§ 15.10.340 — Permit application requirements

El Paso City Code (Supp. No. 95, Update 4: codified through Ordinance No. 019889, enacted June 23, 2026) · El Paso City Code § 15.10.340

Corpus is an independent public-information project, not the official City of El Paso website. Stable reference: corpuslaw.us/code/a05651db-f6ce-489b-a229-dfe46d83f18b

15.10.340 - Permit application requirements.

A. For each location, provider shall complete and submit to the city an application to locate a wireless facility or transport facility, using the application form provided by the city. The following items shall accompany the completed application form: 1. A one-time, nonrefundable application fee for review of the application in the amount provided in Section 15.10.050. 2. Documents necessary for the review or as requested by the city, including but not limited to: a. A map showing: (i) The location of the proposed installation, including GIS or street address information; (ii) The proximity of the proposed installation to special districts of the city, including but not limited to arts district, historic district, scenic areas and corridors, and airport zoning district; (iii) The proximity to schools, the El Paso Airport, and municipal parks; (iv) The proximity to historic landmarks; (v) The proximity to utility poles, node support poles, and other network nodes on a service pole, if any, and depicting the sidewalks, and ramps onto sidewalks required by applicable codes, TAS, or other law, including the Americans with Disabilities Act, and paved street surface and utility easements; and b. Disclosure if the proposed installation is: (i) In a residential area as described in Section 15.10.160; (ii) In an underground utility district or other area with undergrounding requirements; and (iii) On any facilities serving Sun Metro. c. A pre-permit survey completed by a qualified and experienced professional engineer in accordance with city's requirements, certifying that provider's wireless facilities or transport facilities can be installed on the identified structure in compliance with the applicable codes. The professional engineer's qualifications must include experience performing work for similar attachments on similar facilities. d. A photo simulation of the proposed facility(ies) along the right-of-way. e. Detailed plans for each wireless facility, transport facility, and ground equipment, including representative drawings or pictures of the intended network node and other equipment, and proposed dimensions of same. Such plans shall show strict compliance with the city's design manual, with the size limitations set forth in Chapter 284, with maximum pole height limitations set forth in Chapter 284, and with all applicable codes. f. Certification that the proposed wireless facility complies with applicable regulations of the Federal Communications Commission and that the proposed wireless facility shall not cause any interference with city's public safety radio system, traffic light system, or other city safety communications components. g. Certification that the proposed network node will be placed into active commercial service by or for a provider not later than the sixtieth day after the date the construction and final testing of the network node is completed. h. If the proposed location is on a service pole, provider shall have in place an executed license agreement with the city for the use of the service pole. (i) The permit application will be denied if this license agreement is not in place at the time the application is submitted. (ii) Representative drawings or pictures of the intended network node as intended to be collocated on the service pole shall be provided. (iii) Engineering and construction plans and drawings related to the collocation of the network node on the service pole, including where the proposed transport facilities will be connected to the network node as electrical power connections, shall also be provided. (iv) If the applicant is not the same as the licensee identified in the license agreement, the licensee shall sign the permit application or provide a letter of agency satisfactory to the city. The licensee in such license agreement shall be presumed to be the owner of the network node and ground equipment, and shall be fully responsible for them and the rental fees payable to the city thereunder. (v) If the requested location has already been approved for collocation by other entities, the application for the service pole shall be denied. i. If the proposed location lies within a highway right-of-way, the provider must provide evidence of a permit from the state or federal government. 3. City's acceptance of the submitted design documents does not relieve provider and its engineer of full responsibility and liability for any errors and/or omissions in the engineering analysis. B. The city will review applications for the installation of new node support poles to determine if the proposed location is in an area where a new streetlight is needed. If city determines that a new streetlight is needed at the proposed location, it will notify the provider and request the provider's assistance and cooperation in including the design and construction elements that will enable the city to attach a streetlight on the node support pole. If provider and city reach agreement on the streetlight attachment, reasonable incremental costs incurred by provider shall be reimbursed by city. C. The city shall review the permit application for completeness and notify the provider in writing if provider needs to submit additional or missing information. Such written notice will be provided within thirty days after receipt of a permit application for a network node or node support pole, or within ten days for a permit for a transport facility. The notice shall specifically identify the missing information. If provider does not submit the missing or additional information within one hundred eighty days of the notice, the provider's permit application for the requested location shall be deemed withdrawn. D. The city shall review the permit application to determine if the requested location and proposed installation complies with all applicable codes. 1. If the city denies the permit application, it will notify provider by electronic mail on the date the city denies the permit application, stating the basis for the denial. 2. Provider may cure the deficiencies identified by the city within thirty days by resubmitting the application, along with payment to the city for city's actual costs incurred in reviewing the resubmitted application. Such costs will be identified by city at provider's request. 3. The city's review of the revised application is limited to the deficiencies cited in the denial documentation. E. The city must approve or deny applications under this title in the following timeframes: 1. An application for a node support pole not later than the one hundred fiftieth day after the date the municipality receives the complete application. 2. An application for a network node not later than the sixtieth day after the date the municipality receives the complete application. 3. An application for a transport facility not later than the twenty-first day after the date the municipality receives a complete application. 4. An application for a permit for a node support pole, network node, or transport facility shall be deemed approved if the application is not approved or denied on or before the applicable date for approval or denial prescribed in this subsection. F. The city shall approve or deny the revised completed application after denial not later than ninety days after the date the city receives the completed revised application.

(Ord. No. 18717, § 1, 8-22-2017)