§ 74-510 — Stormwater consultation meeting
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 74-510
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/9dd2c30d-75df-4b83-95b6-08b99c0ce5d2
Sec. 74-510. - Stormwater consultation meeting.
(a) When proposed development of a site meets at least one of the applicability criteria found in section 74-504(a), 74-504(c), or where a request for a determination of infeasibility is to be made, the owner or applicant shall participate in a consultation meeting with the department to discuss the post-development stormwater management measures necessary for the proposed development, as well as to discuss and assess constraints, opportunities and ideas for stormwater management measures utilizing stormwater better site design, green infrastructure, and runoff reduction techniques. (b) The consultation meeting shall be held prior to approval of a preliminary plat or the submittal of an application for a permit in accordance with the following procedure: (1) The department shall schedule a consultation meeting within five business days from the date a written meeting request is received by the department. (2) Failure of the department to schedule a consultation meeting within the time required by this section shall waive the requirements of section 74-510(a) and a copy of the written meeting request submitted to the department by the owner or applicant attached to the permit application shall meet the requirement of section 74-509(c)(1). (3) If no consultation meeting is requested or attended by the owner or applicant prior to the submittal of a permit application, the department may delay review of the permit application until such meeting is held; provided however that when the development involves only an application for the erection of a structure governed by chapter 16-28A of the Land Development Code, the requirements of section 74-509(c)(1) and section 74-510(a) shall not apply. (c) To assist the department's review of the development and to assist the applicant or owner with the creation of a stormwater management plan, the following information should be submitted prior to or at the time of the consultation meeting: (1) Existing conditions / Proposed site plans. Existing conditions and proposed site layout sketch plans, which shall illustrate at a minimum: a. existing and proposed topography; b. perennial and intermittent streams; predominant soils from soil surveys; c. boundaries of existing vegetation especially trees; d. proposed limits of clearing and grading; and e. location of existing and proposed roads, buildings, parking areas and other impervious surfaces. (2) Infiltration rates. Infiltration rates shall be determined by soil surveys, on-site soil analysis, or infiltration test. If a site has been previously developed or graded or contains urban soil types, an infiltration test is required. (3) Natural resources inventory. A written or graphic inventory of the natural resources in existence prior to the commencement of the development. Particular attention should be paid to environmentally sensitive features that present constraints for development. This inventory shall address resources both on the site and in the surrounding area that are or may be impacted by the development. This inventory shall also include: a. a description of soil conditions; b. Trees and tree canopy cover; c. topography; d. wetlands; e. other native vegetative areas on the site; and f. the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks, including but not limited to drinking water well setbacks and septic setbacks. (4) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system that identifies the scope and magnitude of the development and related stormwater requirements. The plan shall also include: a. identification and description of how stormwater better site design is used to achieve the stormwater management standards and reduce the need for structural stormwater controls; b. preliminary selection and location of proposed structural stormwater controls; c. location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; d. existing and proposed flow paths and discharges; e. location of floodplain/floodway limits; f. relationship of the site to upstream and downstream properties and drainages; and g. preliminary location of proposed stream channel modifications, such as bridge or culvert crossings. (5) Any request for a determination of infeasibility. (d) The applicant or owner shall receive a certification at the conclusion of the consultation meeting.
(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20)
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.
