§ 16-5.02.050 — Permits required—Exceptions
Victorville, California, Municipal Code (Supp. No. 57: codified through Ordinance No. 2466, passed April 7, 2026) · Victorville Municipal Code § 16-5.02.050
Corpus is an independent public-information project, not the official City of Victorville website. Stable reference: corpuslaw.us/code/9f7adbcd-53bb-47bc-9d46-221d8aa2f6db
Sec. 16-5.02.050: - Permits required—Exceptions
(a) Required When. No person shall begin or perform any grading or relocation of earth, and no person shall import or export any earth materials to or from any grading site without first obtaining the appropriate development approval and a grading permit. A separate grading permit is required for each site, but the site designated may be the entire development. (b) Exceptions. A permit is not required for: (1) Excavations below the finished grade for basements and footings of buildings, retaining walls, swimming pools or other structures authorized by a valid building permit if the unsupported height is less than five feet after the structure is completed; (2) Mining, quarrying, excavating, processing, and stockpiling rock, sand, gravel aggregate or clay stockpiling operations conducted under a valid special use permit; (3) Environmental excavations which are subject to Federal, State or County review and permits; (4) Depositing rubbish or other material at a sanitary landfill approved by and operating pursuant to the requirements, rules, applicable zoning regulations and other laws adopted by the City Council. Permanent features of the site such as berms, access roads, building sites and protective drainage works require permits; (5) Construction of dams or reservoirs regulated or owned by the State or Federal Government; (6) Temporary stockpiling of quarried or mined products or earth for future processing, disposal or sale, if the stockpiling operations are conducted at least one hundred feet inside the property line of a parcel of land held by a single owner and the stockpiling is approved by the Planning Commission. Slopes in conjunction with stockpiles shall not exceed three to one; (7) Farming and agricultural grading operations on parcels at least ten acres in size which are zoned and used for farming or soil and water conservation work under the direct control of the United States Department of Agriculture Soil Conservation Service. Farming and agricultural grading operations do not include: (i) Construction of earthenwork dams which are not under the direct control of the United States Department of Agriculture Soil Conservation Service if the maximum depth to which water is or may be impounded is five feet or more, (ii) Excavation or earthfill intended to support a structure requiring a building permit; (H) Grading operation conducted by the City for capital improvement projects approved by the City Council; (8) Exploratory borings and trenches made as part of an application for a permit. (c) Emergencies. This article does not apply to any grading operation which is conducted during a period of emergency or disaster and which is directly connected with or related to relief conditions caused by the emergency or disaster.
Ask a question about Victorville law
Corpus searches the Victorville sections it holds and shows the ones that match, with their citations. Free, no sign-in.