Sec. 78-97. - Deposit of estimated costs when extension constructed by city—Required; amount.
The applicant for any water main extension to be constructed by the city shall make a deposit with the city in an amount equal to the estimated total cost of the water main extension, and such estimated cost shall include all costs for materials, labor, transportation, equipment and other costs, but shall include no charge for engineering, administration and other overhead costs as defined in section 78-96.
(Ord. No. 120551, § 1, 6-28-12)