Sec. 7-52. - Permit fees.
(a) Generally. Mechanical permit and inspection fees are established as follows:
For issuing each permit a fee of ten dollars ($10.00) plus the following:
Air conditioner/heat pump outside unit/
gas air conditioners/chillers
Up to 1 ton .....$7.00
1—5 tons .....10.00
6—25 tons .....15.00
26—50 tons .....18.00
51—100 tons .....25.00
Over 100 tons .....50.00
Refrigeration units and open coolers
Up to 1 ton .....7.00
1—5 tons .....10.00
6—25 tons .....15.00
26—50 tons .....18.00
51—100 tons .....25.00
Over 100 tons .....50.00
Boilers
0—250,000 BTU .....16.00
250,001—500,000 BTU .....20.00
500,001—1,000,000 BTU .....30.00
Over 1,000,001 BTU .....50.00
Package equipment
Package unit/plus tonnage .....10.00
Miscellaneous
Air handler/electrical furnace .....10.00
Blower coils/freezer/cooling boxes .....10.00
Unit or duct heater .....10.00
Central gas furnace .....10.00
Wall and floor furnaces .....10.00
Commercial/industrial clothes dryer .....8.00
Ventilation fans above ¼ HP .....8.00
Commercial hoods .....15.00
Incinerators .....15.00
Reinspection fee .....15.00
(b) Where work for which a permit is required is started or proceeded with prior to obtaining said permit, the fee herein specified shall be doubled, but the payment of such double fee shall not relieve any persons from fully complying with the requirements of the mechanical code in the execution of the work nor from any other penalties prescribed therein.
(c) For buildings that are (1) one hundred million dollars ($100,000,000.00) or more in valuation and (2) are eligible for fee-in-lieu, the permit fee shall not exceed twenty-five thousand dollars ($25,000.00) per building.
(Ord. No. 4568, 12-20-22; Ord. No. 4600, 8-5-25)