§ 44-132 — Green stormwater infrastructure tax abatement
Houston Code of Ordinances (Supp. No. 93, Update 2: codified through Ordinance No. 2026-0732, adopted Aug. 19, 2026) · Houston Code of Ordinances § 44-132
Corpus is an independent public-information project, not the official City of Houston website. Stable reference: corpuslaw.us/code/a0634799-665c-4700-a731-92ebe3719445
Sec. 44-132. - Green stormwater infrastructure tax abatement.
(a) Authorized facility. A facility is eligible for a green stormwater infrastructure tax abatement if: (1) It is either an authorized facility as described in section 44-127(a) of this Code or a brownfield facility; (2) Construction or alteration of the facility has not commenced prior to the application for abatement; and (3) The total project cost is reasonably expected to be at least $735,000, with a minimum total green stormwater infrastructure cost of $35,000. This type of tax abatement may be a stand-alone abatement or part of a standard economic development abatement. (b) Value and term of abatement. Abatement shall be granted effective upon the January 1 valuation date immediately following the date that both of the following events have occurred: (i) all permits required by the design manual for the green stormwater infrastructure have been obtained, and (ii) the construction or alteration of the facility has been completed under the terms of the agreement. The abatement may remain in effect for up to ten years. A facility described in subsection (a) of this section is eligible for abatement for 100 percent of the increase in facility's value over the base year value; provided, however, that the amount of abatement shall not exceed the total green stormwater infrastructure cost. (c) Eligible green stormwater infrastructure. To be eligible for abatement, a facility described in subsection (a) of this section must include at least one type of green stormwater infrastructure that either (i) meets the applicable design criteria for a low impact development design approach described in chapter 9 of the design manual; or (ii) involves urban forestry and native ecosystem restoration through the planting of trees or shrubs listed in appendices A-1, A-2 and D of chapter 33 of this Code. (d) Qualifications. To be eligible for abatement, a facility described in subsection (a) of this section must: (1) Include green stormwater infrastructure that is (i) expected to mitigate risk of flooding, reduce heat island effect or other climate-related hazards, improve water quality, sequester carbon, encourage water conservation, or restore native ecosystems, and (ii) designed in accordance with the design manual and the applicable water quantity and stormwater quality design criteria from the design manual; (2) Provide an economic benefit to the city, taking into consideration all relevant factors, including the size of the abatement, income from sales tax and franchise fees generated by the planned improvement, and any additional expense to the city in providing city services as a result of the improvement; and (3) Be reasonably expected to increase the value of the real or tangible personal property within the reinvestment zone. (e) Agreement. Upon designation of a reinvestment zone, the city may enter into an abatement agreement that shall include: (1) The items listed in items (3)—(5), (7), (8), and (10)—(14) of section 44-128 of this Code; (2) The estimated value to be abated and the base year value, provided that the amount of the abatement may not exceed the total green stormwater infrastructure cost; (3) The total project cost and the total green stormwater infrastructure cost; (4) A requirement that the facility and the green stormwater infrastructure be constructed pursuant to and in compliance with all applicable permitting requirements; (5) A requirement that the green stormwater infrastructure is maintained in compliance with the applicable design manual requirements, including annual stormwater quality permits and annual certification requirements; (6) A requirement that the owner maintain, and provide to the city for inspection, records with respect to the stormwater quality and water quantity benefits of the green stormwater infrastructure, such as mitigating risk of flooding, reducing heat island effect or other climate-related hazards, improving water quality, sequestering carbon, encouraging water conservation, or restoring native ecosystems; and (7) A requirement that the green stormwater infrastructure be made accessible to others for purposes of study and education regarding best practices for design, construction and maintenance of green stormwater infrastructure. (f) Taxability. From the date of execution of the abatement agreement to the end of the abatement period, the value of a facility described by subsection (a) of this section shall be taxable in the manner described in subsection (b) of this section.
(Ord. No. 2020-1091, § 8, 12-16-2020; Ord. No. 2022-344, § 4, 5-4-2022; Ord. No. 2024-624, §§ 2, 5, 8-28-2024)
Ask a question about Houston law
Corpus searches the Houston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
