Sec. 5-113. - Testing procedures.
Test of radio coverage will be conducted pursuant to those specifications in the city in-building public safety radio system coverage specifications, attached and incorporated into Ord. 2008, ch. 08-35 as attachment "A," as summarized below.
(1) Initial tests.
a. New buildings. Initial tests will be performed by FCC certified technicians, authorized by the communications division, or by such agency in accordance with test standards as listed in the city in-building public safety radio system coverage specifications, attached and incorporated into Ord. 2008, ch. 08-35 as attachment "A." A certificate of occupancy shall not be issued to any structure if said structure, or any part thereof, fails to comply with these test standards.
b. Existing buildings. Within twelve (12) months of an approved ordinance, initial tests will be performed by FCC certified technicians, authorized by the communications division, or by such agency in accordance with test standards as listed in the city in-building public safety radio system coverage specifications, attached and incorporated into Ord. 2008, ch. 08-35 as attachment "A." If building owner fails to comply with these test standards, the building will be considered as non compliant.
(2) Annual tests. Annual tests will be conducted by PFD, the local fire department personnel, or their agent in accordance with the test standards as listed in the city in-building public safety radio system coverage specifications, attached and incorporated herein as attachment "A."
(Ord. 2008, ch. 08-35, § 1, 7-3-08)