Long Beach Municipal Code § 18.76.010 General.
18.76.010 - General.
A. Purpose. The purpose of this chapter is to promote and encourage the installation and use of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing the costs of, permitting for charging stations so long as this action does not supersede the Building Official's authority to identify and address higher priority life-safety situations. Consistent with Sections 65850.7 and 65850.71 of the California Government Code, this chapter creates an expedited and streamlined permitting process for the installation of electric vehicle charging stations and hydrogen-fueling stations.
B. Permits required. Electric vehicle charging stations or hydrogen-fueling stations shall not be installed or used without first having obtained a permit as required by Section 18.04.010.
C. Submittal documents. Submittal documents shall be governed by Chapter 18.05, except as provided in Section 18.76.030.
D. Fee. Fees for electric vehicle charging stations and hydrogen-fueling stations shall be governed by Chapter 18.06.
E. Inspection. Inspections shall be governed by Chapter 18.07.
F. Effective date. This chapter shall apply to all projects for the installation and use of electric vehicle charging stations submitted on or after September 30, 2016, or to all projects for the installation and use of hydrogen-fueling stations submitted on or after September 30, 2025. The applicable time period required by Section 65850.71 of the California Government Code shall apply to all projects for the installation and use of electric vehicle charging stations submitted on or after January 1, 2022.
(ORD-25-0019 § 1(Exh. A), 2025; ORD-22-0033 § 1(Exh. A), 2022; ORD-19-0031 § 1(Exh. A), 2019; ORD-16-0026 § 1(Exh. A), 2016)
