Sec. 12-63. - Permit required to place DAS and/or small cell technology facilities; exemptions.
(a) A provider or applicant must obtain an infrastructure permit from the city before placing, installing, constructing, locating, or operating any DAS and/or small cell technology facility (and associated accessory equipment) on any support structure that is located on or within the rights-of-way, or private property, including substantially modifying the position or characteristics of any such existing facility thereon. (1) This article applies to the construction, modification, installation, removal and operation of small wireless facilities installed on, under, within, or along the rights-of-way as well as private property. (2) This article does not apply to video service systems, wireline services, or macro towers. (b) The director of urban development (the "director"), or his or her designee, will review and administratively process any request for a permit to determine whether, in the exercise of the director's reasonable discretion, it should be issued for the location and in the manner requested by the applicant. In this process, the burden is on the provider or applicant to demonstrate that the placement of the proposed DAS and/or small cell technology facility and associated accessory equipment or support structure is the minimal physical installation which will achieve the goal of enhancing the provisions of personal wireless services when considering all pertinent factors discussed in the provision immediately below. Except as set forth in this section or if an appeal is taken, this permitting process will be administrative and not require the approval of any city board or city official other than the director. (c) Factors and guidelines. The following non-exhaustive factors, standards, requirements, and guidelines may be evaluated and considered by the director when determining whether to issue a permit for placement of DAS and/or small cell technology facilities and associated equipment and infrastructure as well as other design requirements, regulations, and guidelines adopted by the city with respect to facilities and related infrastructure: (1) Planning commission approval will be required if a new support structure is necessary. In addition to the standard review criteria, the following criteria shall also be considered by the planning commission in considering an application for a new support structure: a. Spacing between support structures, b. Collocation availability, c. Appearance of the proposed support structure and facilities as a whole, taking into consideration design guidelines, standards, and regulations adopted by the city, and d. Impact to the surrounding environment; (2) The visual impact of placing the support structures or facilities in the subject area. All small cell technology facilities and accessory equipment and related infrastructure shall be designed and installed so as to minimize visual impact on the surrounding properties and public streets and rights-of-way; (3) The ability and specifications of the structures upon which the facilities and accessory equipment are placed to safely support those facilities and accessory equipment; (4) The character of the area in which the facilities are proposed for placement, including surrounding buildings, properties and uses. Any proposed new support structure shall be designed and installed to minimize clutter within the rights-of-way; (5) Whether the appearance and placement of the requested facilities are aesthetically consistent with the immediate area and/or needs landscaping or other screening features. Aesthetic considerations shall take into account the proposed location and applicable design guidelines, regulations, and standards adopted by the city and published in advance of the application therefor. All small cell technology facilities and accessory equipment and related infrastructure shall be designed and installed to be compatible with the character and aesthetics of the immediate area; (6) Whether the facilities are consistent with the historic nature and/or unique characteristics of the requested location. All small cell technology facilities and accessory equipment and related infrastructure are to be consistent with the historic nature and characteristics of a requested location. When proposed facilities are in designated historic districts or adjacent to or near designated landmarks, the application must be approved by the historic preservation commission or equivalent government body within the city as well as any applicable state and/or federal agency. (7) Whether the facilities meet the greater of the height limitations established for the zoned district in which a structure is located or ten (10) feet above the height of existing adjacent vertical infrastructure in the right-of-way; (8) Whether the facilities and infrastructure comply with design guidelines, regulations, and standards adopted by the city and applicable with respect to the proposed facilities, support structures, accessory equipment, infrastructure, or otherwise applicable to the application; (9) Collocation. To the extent reasonable, all facilities and associated accessory equipment that are placed in the city shall be attached to a pre-existing support structure that is owned, controlled or leased by a utility, franchisee, the city or other entity or person, with the permission of the owner of such structure. If the applicant demonstrates that no collocation opportunities exist in the area where a technologically documented need for a facility exists, the applicant may request that a new pole or other support structure be installed in that area for purposes of constructing the facilities. Before any new support structure is permitted, each of the following must occur: a. The applicant must have provided the city written evidence that no reasonable collocation opportunity exists. This documentation shall include, but not be limited to, affidavits, correspondence, or other written information that demonstrates that the applicant has taken commercially reasonable actions to achieve collocation in the requested location or area, that the applicant has pursued but been denied access to all potential collocation sites in the subject area (and the reasons for any such denial(s)), and otherwise show that the applicant is unable to collocate on an existing support structure, including for technical and other valid reasons; and b. The director recommends the placement of a new support structure in the right-of-way after thorough review by the city engineer and director of public works, or their designees; and, c. Newly constructed support structures shall be, to the extent reasonably possible, built in such manner as to readily accommodate collocation by no less than one (1) similar (though potentially competing) entity with equipment of equal or greater size. The owner of such structure shall not unreasonably deny another carrier from collocation. The collocation requirement may be waived by the City of Gulfport for good cause shown. Such waiver will not be unreasonably withheld; and d. The city's planning commission has approved the new support structure. (10) If a facility is attached to a utility pole or other support structure, no antenna or other part of the facility shall extend more than ten (10) feet above the height of such support structure or, if applicable, beyond the maximum height established by zoning ordinances specifically regarding or pertaining to small cell technology facilities and/or infrastructure. If the facility includes an antenna array or associated antenna equipment, the array or portion of such equipment closest to the support structure shall be flush mounted within six (6) inches of the support structure, or be contained in a canister that is a continuation of the approximate diameter of the support structure, and the array and equipment