§ 22.805.010 — General
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.805.010
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/9c5ad64a-d416-498a-adb3-ce79f61e15d4
22.805.010 - General
A. All projects are required to comply with this chapter, even where drainage control review is not required. B. Closely related projects, projects under a common plan of development or sale, subdivisions, and short plats are considered as one project for purposes of applying the Stormwater Code, including but not limited to determining whether the thresholds for applicability of particular Stormwater Code minimum requirements are met. C. When an application requires preliminary drainage review according to subsection 22.807.020.A, applications for building permits, grading permits, and other construction permits on the site receiving preliminary drainage review shall comply with the provisions of the approved preliminary drainage control plan. D. In the case of a subdivision under Chapter 23.22 and short plat under Chapter 23.24, unless an adjustment pursuant to subsection 22.800.040.B is approved by the Director, for the purposes of applying the thresholds in this Chapter 22.805: 1. A subdivision of property does not affect or reduce the requirements of this subtitle, Chapter 21.16, and associated rules promulgated by the Director. The proposed parcels within a subdivision or short plat shall meet the standards required by the higher area threshold of the entire property being subdivided, rather than the standards required for each of the proposed parcels individually. 2. In neighborhood residential (NR) zones, the hard surface coverage is the maximum lot coverage allowed per Subtitle III of Title 23, plus required and proposed pedestrian and vehicular access and amenities, including roadways, driveways, walkways, plazas, and patios identified on the preliminary drainage control plan and associated preliminary site plan, unless otherwise approved by the Director. In all other zones, the hard surface coverage shall be based on an approved site plan showing the maximum allowed build-out including all phases of the subdivision or short plat. E. Construction of drainage control facilities and drainage systems for plats 1. In the case of a subdivision under Chapter 23.22, drainage control facilities or drainage systems that are identified on the associated preliminary drainage control plan or the approved preliminary plat and will serve multiple proposed lots, parcels, tracts, or rights-of-way shall be constructed prior to approval of the final plat unless a bond is provided according to subsection 23.22.070.C. If a bond is provided in lieu of construction prior to approval of the final plat, the construction permit for the facilities or systems must be issued prior to issuance of any building permit for any other construction within the subdivision and construction of the facilities or systems shall be completed and final inspection approved prior to final inspection approval of any building permit for any other construction within the subdivision and prior to occupancy of any buildings, but in no event later than two years after final plat approval. 2. In the case of a short plat under Chapter 23.24 with shared drainage control facilities or drainage systems that are identified on the preliminary drainage control plan and will serve multiple proposed lots, parcels, tracts, or rights-of-way: a. The construction permit that includes the shared facilities or systems shall be issued prior to issuance of any other building permit for any other construction within the lots, parcels, tracts, or rights-of-way served by the shared facilities or systems; and b. Construction of the shared facilities or systems shall be completed and final inspection approved prior to final inspection approval of any building permit for any other construction within the lots, parcels, tracts, or rights-of-way served by the shared facilities, and prior to occupancy of any buildings on these lots, parcels, or tracts. F. No discharge from a site, real property, or drainage facility, directly or indirectly to a public drainage system, private drainage system, or a receiving water within or contiguous to Seattle city limits, may cause or contribute to a prohibited discharge or a known or likely violation of water quality standards in the receiving water or a known or likely violation of the City's municipal stormwater NPDES permit. G. Every permit issued to implement this subtitle shall contain a performance standard requiring that no discharge from a site, real property, or drainage facility, directly or indirectly to a public drainage system, private drainage system, or a receiving water within or contiguous to Seattle city limits, cause or contribute to a prohibited discharge or a known or likely violation of water quality standards in the receiving water or a known or likely violation of the City's municipal stormwater NPDES permit.
(Ord. 127444, § 5, 2026; Ord. 126336, § 4, 2021; Ord. 123105, § 3, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.