§ 26-37 — Water capacity fee
Code of Ordinances, City of Tampa (Supp. No. 148: codified through Ordinance No. 2025-152, enacted December 18, 2025) · Tampa City Code § 26-37
Corpus is an independent public-information project, not the official City of Tampa website. Stable reference: corpuslaw.us/code/9d21a692-6772-401d-a608-0994b11c9873
Sec. 26-37. - Water capacity fee.
(a) A water capacity fee shall be required for any building, structure or property receiving water service from the city. (1) The water capacity fee shall be based on the equivalent residential units (ERUs) and location of the building, structure or property receiving water service and multiplying the number of ERUs by the water capacity fee for one (1) ERU. (2) The water department shall calculate the net ERUs based on the use of the building, structure or property and estimated net projected average daily flow. One (1) ERU is equal to three hundred (300) gallons per day of average water use for the purpose of calculating the number of ERUs. (3) The daily average water flow factors for a building, structure, or property use are outlined in the City of Tampa Water Department Technical Manual. (4) For a building, structure or property with previous water service from the city, previous use will be accounted in calculating the net projected daily flow using the flow factors based on the previous use. a. If a property is located within one of the CIAC areas, where CIAC fees are collected for the cost of transmission and storage system components, a reduced water capacity fee that only accounts for the treatment system component shall apply. b. Affordable housing: 1. In accordance with the F.S. § 163.31801, the city may provide an exception or waiver for the water capacity fee for the development or construction of housing that is affordable, as defined in F.S. § 420.9071. 2. F.S. § 420.9071 definition shall be applied to determine if a development is "affordable" to qualify for $0.00 water capacity fee. It shall be the applicant's responsibility to provide official documents sufficient to demonstrate that a proposed development qualifies under the Florida Statute definition. c. Schedule of water capacity fee per one (1) ERU with effective dates are listed below: March l, 2021 | March 1, 2022 | March 1, 2023 Non-CIAC areas | $1,028 | $1,370 | $1,713 CIAC areas | $612 | $816 | $1,020 Affordable housing | $0 | $0 | $0 d. The water capacity fee will be due to the water department prior to the permit issuance. The water department shall withhold approval on the issuance of any site, utility, building, building remodeling, foundation and/or plumbing permit for a building, structure or utility appurtenance until the applicable capacity fees are paid. e. The water capacity fee, once paid, cannot be transferred or used as a credit or partial payment towards the applicable capacity fee, which may be due and payable for an existing or proposed building, structure or service connection located on or to be located on a different lot or parcel of land. f. The water capacity fees will be reviewed every five (5) years and updated, if determined to be necessary.
(Ord. No. 2020-104, § 3, 10-15-2020)
Ask a question about Tampa law
Corpus searches the Tampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.
