§ 18-28 — Inspection
Code of Ordinances, City of Hattiesburg, Mississippi (Supp. No. 3: codified through Ordinance No. 3388, enacted September 16, 2025) · Hattiesburg Code of Ordinances § 18-28
Corpus is an independent public-information project, not the official City of Hattiesburg website. Stable reference: corpuslaw.us/code/99c12154-72ac-4a5c-82d0-63a3de03aeb7
Sec. 18-28. - Inspection.
(a) Procedure. The director of the public services department or his/her designated representative, and the building official of the urban development department or his/her designated representative shall coordinate inspections as hereinafter required and either shall approve that portion of the work completed or shall notify the permittee wherein the work fails to comply with the stormwater pollution prevention plan as approved. Plans for grading, stripping, excavating, and filling work bearing the stamp of approval of the site plan review committee shall be maintained at the project site and made available for periodic inspection by the city and/or MDEQ during the progress of the work. To obtain inspections, the permittee shall notify the office of the building official in the urban development department at least two working days before the following: (1) Installation of sediment and erosion measures (inspection by public services department); (2) Completion of site clearing and grubbing (inspection by public services department); (3) Start of building construction (inspection by urban development department); (4) Completion of final grading (inspection by urban development department); (5) Completion of final landscaping (inspection by urban development department). (b) Requirements. The permittee or his/her representative shall make regular weekly inspections of all control measures in accordance with the inspection schedule outlined on the approved stormwater pollution prevention plan. The purpose of such inspections will be to determine the overall effectiveness of the control plan and the need for additional control measures. All inspections shall be documented in written form and submitted to the site plan review committee at the time interval specified in the approved permit. (c) Schedules. Inspection of all erosion controls and other SWPPP requirements shall be performed by the permittee or his/her representative during land disturbing activities. Inspections shall be performed: (1) At least once a week; (2) Within 24 hours of the end of a storm event of a half-inch or greater; (3) As often as is necessary to ensure that appropriate erosion and sediment controls have been properly constructed and maintained and determine if additional or alternative control measures are required. (d) Documentation. All inspections associated with this permit must be documented and certified (refer to inspection and certification forms found in small or large construction general permit). Documentation must include the day and time the inspection was performed, who performed the inspection, any deficiencies noted, and corrective action needed. Documentation of all inspections must be kept with the SWPPP. Inspections must continue until such time that planned construction activities have been completed, land disturbing activities have ceased and disturbed areas have been stabilized with no significant erosion occurring. (e) Authorized entry. The building official, director of public services or their designated representative shall enter the property of the applicant as deemed necessary to make periodic inspections to ensure the validity of the reports filed under subsection (b) of this section.
(Ord. No. 2947, § VIII, 2-20-2007)
Ask a question about Hattiesburg law
Corpus searches the Hattiesburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.