colored to match the support structure; (11) The location of any new facility shall be subject to review by the director for its visual impact and to avoid an appearance of "clutter" among other rights-of-way uses in the vicinity. In addition, existing support structures must be determined to be structurally capable of safely supporting the requested facilities and accessory equipment by a licensed engineer; (12) All wires and other hardware shall be located internal to the support structure or be contained in encasements within design guidelines adopted by the city. Accessory equipment shall be buried, placed within the pole or in a cabinet under the pole, and in compliance with public safety laws and regulations and with design guidelines, standards, and regulations adopted by the city and applicable to such infrastructure. The combined total volume of accessory equipment comprising a facility shall be no more than twenty-eight (28) cubic feet; (13) The color of antennas and accessory equipment shall be compatible with that of the support structure or in a manner that otherwise attempts to conceal the equipment against the background of the developed or natural environment. All new or replaced support structures shall be of neutral color and shall match the color and material of adjacent structures; (14) The facility (including the accessory equipment) shall not be illuminated unless required by applicable laws and regulations; (15) Display of logos, branding, or the like on the facilities in any way that may reasonably be construed as advertising shall be prohibited; (16) Whether applicant has provided certification that the proposed installation will not cause harm to the public or pose any undue risk to public safety (e.g., through a means of industry certified reports for EME exposure limits or disruption of visual site triangles related to traffic, etc.); (17) Whether the proposed installation may interfere with vehicular traffic, passage of pedestrians, or other use of the rights-of-way by the public. All small cell technology facilities and accessory equipment and related infrastructure shall be designed and installed so as to not interfere with vehicular traffic, pedestrian or bicycle passage, and other use of the rights-of-way by the public, whether existing or planned for the future; (18) If the proposed installation will disturb conditions on the rights-of-way, whether the applicant can demonstrate its ability and financial resources to restore the subject area to its preexisting condition following installation. The rights-of-way shall be restored to its pre-existing condition by applicant/permittee following any installation or construction; (19) Support structures that have multiple uses, including temporary or seasonal uses, shall not be used unless the applicant accommodates the multiple uses of such support structure; (20) Support structures and facilities, either in their installation or continued operation, shall in no way interfere with the telecommunications capabilities of emergency responders or any public safety personnel; (21) Overhead wires connecting antennas to the equipment associated with the facility (including accessory equipment) are not permitted. No additional guy or support wires shall be used in connection with a facility unless the facility is to be attached to a pre-existing structure that incorporated guy wires prior to application and the same conforms with city ordinances and regulations; (22) All facilities, including all accessory equipment, related equipment and appurtenances, and infrastructure, shall employ stealth technology and methods to conceal the appearance of each facility and such equipment/infrastructure; (23) All facilities proposed to be located on city-owned traffic signal or street light poles on rights-of-way shall include a structural analysis of the pole to confirm that the pole can structurally handle the additional load(s). If the pole cannot handle such a load, the applicant will be required to replace the city-owned pole with another pole approved by the director if a permit is issued on such application. The city shall retain ownership of the old pole and the new pole; (24) To help reduce pole and sidewalk clutter, the applicant agrees to allow the city to attach street signs and use the applicant's pole for other public purposes, as the city determines necessary, provided such use by the city does not substantially interfere with the provision of wireless services using the facilities. The city will provide reasonable advance notice to the applicant of any such use and allow the applicant to provide a response to any such proposed use by the city; (25) Accessory equipment shall be placed underground in areas where electrical and telecommunications utilities are then currently placed underground, provided such requirements shall not prohibit the replacement of existing structures; (26) All proposed facilities shall be no closer than two-hundred and fifty (250) linear feet from any other similar facility unless collocating on the same support structure. The director of urban development or his or her designee shall have the authority to allow proposed facilities to be less than two-hundred and fifty (250) linear feet based on a determination of specific technological need or physical or other line of sight obstruction; (27) The proposed installation shall not interfere with the visual sight triangle as determined by the city engineer or his or her designee; (28) The maximum height of a facility mounted to an existing support structure shall be no more than ten (10) percent taller than the support structure on which the facility is located and shall not exceed fifty (50) feet in height, including antennas unless otherwise approved by the director of urban development or his or her designee. (29) The maximum height of a new support structure shall be no more than ten (10) percent taller than other adjacent existing structures and shall not exceed fifty (50) feet in height, including antennas, unless otherwise approved by the director of urban development or his or her designee. (30) All support structures installed in the rights-of-way must be designed to the current version of the AASHTO ("American Association of State Highway and Transportation Officials") standards or specifications for wind and load calculations. (31) That the applicant covenants and agrees to indemnify, defend, save, and hold harmless the city, and its agents, officials, officers, and employees from and against any and all claims, injuries, losses, liabilities, damages, charges, costs, and expenses (including reasonable attorneys' fees and costs), whether suffered by the applicant or any other person (including the city, its agents, or employees), which may occur on the property of the city or elsewhere, on account of or by reason of any matters which arise during, or from or out of, the issuance of the permit described herein or which may materially affect the issuance of the permit described herein, except to the extent that any such matter is caused by the sole negligence or intentional act of the city. (d) The following are exempt from having to obtain a permit under this article and no permit is required: (1) A small cell technology facility owned by the city or state or federal government erected for a state of emergency officially declared by a federal, state, or local government and where the mayor or city's governing authority has made a written determination of public necessity for the facility, and only during the duration of the state of emergency; and (2) A public safety facility owned by the city, state, or federal government. (3) A facility owned and operated by the city for public purposes.
(Ord. No. 3002, § 2, 6-18-19)
Ask a question about Gulfport law
Corpus searches the Gulfport sections it holds and shows the ones that match, with their citations. Free, no sign-in.