§ 33.299.120 — Setbacks and Height

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.299.120

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/9f419ce9-664b-4d6a-b546-05dd4080c693

33.299.120 Setbacks and Height

The height of a turbine is measured to the tip of the rotor blade at its highest point. For pole mounted turbines, height is measured from grade at the base of the pole. For building mounted turbines, height is measured from the base point of the building. A. View Corridors. Although the regulations of this section allow wind turbines to exceed the height limits of the base zones, they are not allowed to extend into a view corridor designated by the Scenic Resources Protection Plan (1991) or the Central City Scenic Resources Protection Plan (2018). B. Pole Mounted. Pole mounted turbines must meet the following. Distances between lot lines and the pole and turbine are measured at the closest points: 1. Front and street setback. The pole and turbine are not allowed in a required front or street setback; 2. Setback from all lot lines. The pole and turbine must be set back at least 10 feet from all lot lines; 3. Height. The pole and turbine are subject to the base zone height limit. However, for every foot that the pole and turbine are set back farther than specified in B.1 and 2, the height of the turbine may increase one additional foot above the base zone height limit. Each additional foot of height is earned when the pole and turbine are set back from all property lines by an additional foot. The height may not increase more than 50 percent above the base zone height limit. See Figure 299-1. Figure 299-1 Pole-Mounted Wind Turbine

![](https://figures.74-208-44-221.nip.io/portland/20261114/f4bf8e28d640eb66fb529b282a0ec1dc89051514e48c5d29277941e87fa335fa.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/00dbaad006cd62062b1e311289ab50543a15b621105239b060459da73497d41e.png)

![Figure 299-1 Pole-Mounted Wind Turbine](https://figures.74-208-44-221.nip.io/portland/20261114/424f3d87795d9fb1354552e0010d09420f6f6e41e8993644dc89bbd5ffb626f1.png)

C. Building mounted. 1. Setbacks. Building mounted turbines are subject to the minimum building setbacks of the building they are mounted on. 2. Height. A turbine may be up to 50 percent above the base zone height limit, or 45 feet above the height of the building it is mounted on, whichever is less. See Figure 299-2.

![](https://figures.74-208-44-221.nip.io/portland/20261114/3d6316f90e3165b581629c85dc2f2a574fd093f73fb503b7d9a954227347bec6.png)

Figure 299-2 Building-Mounted Wind Turbine

![](https://figures.74-208-44-221.nip.io/portland/20261114/3fb8eb902f259329e00849cb16e3d94c74c1fa09d7231000eda67014828f6d1f.png)

![Figure 299-2 Building-Mounted Wind Turbine](https://figures.74-208-44-221.nip.io/portland/20261114/346813ba63ccb410311bfc3b605fab7c53fb6b2e613050be1267295c59cd05ff.png)

D. Exceptions. 1. RF zone. Turbines in the RF zone are subject to Subsections A and B. However, there is no height limit if the turbine is set back from all lot lines a distance equal to its height. 2. EG2, IG, and IH zones. In the EG2, IG, and IH zones, there is no setback or height limit except where lot lines abut R-zoned sites. Where the lot lines abut R-zoned sites: a. Pole-mounted turbines are subject to the following: (1) Setback. They must be set back at least 10 feet from lot lines that abut R- zoned sites. (2) Height. They are subject to the height regulations for pole-mounted turbines that apply to the adjacent R-zone. If the site abuts more than one R-zone, the most restrictive height regulation applies. For every foot that the pole and turbine are set back farther than 10 feet from the adjacent R zone, the height of the turbine may increase one additional foot above the adjacent R-zone base zone height limit. Using this provision, the height may not increase more than 50 percent above the adjacent R-zone base zone height limit. However, there is no height limit if the turbine is set back from all lot lines a distance equal to its height. b. Building-mounted turbines. Building-mounted turbines must meet the setbacks and height regulations that apply to building-mounted turbines in the adjacent R- zone. If the site abuts more than one R-zone, the most restrictive regulations apply.