity and extent of such inspectional services will be determined by the city engineer on a case by case basis. If the city engineer and grantee disagree on the need for inspection services, the cost of an inspection or the results of a city inspection, the city engineer and grantee shall meet within ten days to review the issues. The decision of the city engineer on the necessity for such inspectional services may be appealed to the city's chief administrative officer, whose decision shall be conclusive and final. D. The city engineer shall have the authority to reject substandard work or materials and/or to suspend or stop work, in whole or part, where the telecommunications company fails to comply with any material requirement of this chapter or the terms of the right-of-way agreement related to the work being suspended or stopped or where any unsafe or hazardous condition exists unless and until corrective measures have been made to the satisfaction of the city engineer. Any such suspension shall relate only to the permitted project and shall not affect any other separate installations. E. Any inspection or control exercised by the city over the construction activities of the utility owner shall in no way relieve the utility owner of any duty or responsibility to the general public nor shall such services and/or control by the city relieve the utility owner from any liability for loss, damage or injury to persons or adjacent properties. F. All application, review and inspection services performed by city personnel shall be taken into consideration in determining periodic right-of-way compensation under section 6-24-11 of this chapter to ensure that the costs of performing application, review and inspection services are not duplicated. The decision of the city's chief administrative officer shall be final and conclusive with respect to conditions, terms, stipulations and provisions to be included in any right-of-way agreement. G. Small cell master development plan and permit application. 1. The city shall develop a master development plan which will support the development of a master license agreement, a pole attachment agreement for private access to right-of-way (ROW), and a city facilities lease agreement. 2. The master development plan will define and develop standards for small cell equipment and a process for the installation of private equipment on public infrastructure and facilities, taking into consideration the input of carriers and adherence to any state and federal regulations. The master development plan which shall define minimum design criteria and fee structure for use of the ROW and for city owned facilities (including buildings/structures not in the ROW). The design criteria shall contemplate: a. Minimal impact to the city's ROW; b. Enhancement of the city's ROW with new infrastructure in non-compliance locations; c. Standardized aesthetic appearance on sidewalks and poles in order to maintain the integrity of the existing streetscape in residential, historic, or recreational uses in certain areas of town; d. Ensure safe pedestrian, ADA, and auto thoroughfares. 3. The master development plan shall adopt a design manual for the installation and construction of network nodes and new node support poles in the public right-of-way that includes additional installation and construction details. 4. The master development plan shall evaluate factors to define a fee structure and publish a fee structure plan. 5. Permit application review process. a. The city shall process each permit application on a nondiscriminatory, first-come-first-served basis. b. A network provider shall provide a design plan in compliance with the city's master development plan, on the date the permit application is filed, in addition to any other information reasonably required by the division of public works and/or engineering. c. Not later than the 30th day after the date the city receives an application for a permit for a network node or node support pole, or the 21st day after the date the city receives an application for a permit for a transport facility, the city shall determine whether the application is complete and notify the applicant of that determination. If the city determines that the application is not complete, the municipality shall specifically identify the missing information. d. The city shall approve an application that does not require zoning or land use approval under this chapter unless the application or the corresponding work to be performed under the permit does not comply with the municipality's applicable codes and/or does not meet the requirements under the master development plan. e. The city must approve or deny an application for a node support pole no later than the 90th day after the date the city receives the complete application. The city must approve or deny an application for a network node not later than the 60th day after the date the city receives the complete application. The city must approve or deny an application for a transport facility not later than the 30th day after the date the city receives a complete application. An application for a permit for a node support pole, network node, or transport facility shall be deemed approved if the application is not approved or denied on or before the applicable date for approval or denial prescribed by this subsection. f. The municipality that denies a complete application must provide in writing a basis for the denial, including the specific applicable code provisions on which the denial was based. g. Not later than the 30th day after the date the city denies the application, the applicant may cure the deficiencies identified in the denial documentation and resubmit its application without paying an additional application fee. Notwithstanding the city shall approve or deny the revised completed application after a denial not later than the 60th day after the date the municipality receives the completed revised application. The city's review of the revised application may be limited to the deficiencies cited in the denial documentation. h. The city may extend any of the deadlines provided under this section as warranted by extenuating circumstances on a case by case basis by issuing notice to the public and to any applicant whose application may be affected.
(Ord. No. 5551, Art. VI, 11-18-2014; Ord. No. 5678, § 3, 2-6-2018)
Ask a question about Memphis law
Corpus searches the Memphis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
