Sec. 28-524. - Location of towers.

(a) A tower permit shall not be approved for the construction of a tower on a lot, tract or parcel of land where the construction of a tower is prohibited, expressly or impliedly, by duly recorded and unexpired deed restrictions or covenants running with the land. (b) In a residential area, a tower permit shall not be approved for the construction or alteration of a tower structure. (c) A tower permit shall not be approved for the construction or alteration of a tower structure unless the proposed tower structure is located a distance at least equal to the applicable setback area established by subsection (g). (d) In an historic district, a tower permit shall not be approved for the construction or alteration of a tower structure unless the proposed tower conforms to the requirements for camouflage design and the HAHC has issued a certificate of appropriateness for the construction of the proposed tower. (e) In an area within ¼ mile of an historic district or landmark, a tower permit shall not be approved for the construction or alteration of a tower structure unless: (1) The proposed tower is located from the historic district or landmark, as applicable, a distance at least equal to the applicable setback area established by subsection (g), which shall for this limited purpose apply without regard to the existence of any residential lot; for purposes of this requirement, measurements shall be made from the perimeter of the historic district or landmark; and (2) One or more intervening buildings, structures, topological features or trees will substantially obstruct a person's sight line of the tower structure from ground level at the perimeter of the historic district or landmark, as applicable. (f) A tower permit shall not be issued for the construction or alteration of a tower structure in a scenic area, nor shall a tower permit be issued for the construction or alteration of a tower structure in a park or on a tract surrounded by a park. (g) A tower permit shall not be approved for the construction or alteration of a tower structure unless the distance between the center of the base of a tower and the nearest residential lot is at least one and one-half times the height of the tower or tower structure. The foregoing measurement shall be made to the nearest point on the property line of the residential lot, unless the tower permit application includes a category 3, condition II survey, as defined by the Texas Surveyors Association, of all properties within the setback area. If the survey is provided, the measurement shall instead be made as follows: (1) If a residence has been constructed on the lot, the measurement shall be from the tower structure to the nearest outside wall of the residential structure on each lot; or (2) If a residence has not been constructed on the lot, the measurement shall be from the tower structure to the center of the residential lot minus 25 feet. (h) A tower permit shall not be approved for the construction or alteration of a tower structure within 1,000 feet of an approved tower structure, other than a tower structure for which a permit would not be required under this article. For purposes of this requirement, a tower is considered to be "approved" when a tower permit has been issued pursuant to this article and the tower structure has been constructed or any building permit issued thereunder remains in effect. The director shall promulgate rules and procedures for establishing precedent to the extent of conflict between two or more tower structures. (i) Property uses and distances referred to in this section shall be determined as of the date and time that the completed tower permit application is filed.

(Ord. No. 91-1734, § 2, 12-11-91; Ord. No. 98-253, § 2, 4-8-98; Ord. No. 2014-364, § 6(Exh. A), 4-30-2014)