For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.566.220 — Approval Criteria for a PIR Master Plan

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.566.220

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/9ee5379f-9859-4f22-8af6-9752f7493f15

33.566.220 Approval Criteria for a PIR Master Plan

The PIR Master Plan will be approved if the review body finds that the applicant has shown that all of the following approval criteria are met: A. Generally. The proposed PIR Master Plan will enhance the special qualities of the plan district, and is consistent with the purpose of the plan district. B. Environmental Requirements. The proposed PIR Master Plan, and development proposed within it, must meet the following requirements: 1. The timing, frequency, and location of large spectator events in the plan district must be controlled to limit wildlife disturbance year-round, with extra limits during breeding season (mid-February to the end of May). Aspects to be controlled include: size, timing (time of day, time between events, numbers of events per day), and location (directing spectators and activity away from certain areas); 2. Lighting must be designed so as to have no adverse impact on environmental zones; and 3. The requirements of Chapter 33.430, Environmental Overlay Zones, and the requirements of the Natural Resources Management Plan for Peninsula Drainage District No. 1 must be met. C. Transportation. 1. The PIR Master Plan must comply with the Transportation Element of the Portland Comprehensive Plan; 2. The transportation system must be capable of safely supporting the proposed development as well as existing uses in the area. Evaluation factors include: a. Access to arterials from the site, and from surrounding neighborhoods; b. Transit availability; c. On-street parking impacts in the surrounding neighborhoods; d. Other neighborhood impacts; Pedestrian and bicycle safety; and e. f. Street capacity and level of service. The traffic analysis and Traffic Management Plan must meet the following: (1) ODOT level of service standards will be maintained during peak hours in the transportation system including the I-5/Victory Boulevard interchange to the Hayden Meadows Drive. If typical weekday commuter peak hour conditions will operate below the ODOT standards, mitigation must be implemented to restore acceptable operations; (2) Traffic management plans will be used during any event with daily attendance in excess of 20,000 visitors. The plan will: • Require scheduling the event to coincide with the off-peak of the commuter system; and • Maintain traffic operations within capacity (volume-to-capacity less than 1.0) during the event. The volume-to-capacity of the I-5/Victory Boulevard interchange to the Hayden Meadows Drive transportation network shall not exceed 1.0 for more than one consecutive hour during event peaks; and (3) A program for regular monitoring of events with more than 20,000 daily visitors must be instituted. The monitoring program must be conducted to identify level of service and volume-to-capacity on the transportation system including the I-5 freeway mainline, and impacts in the surrounding neighborhood. D. Design. Design guidelines and standards in the PIR Master Plan must ensure that: 1. All development in the plan district will enhance the special character of the plan district, and the special character of each subdistrict of the plan district, as described in Section 33.566.010, Purpose, and in the PIR Master Plan itself; An environment will be created which is attractive, safe, and pleasant for pedestrians, 2. including consideration of such elements as the orientation of main entrances, the design of the ground floor—or pedestrian level—of all structures, and provision of amenities such as seating and viewing opportunities; 3. There will be smooth and attractive transitions between the plan district and adjacent areas, and between subdistricts of the plan district. Gateways to the plan district and to subdistricts will be well designed when considering location, appearance, landscaping, and compatibility with the adjacent area; 4. The visual impact of structures visible from natural areas will be minimized; 5. The negative effects of human visitation to natural areas will be minimized; 6. The design of areas and structures used for the racetrack use, including accessory uses, will not overwhelm the overall, natural setting of the plan district; and 7. The design, landscaping, and location of surface and structured parking will minimize negative effects on the natural setting and the pedestrian environment. E. Public Services. Public services for water, police and fire protection and sanitary sewer are capable of serving the proposed improvements or will be made capable by the time the development is completed. F. Stormwater Management. Stormwater must be managed on site and have no negative impact on nearby sloughs, wetlands, or groundwater. Primary treatment for water quantity and quality including temperature must occur prior to stormwater entering existing wetlands or sloughs. The PIR Master Plan must include provisions to manage stormwater quality and quantity for each improvement made to the site. G. Noise. The PIR Master Plan, and the activities that occur within the plan district must meet the requirements of Title 18, Noise Control. H. Implementation. The PIR Master Plan must set out how specific development and use proposals will be reviewed, including review procedures and what standards, guidelines, and approval criteria will be used to evaluate each proposal. Generally, the more specifically a development or use is described in the PIR Master Plan, the lower the level of further review necessary. If no discretion is needed to determine if a proposal complies with the PIR Master Plan, the proposal may be reviewed administratively.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.