For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 120-9 — Storm Water Management Plan

Milwaukee Code of Ordinances (Volumes 1-3 revised through Common Council action of Sept. 22, 2026) · Milwaukee Code of Ordinances § 120-9

Corpus is an independent public-information project, not the official City of Milwaukee website. Stable reference: corpuslaw.us/code/9ba09298-69dc-4404-b282-d33731aec02b

120-9. Storm Water Management Plan.

The person shall be responsible for the preparation and implementation of the storm water management plan. Sufficient information shall be furnished to the city engineer for evaluating the environmental characteristics of the affected areas. Such information shall include the potential and predicted impacts on watercourses, the effectiveness and acceptability of the proposed measures for reducing adverse impacts and a maintenance program. 1. GENERAL INFORMATION. The storm water management plan shall be prepared by a registered professional engineer. It shall contain the person's name, address and telephone number. The plan shall also contain but is not limited to narrative descriptions and explanations, maps, charts and graphs, tables, photographs, calculations and supporting reference information to books, publications, manuals and other documents used. The department of public works reserves the authority to determine the appropriateness of the methodology used. 2. EXISTING SITE CONDITIONS. The description of the existing site conditions shall include: a. The hydrologic parameters. b. The location of areas where storm water collects or percolates into the ground. c. Groundwater levels. d. Vegetation, including grasses, forbs, trees, shrubs, wildflowers and aquatic plants that are native to Wisconsin, as well as any oldfield successions of native and non-native plants. e. Topography. f. Soils. g. Location and description of impervious areas. h. Locations of all structures and buildings. i. Locations of floodplains. j. Locations of all receiving bodies of water on or adjacent to the site or into which storm water flows. Information regarding current water quality and classification, if any, shall be provided. k. Existing storm water runoff conditions from adjacent tributary areas. L. Location and hydraulic conditions of the storm sewer systems. 3. SITE ALTERATIONS. The description of the proposed site alterations shall include: a. Areas where vegetation is disturbed or planted, including areas of grasses, forbs, trees, shrubs, wildflowers and aquatic plants that are native to Wisconsin, as well as any oldfield successions of native and non-native plants. b. Changes in topography. c. The size and location of any building or structure. d. Site use and any Standard Industrial Classification (SIC) code number. e. Changes of impervious surface areas and a description of the surfacing material. 4. PREDICTED IMPACTS. The description of the predicted impacts on water quality and quantity from the proposed development shall include: a. Drainage facilities. b. Receiving bodies of water. c. Floodplains. d. Ground water levels. 5. BEST MANAGEMENT PRAC-TICES. The description of the proposed best management practices to be used for the protection of water quality and the reduction of water quantity shall include: a. Detention, retention and sedimentation facilities, including plans for discharges from the facilities, maintenance plans and predictions of water quality. b. Areas of the site to be used or reserved for percolation including a prediction of the impact on groundwater quality. c. Green infrastructure. d. Any other relevant volume controls or measures not described in pars. a or b. e. Infiltration practices shall be permitted according to s. NR 151.124, Wis. Adm. Code, provided the person presents evidence of sufficient soil infiltration rates using scientifically credible field test methods to show that the infiltration rates are 0.6 inches per hour or above and the soil profile is not clay. f. Swale treatment for transportation purposes may be used according to s. NR 151.249, Wis. Adm. Code, provided the transportation facility development does not conflict with the criteria specified in s. 120-7-2. In case of a conflict, the more restrictive criteria of s. 120-7-2 shall be used. g. A plan for the control of erosion and sedimentation in accordance with ch. 290. h. Any other relevant source control practices not described in par. d. i. Any other information which the person or the city believes is reasonably necessary for an evaluation of the development. 6. GUARANTEE. a. The plan shall also be accompanied by an irrevocable letter of credit, certified check or surety bond to guarantee implementation and completion of storm water management plans. By submitting the guarantee, the person consents to allowing the city to inspect the best management practices constructed to meet requirements of the storm water management plan. After construction of the storm water management facilities has been completed, the person shall submit to the city engineer a written certification prepared and stamped by a registered professional engineer that the facilities have been constructed in accordance with the storm water management plan. After the city engineer receives the certification, that portion of the guarantee not utilized under s. 120-17 shall be released or returned. b. The plan shall also be accompanied an irrevocable letter of credit, certified check, surety bond, or letter of financial guarantee from the person to ensure the facilities are maintained. The guarantee shall be in effect until the facilities are recertified as required by s. 120-15.

Ask a question about Milwaukee law

Corpus searches the Milwaukee sections it holds and shows the ones that match, with their citations. Free, no sign-in.