For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17-0606 — Hazardous waste notification

Fargo Municipal Code, Fargo, North Dakota (Supp. No. 14, Update 5: codified through Ordinance No. 5555, adopted August 17, 2026) · Fargo Municipal Code § 17-0606

Corpus is an independent public-information project, not the official City of Fargo website. Stable reference: corpuslaw.us/code/9b9a8033-0a64-45d0-9107-4b2bcbf6e0cd

17-0606. - Hazardous waste notification.

Any user that is discharging more than 15 kilograms of hazardous wastes as defined in 40 C.F.R. §261 (listed or characteristic wastes) in a calendar month or any facility discharging any amount of acutely hazardous wastes as specified in 40 C.F.R. §§261.30(d) and 261.33(e) is required to provide a one-time notification in writing to the city, to the EPA Region 8 Hazardous Waste Director, and to the state of North Dakota. Any existing user exempt from this notification shall comply with the requirements contained herein within 30 days of becoming aware of a discharge of 15 kilograms of hazardous wastes in a calendar month or any discharge of acutely hazardous wastes to the city sewer system. Such notification shall include: A. The name of the hazardous waste as set forth in 40 C.F.R. Part 261. B. The EPA Hazardous waste number; and C. The type of discharge (continuous, batch, or other). D. If an industrial user discharges more than 100 kilograms of such waste per calendar month to the sewer system, the notification shall also contain the following information to the extent it is known or readily available to the industrial user: 1. An identification of the hazardous constituents contained in the wastes, 2. An estimation of the mass and concentration of such constituents in the waste streams discharged during that calendar month, and; 3. An estimation of the mass of constituents in the waste streams expected to be discharged during the following 12 months. These notification requirements do not apply to pollutants already reported under the self-monitoring requirements. Whenever the EPA publishes final rules identifying additional hazardous wastes or new characteristics of hazardous waste, a user shall notify the city of the discharge of such a substance with 90 days of the effective date of such regulations. In the case of any notification made under this paragraph, an industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.

Source: 5203 (2019).

Ask a question about Fargo law

Corpus searches the Fargo sections it holds and shows the ones that match, with their citations. Free, no sign-in.